The construction period is significantly shortened compared to conventional (single pipe) scaffolding! The components are for supporting structures and can withstand up to 5 tons per column.
The "Multi-Angle Method" allows for significantly shorter construction periods compared to conventional (single pipe) scaffolding due to its wedge-type connections. Calculation documents based on JIS (A8972 for slope and embankment construction) are created for each site. Additionally, the components are designed for support work, capable of withstanding up to 5 tons per column, and the perimeter is equipped with handrails and kickboards, ensuring safe construction. 【Features】 ■ Components are designed for support work, capable of withstanding up to 5 tons per column ■ Assembly and disassembly can be done quickly using only a hammer ■ Handrails, mid-rails, and kickboards can be installed around the perimeter of the working platform ■ There is no loosening of the wedges due to vibrations from heavy machinery or drilling machines after assembly ■ The surface treatment of the products is hot-dip galvanized, providing excellent rust resistance and durability *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
【Other Features】 - Each component is designed to be minimal and lightweight, making manual transportation easy. - Various base materials are available, allowing for construction that fits the terrain. - Calculation documents based on JIS (A8972 for slope and embankment construction) are created for each site to ensure safety. *For more details, please refer to the PDF materials or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Uses】 ■Anchor platform ■Boring platform ■Rock bolt platform ■Material platform (work platform) *For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Nichizo Industries promotes the provision of safe temporary equipment and the implementation of safety management inspections, maintaining zero fatal accidents for 50 years since its founding. Established with the goal of "eliminating construction labor accidents," it started as a manufacturer of temporary equipment centered around scaffolding. As a leading company in the temporary equipment industry, it is engaged in various new initiatives.