Speedy and low-cost abdominal lifting and filling method!
The "MAX Tube" is a product that dramatically improves the backfilling work in earth retention excavation projects. It can be easily installed by simply passing a pipe through the MAX Tube and hanging it like a clothesline, eliminating the need for support due to its sheet strength and durability. Furthermore, from installation to completion of pouring, a team of three workers and one welder can finish a site with 100 meters of H-shaped steel in one day. 【Features】 ■ Easy installation (no support needed) ■ Clean ■ Speedy ■ Easy removal ■ Sorting and recycling *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Standard Specifications】 Cut the 100m material to the required length on-site, fold the ends, and secure them with a medium-sized handheld stapler for easy completion. The inlet can also be installed at any desired location using a standard cutter, achieving a lower cost. (For instructions on how to secure with a stapler, please request the construction procedure manual.) *For more details, please download the PDF or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Kishimura Co., Ltd. sells and rents various products, including MAX tubes, that dramatically enhance construction work. Additionally, we are currently working on the development of a new type of pollution prevention device for practical use. Please feel free to contact us if you have any requests.