Covers the wall with a telescopic panel! Two-way adjustment of components is possible in both vertical and horizontal directions.
"PERI GRIDFLEX" is a standardized, highly flexible slab formwork that improves labor productivity and ensures high safety. Since the assembly direction can be changed, it minimizes filler areas and maximizes the area formed with standard panels. There is no need to add other components. Two-way adjustment of components in both vertical and horizontal directions is possible, allowing for quick responses to adjustments needed for each building size with adjustment panels. [Features] ■ Minimizes the number of panels and props ■ Significantly simplifies work with color-coded panels by type ■ Can continue assembly from the slab even after changing direction ■ Can be assembled around columns using flexible components ■ Formwork plywood can be freely selected For more details, please refer to the catalog or feel free to contact us.
Inquire About This Product
Related Videos
basic information
【Main Components】 ■ Props and Prop Head GFH ■ Standard Panel GFP ■ Formwork Plywood 【Panel Color Coding】 ■ Standard Panel: White ■ Short Side Adjustment: Red ■ Long Side Adjustment: Yellow 【Assembly Procedure】 ■ Hook one side of the standard panel ■ Use the shuttering aid to lift and position it horizontally ■ Install the props and erect them vertically ■ Lay the panels *For more details, please refer to the catalog or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For specific implementation examples, please refer to the related video on YouTube. At Perry Japan, we conduct tours of the system formwork product exhibition hall, study sessions on system formwork, assembly experiences, and product seminars at the Ibaraki stockyard, based on the concept of "Listen, See, Touch/Ride, Assemble" to meet our customers' requests. *For more details, please refer to the catalog or feel free to contact us.
Detailed information
-
(Performance Introduction) "New Construction of Iejima Paid Nursing Home" In the construction of a nursing home on Iejima Island, Okinawa Prefecture, our lightweight resin formwork (DUO) and aluminum slab formwork (GRIDFLEX) were used.
-
RC 1-story building Building area: 1,364 square meters Total floor area: 1,359 square meters Formwork construction area: Foundation part approximately 1,500 square meters, above ground floor: approximately 3,500 square meters (total: approximately 5,000 square meters)
-
The needs on-site were mainly identified as the following three points: reduction in the number of materials, reduction in the number of workers, and a higher work efficiency. To address these issues, Perry Japan proposed the lightweight resin formwork system (DUO) and the aluminum slab formwork (GRIDFLEX), which were newly introduced to the Japanese market in 2019. These solutions contributed to reducing the number of materials, shortening work time, and increasing labor efficiency.
-
The needs on-site were mainly identified as the following three points: reduction in the number of materials, reduction in the number of workers, and a higher work efficiency. To address these issues, Perry Japan proposed a lightweight resin formwork system (DUO) and aluminum slab formwork (GRIDFLEX), which were newly introduced to the Japanese market in 2019. These solutions contributed to reducing the number of materials, shortening work time, and increasing labor efficiency.
-
By using the lightweight resin formwork system (DUO) and aluminum slab formwork (GRIDFLEX), it is possible to reduce material transportation costs, decrease the number of workers, and achieve cost savings through labor-saving measures. For more details, please refer to the catalog or feel free to contact us.
catalog(3)
Download All CatalogsCompany information
Perry Japan Co., Ltd. was established in January 2006 as one of PERI's bases in over 60 countries worldwide. Our staff, including sales, technical, and construction instructors, are dedicated to providing various PERI products and services to our customers in Japan. We are actively working to address the numerous challenges our customers face, such as improving safety and quality during concrete placement at construction sites, reducing labor, shortening construction periods, and cutting costs, by providing systematic formwork and shoring solutions. *Please feel free to contact us regarding the applications, technical materials, construction methods, techniques, and examples of PERI products.