Lightweight fill: Lightweight glass foam material S2
Lightweight glass foam material S2
Lightweight materials with excellent workability, drainage, and strength! Easy installation with standard heavy machinery. Abundant track record nationwide.
Lightweight glass foam material is a lightweight fill material for civil engineering applications. With a unit weight of 4-5 kN/m³, it effectively utilizes its lightweight properties to reduce settlement in embankments and road surface corrections on soft ground, alleviate wall pressure behind retaining walls, and lessen the load on underground structures. It can also be used as a mixed lightweight soil utilizing site-generated soil. It has been widely adopted in public works by the Ministry of Land, Infrastructure, Transport and Tourism, local governments, highways, and private construction projects, with a proven track record of deliveries nationwide. Since lightweight glass foam material is made from waste glass bottles, it does not leach harmful substances, complies with soil environmental standards, and contributes to a recycling-oriented society. In construction projects utilizing lightweight glass foam material, it can also serve as a merit material for public works bidding through creative ideas. Lightweight glass foam material is an eco-mark product (17 131 006). - Features ○ The civil engineering type is a gravel-like porous body ranging from 2 to 75 mm. ○ Easy construction with compaction using standard heavy machinery. ○ Excellent drainage even during compaction. ○ Lightweight and easy to handle, with no preparation curing period, allowing for shortened construction time. ○ High flexibility on construction sites, making it possible to work even with distorted terrain or buried pipes. Suitable for large-scale projects. ○ Can be combined with other lightweight materials. ○ Eco-mark product (17 131 006). For more details, please contact us or download the catalog for further information.
Inquire About This Product
basic information
【Lineup】 ○ Dry specific gravity 0.4~0.5 → Independent bubble type that exceeds lightness ● For more details, please contact us or download the catalog to view.
Price information
Please contact us for the price.
Price range
P2
Delivery Time
P3
※Immediate delivery available for 1,000m³ or less; for 1,001m³ or more, please inquire.
Applications/Examples of results
【Applications】 ○ Lightweight fill material for soft ground ○ Correction of level differences between structures and roads (bridges, box culverts, etc.) ○ Lightweight backfill material for reducing lateral pressure on retaining walls, tail arms, tensioners, etc. ○ Protection of underground structures, lightweight fill material for reducing earth pressure ○ Fill material for raising ground level ○ Backfill material for bridge abutments ○ Combination with other lightweight materials ● For more details, please contact us or download the catalog to view.
Detailed information
-
Lightweight fill material for roads on weak ground Construction location: Osaka Prefecture Quantity: 731 cubic meters Client: Kinki Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism
-
Reduction of load on underground structures (underground parking lot ceiling) Construction location: Ishikawa Prefecture Quantity: 416 cubic meters Client: Kanazawa City
-
On-site generated soil mixed, backfill, underground structure load reduction Construction location: Tokyo Quantity: 9,176 cubic meters Client: Tokyo Metropolitan Government
-
Bridge abutment backfill material Construction location: Yamagata Prefecture Quantity: 880 cubic meters Client: Yamagata Prefecture
-
Tensor backing material Construction location: Niigata Prefecture Quantity: 345 cubic meters Client: Ministry of Land, Infrastructure, Transport and Tourism, Hokuriku Regional Development Bureau
-
Reinforced earth wall backfill material Construction location: Niigata Prefecture Quantity: 2,485 cubic meters Client: East Nippon Expressway Company Limited
-
Tail armor backfill material Construction location: Ishikawa Prefecture Quantity: 3,753 cubic meters Client: Ministry of Land, Infrastructure, Transport and Tourism, Hokuriku Regional Development Bureau
-
Highway section differential correction, roadbed lightweighting Construction location: Niigata Prefecture Quantity: 414 cubic meters Client: East Japan Expressway Company Limited
-
Combination with EPS, step correction, lightweight subgrade Construction location: Kyoto Prefecture Quantity: 380 cubic meters Client: Kyoto Prefecture
catalog(2)
Download All CatalogsCompany information
Sanyō Land Transportation Co., Ltd. was established in 1988. We have grown with the support of our customers in the delicate field of handling glass, and we have reached the present day. Due to our focus on glass delivery, we turned our attention to the recycling of waste glass and began our zero-emission activities. We launched a waste glass recycling business, developed, manufactured, and sold glass recycling products, and have now popularized them as lightweight fill materials, soil improvement materials, and security gravel. With the motto "We want to be of help to people, society, and the global environment, even just a little," we contribute to society in the 21st century through our recycling business.