Prevent collapse by stabilizing cut slopes and embankment earth! *For a limited time, we are offering technical materials that include examples of application and construction sequence for free!
The "RBP Wall Method" is a slope construction technique that involves excavating the ground from the top of the slope while securing the slope with reverse bolt panels as it is lowered. By combining reverse bolt paneling with rebar insertion, it prevents collapse through the stabilization of cut slopes and the surrounding ground. This method is applicable for road widening, land development, steep slope countermeasures, fall prevention measures, and slope stabilization in areas with small ground stress, limited space, or adjacent to structures. [NETIS Number: QS-160035-A] **Features** - Can be extended in either vertical direction - Always ensures slope stability - Allows excavation on steep slopes even in areas with low ground strength - Has significant resistance to ground behavior during earthquakes and other events *For detailed features, application examples, and construction procedures, please download the PDF of the "RBP Wall Method" technical documentation.*
Inquire About This Product
Related Videos
basic information
【Features Details】 1. It can be extended in either direction from any fixed point (line). 2. Excavation is carried out to the height determined by calculations, and immediately after, rebar insertion work is performed, ensuring constant slope stability. 3. While lowering, reinforcement materials (rebar) are added to the cut slope, allowing excavation at steep gradients even in areas with low ground strength. 4. The reverse bolt panel is securely connected to the upper and lower panel plates with PC steel materials, forming an extremely stable slope and providing significant resistance to ground movements such as earthquakes. *For more details, please refer to the catalog or feel free to contact us.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please refer to the catalog or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Our company was founded in 1958 and specializes in underground special civil engineering works such as underground continuous walls, underground obstacle removal, ground improvement, and pipeline construction. In recent years, we have expanded our business operations to include slope work and construction. There is a growing social demand for securing the natural environment, seismic reinforcement, liquefaction prevention, restoration of structures, and urban redevelopment, which have become pressing issues in recent years. In response to these social needs, we have developed seismic reinforcement and liquefaction countermeasure methods such as the "Ultra Multi-Point DP Method" and the "High Grip Grout Method." For structural restoration, we utilize our in-house developed restoration method called "Suiheikun," and for urban redevelopment, we are conducting research and development of new methods such as the "Hiro Work Kmigty Method," "Bauer Method," and "Super Top Method," aimed at underground obstacle removal. Additionally, as part of our eco-friendly initiatives, we are researching and developing methods that use bubble drilling fluid to reduce industrial waste, striving to contribute to society through high-quality construction and services. We aim to continue responding to the needs of the times by deploying a variety of specialized techniques and uniquely developed methods.