Next-generation excavation work: mud-water and mud-soil pressure single-process small-diameter thrusting.
Full soil type compatibility from ordinary soil to bedrock! Economical due to starting from a small shaft! Achieves speedy advancement with a single process! Rolling stop with joint pipes!! That's why it's fast!! That's why the straightness accuracy is good!! 【Features】 1. Wide range of soil type adaptability 2. Realization of smaller shafts 3. Increased convenience for retrieval 4. Advancement of 200m per span 5. Compact in all aspects 6. Addresses ground issues 7. Construction can be performed by selecting the excavation method according to soil type 8. Not only single-component lubricants, but also two-component lubricants can be injected according to soil type For more details, please feel free to contact us.
Inquire About This Product
basic information
【Specifications】 [Small Piles] ■Starting from φ2000mm (φ250mm to 350mm) ■Starting from φ2500mm (φ350mm to 600mm) *For more details, please feel free to contact us.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company was founded in 1958 and specializes in underground special civil engineering works such as underground continuous walls, underground obstacle removal, ground improvement, and pipeline construction. In recent years, we have expanded our business operations to include slope work and construction. There is a growing social demand for securing the natural environment, seismic reinforcement, liquefaction prevention, restoration of structures, and urban redevelopment, which have become pressing issues in recent years. In response to these social needs, we have developed seismic reinforcement and liquefaction countermeasure methods such as the "Ultra Multi-Point DP Method" and the "High Grip Grout Method." For structural restoration, we utilize our in-house developed restoration method called "Suiheikun," and for urban redevelopment, we are conducting research and development of new methods such as the "Hiro Work Kmigty Method," "Bauer Method," and "Super Top Method," aimed at underground obstacle removal. Additionally, as part of our eco-friendly initiatives, we are researching and developing methods that use bubble drilling fluid to reduce industrial waste, striving to contribute to society through high-quality construction and services. We aim to continue responding to the needs of the times by deploying a variety of specialized techniques and uniquely developed methods.