[Construction Photo Collection Giveaway] Equivalent seismic reinforcement effect to complete slits! Introducing construction examples in condominiums.
The "Non-Pick Method" is a post-construction slitting process that allows for continuous and consistent construction from end drilling to groove cutting with a dedicated cutting machine (equipped with a special bit) in a single setup. It is a groundbreaking method that requires no chipping, produces low vibration and low noise, and generates minimal waste with excellent precision. This photo collection of the construction showcases examples of the "Non-Pick Method" used in a certain apartment building in Tokyo. It can be utilized as a partial slitting method that allows construction to be carried out while residents are living in the building, achieving seismic effects equivalent to those of complete slitting. We encourage you to take a look at this opportunity. 【Main Features】 ■ Continuous and consistent cutting can be achieved with a single setup of the dedicated cutting machine ■ The precision and finish of the slits are outstanding ■ Dust-free construction with low vibration and low noise, requiring no chipping ■ Drilling and cutting debris is in a slurry form (liquid mixed with sand particles), making disposal easy For more details, please contact us or download the catalog.
Inquire About This Product
basic information
【Case Studies - Construction Photos】 (1) Certain condominium in Tokyo (2) Pre-construction condition (3) Simple vertical rebar survey (4) Simple curing (water curing) (5) Anchor hole drilling (6) NP dedicated cutting machine setup completed (7) Preliminary hole drilling (8) Piece measurement (9) NP dedicated special bit (10) Concrete cutting condition with NP dedicated special bit (11) Concrete cutting completed (12) Existing rebar rust prevention treatment (13) Slit width measurement (14) Slit length measurement (15) Slit excavation depth measurement (16) Primer treatment (17) Fire-resistant slit material with secondary seal (18) Slit material installation (19) Slit material installation completed ● For more details, please contact us or download the catalog.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ○ As an example of post-construction slit work ● For more details, please contact us.
catalog(2)
Download All CatalogsNews about this product(1)
Company information
We are a group dedicated to alleviating the anxiety caused by earthquakes, ensuring that everyone can live their daily lives with peace of mind. Drawing on our past experiences, we do not settle for the status quo but instead focus our wisdom on the development of new products, continuously pursuing safety. Our products are used in various fields suited to their respective applications, widely utilized with the motto of providing peace of mind in daily life. We are committed to gathering the collective wisdom of all our employees to address the uncertainty that can strike at any time, and it is our mission to provide products that consistently prioritize safety and security. We will continue to strive with the aim of contributing to society.