Box culvert construction method "Box Bearing Horizontal Pulling Method"
○NETIS: KT-990571-V This is a method for installing box culverts by lowering them from a designated entrance and pulling them along the rails using bearings (steel balls) and a winch or mobile machinery. It can be installed even in locations with obstacles or in narrow spaces.
Inquire About This Product
basic information
**Features** 1. Single construction yard The crane does not need to move, allowing for the product to be lifted and lowered on-site. Construction can proceed even with overhead obstacles such as power lines and elevated structures. 2. Easy movement with a winch The product is moved by sliding on steel balls located on rails. 3. Narrow excavation width This minimizes traffic restrictions. 4. Short construction period Since the lifting, moving, and laying of the product can be done in separate processes, it allows for a reduction in construction time. For catalogs and other features or details, please contact us http://www.landes.co.jp/product/18
Price range
Delivery Time
Applications/Examples of results
[Applications/Performance] ○ Box culverts ○ Roads ○ Bridges ○ Waterways
Company information
Landess Corporation creates products made from concrete, and thanks to your support, we are celebrating our 60th anniversary. Our company utilizes manufacturing technology centered on the theme of coexistence between people and nature, contributing to the creation of a sustainable society and a safe, secure, and comfortable living environment.