A switching device established through years of manufacturing experience, ensuring high safety and consideration for the surrounding environment!
The "AR Series" is a manual pin rack type opening and closing device developed for small water gates. Established through years of manufacturing experience, it is a highly safe opening and closing device designed with consideration for the surrounding environment. The main components are designed with a sealed structure, making it possible to be submerged, so it can also be used for opening and closing mechanisms for ponds. It features simplicity, lightweight and compact design, low cost, self-locking function, and easy operation. For more details, please contact us or refer to the catalog.
Inquire About This Product
basic information
【Features】 ○ Designed for higher safety and lower price settings → A reliable opening and closing device ○ Simple, lightweight, and compact ○ Low cost ○ Self-locking function ○ Easy to operate ○ Designed to be submerged for use in pond opening and closing devices 【Main Specifications】 ○ Model: AR-05 / AR-10 ○ Opening and closing capacity (kN): 5 / 10 ○ Opening and closing speed (cm/30rev): 20.3 / 12.6 ○ Lifting time (for a lift height of 1m): approximately 4 minutes 56 seconds / approximately 7 minutes 57 seconds ○ Manual operating force (N): 100 or less ○ Rack rod limit buckling length (cm): 253 / 293 ○ Body weight (kg): 30 / 56 ● For more details, please contact us or refer to the catalog.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please contact us or refer to the catalog.
Company information
Saito Iron Works celebrated its 75th anniversary in May 2023. We would like to express our heartfelt gratitude to our customers, business partners, and all employees who have supported us thus far. In addition to the flood control projects we have been undertaking, we have recently been focusing on disaster prevention gates to address issues such as increased water levels due to sudden heavy rain and tsunamis, steadily building our track record. Aiming to become a 100-year company, we will challenge ourselves in various businesses in the next 25 years, in addition to our sluice gate projects. I am confident that this will lead to the development of our employees, including myself, and contribute to the stability and prosperity of the company. We will continue to strive towards realizing a society in harmony with water, people, and nature, both now and in the future.