We have a track record of delivering flood prevention equipment such as horizontal pull gates and swing gates in various locations!
Regarding the horizontal gates, we have a track record of supplying flood prevention equipment to the Funaida Nishi area in Kiho Town, Mie Prefecture, Himeji Port in Hyogo Prefecture, and others. For swing gates, we have supplied to Tanabe Fishing Port in Wakayama Prefecture and others. For mitre gates, we have supplied to Miwasaki Fishing Port in Wakayama Prefecture and others. For more details, please contact us or refer to our catalog.
Inquire About This Product
basic information
【Examples of Delivery Achievements】 [Horizontal Gate] ○ Kibō Town, Mie Prefecture, Funada West District → Type: Steel Plate Girder Horizontal Gate → Clear Span: 4.0M → Effective Height: 2.6M → Opening and Closing Method: Electric Rack Type (with backup motor) → Operation Method: Machine-side and Remote Operation ○ Himeji Port, Hyogo Prefecture → Type: Aluminum Alloy Horizontal Gate → Clear Span: 13.0M → Door Height: 1.5M → Operation Method: Electric Rack Type [Swing Gate] ○ Tanabe Fishing Port, Wakayama Prefecture → Type: Stainless Steel Swing Gate → Clear Span: 3.3M → Door Height: 0.5M → Operation Method: Manual [Mitre Gate] ○ Miwasaki Fishing Port, Wakayama Prefecture → Type: Aluminum Alloy Mitre Gate → Clear Span: 3.3M → Door Height: 0.9M → Operation Method: Manual ● For more details, please contact us or refer to the catalog.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please contact us or refer to the catalog.
Company information
Saito Iron Works celebrated its 75th anniversary in May 2023. We would like to express our heartfelt gratitude to our customers, business partners, and all employees who have supported us thus far. In addition to the flood control projects we have been undertaking, we have recently been focusing on disaster prevention gates to address issues such as increased water levels due to sudden heavy rain and tsunamis, steadily building our track record. Aiming to become a 100-year company, we will challenge ourselves in various businesses in the next 25 years, in addition to our sluice gate projects. I am confident that this will lead to the development of our employees, including myself, and contribute to the stability and prosperity of the company. We will continue to strive towards realizing a society in harmony with water, people, and nature, both now and in the future.