Improved workability + maintenance support Precast snow-melting pipe block
Conventional blocks consist of a "protrusion" where the pipe end protrudes from the body and a "recess" that fits into the end face of the body, and they were connected in sequence. In the new type of block, a portion of the end of the block body is notched to create a space for connecting joints, allowing the joint stored in one of the bodies to be slid and connected to the pipe ends after the block is installed. As a result, we have improved workability, maintainability, and safety. For more details, please download the catalog or contact us.
Inquire About This Product
basic information
【Features】 ○ Improved Workability → Can be installed relatively easily, and there is no need for the block structure itself to be slid. → Reduces the labor required for installation and work with heavy machinery, thereby improving workability. ○ Enhanced Maintenance → Allows for the replacement of just one unit by storing the joints and performing vertical installation. → Reuse of removed blocks is also possible. → When used for repairing existing site-cast snow melting pipes, it minimizes the area for concrete placement. ○ Increased Safety → Since there is no need to slide the block structure itself, safety during installation work is improved. ● For more details, please download the catalog or contact us.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please download the catalog or contact us.
catalog(1)
Download All CatalogsCompany information
A comfortable and convenient life, along with the blessings of nature. We need both of these. While making our communities safer and more comfortable, we must protect the natural environment. It's a challenging theme, but if we face it seriously, we can surely achieve it. What makes this possible is creativity and technology. Kowa will leverage the technical know-how we have accumulated and continue to strive for a balance between the two.