Revolution in combined purification tank construction!!
By converting the bottom slab of the sewage treatment tank, which has been cast in place, into a secondary product, the construction period can be significantly shortened. Generally, it takes about half a day from the start of excavation to the completion of the installation of the sewage treatment tank.
Inquire About This Product
basic information
【Features】 ■ Compatible with various sizes of septic tanks (for 5 to 10 people). ■ Installation of the septic tank can be completed in about half a day. ■ Installation does not require any special skills. *For other functions and details, please feel free to contact us.
Price information
Please feel free to contact us.
Delivery Time
Applications/Examples of results
【Purpose】 ○Installation work for septic tanks
catalog(1)
Download All CatalogsCompany information
Since our establishment in 1959, we have been engaged in the manufacturing and sales of concrete products with the motto "Aiming to create an environment with moisture." Moving forward, we will continue to support the development of moisture-rich infrastructure that coexists with nature through our product creation. 【Products We Handle】 ■ NETIS (New Technology Information System of the Ministry of Land, Infrastructure, Transport and Tourism) registered products ■ Products certified by the Minister of Land, Infrastructure, Transport and Tourism (Article 14 of the Enforcement Order of the Land Development Act) ■ Award-winning products from the National Technology Development Award ■ Introduction of new technologies, new methods, and new products ■ Products for retaining walls and slopes ■ Environmental and river products ■ Road products ■ Waterway products ■ Drainage products ■ Sewage products ... and more.