The construction platform piles can be installed using U-shaped formwork and flat formwork.
The cell formwork for construction piles is a type that is assembled by binding "U-shaped cell formwork" and "single-sided formwork" for construction piles. 【Assembly and Installation Method】 Install the U-shaped cell formwork around the construction pile, insert the main rebar, and fit it by hanging the sliding rebar. Fit the single-sided formwork and secure the connection points between the main rebar and the formwork with binding wire. *For more details, please refer to the catalog or contact us.
Inquire About This Product
basic information
【Features】 ○ Installed on the foundation piles using U-shaped formwork and flat formwork ○ Reinforced by securing the connection points between the main reinforcement and the formwork with binding wire ○ Ideal for foundation piles. ● For other functions and details, please contact us.
Price information
Please feel free to contact us.
Delivery Time
※Please feel free to contact us.
Applications/Examples of results
【Usage】 ○ Unified formwork production, reinforcement, curing, and formwork removal ○ Reinforcement of openings in apartments ● For other functions and details, please contact us.
catalog(2)
Download All CatalogsCAD data(3)
Model number | overview | File |
---|---|---|
Cellbon floor plan CAD data |
|
|
Cellbon floor plan CAD data 2 |
|
|
CAD data for the installation diagram of the Selbon support pile. |
|
Company information
The newly developed slab opening slide reinforcement muscle box "Selbon" not only accurately addresses these issues but is also a groundbreaking product developed to solve the processes of traditional construction methods (formwork production, reinforcement, curing, and formwork removal) with a single component, truly looking from the present to the future.