Realizing dreams faster and more safely through high-precision systematization.
By using it in conjunction with the Landcross [Truss Type], optimal bridge planning is possible. For the first time, distribution cross beams and composite rubber shoes have been adopted for leased bridges. The ends of the main girders are tapered to facilitate the approach to the roadway. A dedicated scaffolding for construction has been systematized with the main body.
Inquire About This Product
basic information
By using it in conjunction with the Landcross [Trust Type], optimal bridge planning is possible. For the first time, distribution crossbeams and composite rubber shoes have been adopted as a leased bridge. The ends of the main beams are tapered to facilitate the approach to the roadway. A dedicated scaffolding for construction has been systematized with the main body.
Price range
Delivery Time
Applications/Examples of results
Temporary road bridge, construction temporary pier
catalog(2)
Download All CatalogsCompany information
We will accurately capture our customers' needs from a global perspective on creating a comfortable regional environment, integrate expertise across all construction fields, respond to various challenges, and actively work on developing new areas of demand.