Safe reverse winding construction method for ground reinforcement.
The PAN (Panel And Nail) WALL method is a construction technique based on the theories of steep slope stabilization and ground reinforcement. By achieving a steep slope (1:5 to 1:1), it preserves the natural slope as much as possible and is a highly safe method based on the reverse wrapping technique.
Inquire About This Product
basic information
【Features】 ○ Reduction of long slopes and excavation residual soil volume due to steep slope (1:1 to 5:1) conversion. ○ Protection of obstacles and prevention of ground loosening and collapse accidents during construction by using reverse construction techniques to finish structures from top to bottom. ○ Improvement in quality, shortening of construction period, and labor-saving through the precasting of surface protection works. ○ Landscape adaptation through diversification of design aesthetics. ○ Selected construction method registered with the Ministry of Land, Infrastructure, Transport and Tourism NETIS registration number CB-980093-A "New Technology Utilization Support Measures." ● For more details, please contact us or download the catalog.
Price information
Please feel free to contact us.
Delivery Time
※Please feel free to contact us.
Applications/Examples of results
For more details, please contact us.
catalog(1)
Download All CatalogsCompany information
Since our establishment in 1930, we have been dedicated to producing various concrete products, starting with thick slate. In 1958, we began the production of ready-mixed concrete and concrete secondary products with the establishment of the Nagakute factory. We have also obtained JIS factory certification and have worked to improve quality control and enhance production facilities to meet the needs of our customers and the demands of the times.