Fiberglass composite high-strength CIPP
The K-2 method is a technology for rehabilitating main pipes and connection pipes within aging sewer pipelines without excavation.
Inquire About This Product
basic information
【Features】 ● Uses a composite of polyester felt and fiberglass felt, impregnated with thermosetting resin. ● The pull liner is inverted using air pressure from an inversion machine. ● Lining material is inserted using pulling force. ● It is possible to insert rehabilitation material without being affected by steps, bends, stagnant water, or infiltrating water. ● The flange-mounted installation pipe lining material is inverted and inserted using air pressure from inside the main pipe and cured under pressure with hot water. ● The flange part between the rehabilitated main pipe and the installation pipe is bonded with an adhesive mat. ● Rehabilitation with integrated watertightness is possible. *For more details, please contact us or download the catalog.
Price information
-
Delivery Time
Applications/Examples of results
Sewer main Sewer connection pipe
catalog(1)
Download All CatalogsCompany information
Kamikawa Industries Co., Ltd. is a company that conducts pipe maintenance and repair work.




![Piping Construction "Continuous Water Freezing Method (Building)" [Daiyu News] October 2019 Issue](https://image.www.ipros.com/public/product/image/fb9/2000556668/IPROS27475611165653757560.png?w=280&h=280)
![High water-retaining pavement material Libio[ai] Water Retention](https://image.www.ipros.com/public/product/image/136/2000051463/IPROS26654952877611851759.jpeg?w=280&h=280)


