Sand Erosion Prevention Works - Greenland Method
This method involves applying synthetic resin-based sand control agents to prevent flying sand and dust from bare land, such as construction sites and reclaimed land, for a certain period, and by sowing seeds of grasses and turf to establish vegetation that will permanently prevent flying sand and dust. 【Features】 - It is non-toxic to humans and fish, ensuring safety during and after construction. - The sand control agent penetrates and binds soil particles, forming a solid layer that maintains stable sand control effects even under heavy rain or strong winds of 20 m/sec for an extended period. - The sand control agent is colored green, making it easy to confirm the application area. ● For other functions and details, please contact us.
Inquire About This Product
basic information
This method involves applying synthetic resin-based dust prevention agents to prevent flying sand and dust from bare land and reclaimed land, thereby preventing flying sand for a certain period, and permanently preventing flying sand and dust by sowing seeds of grasses and turf. 【Features】 ○ It is non-toxic to humans and fish, ensuring safety during and after construction. ○ The dust prevention agent penetrates and binds soil particles, forming a solid layer that maintains stable dust prevention effects even under rainfall and strong winds of 20 m/sec for a long time. ○ The dust prevention agent is colored green, making it easy to confirm the application area. ● For other functions and details, please contact us.
Price information
-
Delivery Time
Applications/Examples of results
【Purpose】 ○Slope protection work
Company information
Mito Green Service Co., Ltd. contributes to the local community through "the restoration of nature," "coexistence with nature," and "the realization of a sustainable society," supporting the creation of a life that is "healthy," "comfortable," and "peaceful."






![Ground reinforcement work [Performance certification method] Cross-wing column method](https://image.www.ipros.com/public/product/image/321794/IPROS4293062677374440758.png?w=280&h=280)
![Ground reinforcement construction [Performance certification method] Pure pile method](https://image.www.ipros.com/public/product/image/321794/IPROS13021923202802504447.png?w=280&h=280)
![Ground reinforcement construction [Performance certification method] DM method](https://image.www.ipros.com/public/product/image/321794/IPROS7365441545588568100.png?w=280&h=280)
![Ground reinforcement work [Performance certification method] Σ-i method](https://image.www.ipros.com/public/product/image/321794/IPROS17689074750660876182.png?w=280&h=280)
![Ground reinforcement construction [Performance certification method] RES-P method](https://image.www.ipros.com/public/product/image/321794/IPROS6263428337976322716.png?w=280&h=280)