3-Hinge Structure Arch Precast Method - Texpan
In addition to the beauty of the arch curve, the use of the tail arm method for the portal walls and wing walls also enhances the aesthetic appeal. 【Features】 ○ Designed with a three-hinge structure, allowing for a maximum member thickness of 40 cm. ○ Capable of erecting approximately 10 meters of arch members per day, which shortens the construction period. ○ The materials used are manufactured under strict quality control, ensuring safe use. ○ Immediately after the erection of the arch members, the interior side of the Texpan can be made available, minimizing traffic disruption. ○ The erection process is simple due to the repetition of the same work. *For more details, please contact us.
Inquire About This Product
basic information
For more details, please contact us.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 Bridges, etc.
Company information
Keikon Co., Ltd. is a comprehensive construction company engaged in the design, construction, manufacturing, and sales of concrete secondary products such as retaining walls, road products, and fire water tanks, as well as bridge and tunnel construction and slipform construction methods, boasting a top-class position in the industry as a manufacturer of concrete secondary products. In terms of the environment, we have established our own internal standards and label our products that are recognized for reducing environmental impact with the "Keko Mark." We will continue to focus on the development of related products more than ever before, aiming for "coexistence between people and nature."