BIM/CIM model creation service
We will support you by introducing 3D CAD compatible with BIM/CIM!

現場での作業を効率化する工期短縮に役立つ製品・技術をご紹介!
Date Published:
1~45 item / All 66 items
We will support you by introducing 3D CAD compatible with BIM/CIM!
Just this is enough, so please do something! We will respond to your request~ It's okay if it's just the time-consuming document scanning work~
Would you like to transform the site into one where 3D measurement and data processing tasks are more efficient than ever?
A construction method that involves cutting and repairing only the upper part of a damaged drainage ditch! It brings numerous benefits such as cost reduction, resource and energy conservation, and shortened construction periods!
80% reduction in concrete waste! We will proceed with repair work smoothly and quickly!
【※Looking for construction partners!】 The Neplus method is a technique that repairs only the upper part of damaged gutters! Cost reduction, resource and energy conservation, and shortened construction time!
Simple and speedy. A piping system that achieves outstanding labor savings.
Since it can be delivered using a dedicated cart, the packaging material is limited to minimal protection, and individual material arrangements are not necessary!
No torque management required! A torsion-type male thread anchor that enables reliable construction management.
A comprehensive comparison of recommended apps! A reference for enhancing the quality of on-site management by utilizing digital tools.
Up to 30 people for a monthly fee of 4,000 yen! Streamline management, administration, and on-site work in the construction industry. Reduce the burden of on-site management with paper and Excel. If you want to try it, start with "Sakumiru."
Thorough explanation of the key points for improving business efficiency! We will also introduce points to check before implementation.
It is possible to easily calculate construction quantities based on the data from "SS7"!
A new integrated structural calculation software 'Super Build/SS7 Premium' that realizes diversity in structural design.
"Super Build/SS7," a comprehensive structural calculation software that pursues labor-saving in structural design.
Towards public spaces where people and the environment are in harmony! Clean units can be provided individually as well.
Can be installed anywhere there is space indoors! A smoking room that does not require plumbing work.
Even if you throw away a lit cigarette, it effectively suppresses smoke! The structure makes it difficult for smoke to flow out of the ashtray box.
No loading work is required, allowing for efficient and speedy operations! Custom machinery focused on cable removal.
Prevention of tangled wires with a traverser. Hydraulic winch vehicle for power distribution construction that can be operated remotely. It is also used in renewable energy self-owned line construction.
"Patent Obtained" Enables Monitoring of Internal Conditions Without Entering the Manhole! ~Achieving Labor Reduction for Field Workers through DX~
【Heatwave Measures】One-time concrete curing work! Reduces color unevenness and cracking!
[Free Sample Available] A concrete placement aid that reduces moisture evaporation by up to 80%, allowing concrete to cure slowly without cracking even during summer placements.
It can be installed whether you remove the existing finishing material or not! Available for walls, floors, and ceilings!
Panels that demonstrate their strength in seismic resistance, insulation, and ease of construction! Achieving high precision finishes with simple installation.
Insulation + heat shielding + heat exhaust (ventilation) integrated roof panel that can be installed during the framing stage.
[Attention those troubled by transportation costs!] A pole that can be divided into two parts and can be transported manually. It can be delivered even to sites where a 4-ton truck cannot enter.
Over 50 years of experience and achievements! Utilizing our expertise in the manufacturing of lighting poles, we undertake the production of the structural components of multifunctional poles.
We carefully produce even requests for just one unit! We provide consistent support from material procurement to manufacturing and painting! We have extensive experience in producing poles for outdoor lighting, surveillance cameras, and speakers!
Shortening the construction period compared to conventional methods! Achieving seismic reinforcement while staying in place.
High durability, lightweight, simple, and easy to handle. This is a resin-based system formwork that "helps shorten construction periods"! <NETIS registration number: KT-230004-A>
You can easily implement cloud-based remote monitoring and email notifications for various sensors and measuring instruments from different manufacturers, such as flow meters!
Reduction of costs for measuring and managing parent piles and steel sheet piles of retaining walls using wireless inclinometers - Easy on-site DX (NETIS registered product)
Easily installable and usable even outside of LTE coverage! A temperature and humidity measurement system with a wide measurement range as its strength.
Can be directly painted on rusted surfaces, reducing the effort of rust removal. A water-based powerful rust converter evaluated for performance in a demonstration test by the Ministry of Land, Infrastructure, Transport and Tourism. Contributes to labor-saving in repairs.
Rust prevention for bridges! Just apply it to convert rust and reduce work burden.
For everyone involved in projects and tasks! Centralized management of income and assignment status. Visualizing income to eliminate unprofitable projects!
No initial investment required - immediately usable remote presence introduction model for local general contractors.
Real-time sharing of progress, safety, and quality: Case studies on streamlining management tasks.
Maximize profits through labor reduction and shortened construction periods.
This is a video digest comparing the work time and finish between the factory-applied D-board method using the highly processable non-combustible base material Dailight and the on-site application.
D-board method for fire-resistant decorative panels that are easy to process on-site using 3M TM Di-Noc TM film and D-Lite.
Preventive maintenance type: Crack suppression sheet with the highest tensile strength × nailed fixation (high workability)
A covering material stronger than blue sheets. A mat that hardens gradually with watering and is easy to install.
It hardens in just 3 hours, contributing to a shortened construction period. Installation, including top coating, can be completed in one day.
Stay Updated with Our Newsletter
The next update is,.