Capsule Ho-Paira Method
Acquisition of construction technology examination certification! Press-in construction of steel pipe sheet piles into hard ground with low noise and low vibration.
地盤の強化&安定性の向上に貢献する基礎工法・地盤改良工法を一挙公開!
掲載開始:
1~43 item / All 43 items
Acquisition of construction technology examination certification! Press-in construction of steel pipe sheet piles into hard ground with low noise and low vibration.
A system and construction that can be optimized according to site conditions using down-the-hole drilling!
Birth of a multi-driver compatible with hard rock formations! High-speed drilling with a hydraulic casing pipe drilling device!
It allows for accurate and easy measurement of the curvature of boreholes for anchor construction, ground improvement work, and investigation of buried pipes (water, communication, electricity, gas, etc.).
Based on the measured data, it is possible to understand the stratification, the consolidation conditions of soft ground, confirm the effects of ground improvement, and determine liquefaction!
It is a system that enables rapid and high-precision ground surveys in their original position!
Real-time measurement of the density of the flowing material in the pressure piping!
The maintenance and usability have greatly improved with the shifted dual tank! Reliable mixing is achieved with the separate gate baffle! Introducing the new vertical dual tank grout mixer!
Prevent mistakes in W/C (water-cement ratio) due to human error! Achieve labor-saving by mechanizing the hand-mixing of grout mortar. Free catalog available now.
Semi-automatic small plant for producing cement milk suitable for residential foundation improvement work.
Towards public spaces where people and the environment are in harmony! Clean units can be provided individually as well.
Even if you throw away a lit cigarette, it effectively suppresses smoke! The structure makes it difficult for smoke to flow out of the ashtray box.
Can be installed anywhere there is space indoors! A smoking room that does not require plumbing work.
Fluidize the excavated soil on-site and pump it. This allows for mass production of backfill materials and shortens the construction period.
Shortening the construction period compared to conventional methods! Achieving seismic reinforcement while staying in place.
Special screws for compression wings and mixing wings! The 'MLT method' for installing piles and steel sheet piles in hard ground is effective for "cobblestones and boulders," which are difficult to handle with conventional methods!
Automatic measurement of mountain retaining displacement using cloud technology achieved at low cost! (NETIS registered product)
Operates for about 1 year on battery; usable in underground, tunnels, and outside LTE coverage; measurement resolution is 0.001°.
Battery-operated inclinometer. Measurement range is up to 20 km, and measurement resolution is 0.001°.
Real-time confirmation of the invisible bucket tip.
Check the progress of the construction site in real-time from anywhere.
Utilizing space for site management improves the accuracy of surveying.
Available for managing concrete slab thickness! Can be measured and photographed by one person.
Simultaneously capture the operation of heavy machinery and its movements. Manage the technology and records of civil engineering and construction sites collectively through video.
The seismic retrofitting of the music hall ceiling can be done without the so-called "semi-structural" steel framework! An integrated ceiling using lightweight materials [grid-fixed ceiling].
The TEC method is the strongest ceiling substrate system that uses square pipes for the furring and braces, ensuring a horizontal allowable load capacity of 9000N.
Shorten construction time with factory-produced products! We create concrete slabs for parking lots and gardens.
Repairs can be made from the top edge with a height of 0.5m when replacing the guardrail of the existing retaining wall.
Enabling further shortening of construction periods and cost reduction! Introducing the steel sheet pile punching method.
Support for the installation and adjustment of tower foundation materials!
We offer three types of installation methods that can be selected according to the construction.
Easily visible to pedestrians and vehicles, increasing customer attraction! The construction period is short, and low-cost implementation is possible.
Here is a list of foundation work that can be proposed by Japan Temporary Works.
Consideration for the environment while improving workability! We can also accommodate shape requests.
Even if the land is flat, it doesn't mean the supporting layer is flat! Infer the geological composition and conduct accurate and economical ground investigations!
Easy installation for shortened construction time! Precast foundations that can be removed from the site in as little as 7 days.
Environmentally conscious foundation construction method
Introduction to construction methods that can dramatically shorten construction periods and improve safety.
Preventing water absorption to suppress efflorescence! Protecting homes from harsh natural environments and reducing maintenance.
Flexibly respond to various structures! We aim to improve the performance of the ground as a foundation for construction.
Gathering years of cultivated "pile" technology! Introduction of environmentally friendly foundation construction methods.
A large oil-free screw compressor that provides oil-free air with high efficiency, high quality, and low noise!
Stay Updated with Our Newsletter