iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35366items
    • Facilities
      Facilities
      55928items
    • Lighting and Interior
      Lighting and Interior
      17175items
    • Common materials
      Common materials
      36600items
    • Civil Engineering Materials
      Civil Engineering Materials
      9526items
    • Construction, work and methods
      Construction, work and methods
      27269items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29208items
    • IT/Software
      IT/Software
      32309items
    • others
      others
      76364items
    • Store and facility supplies
      Store and facility supplies
      4339items
    • Office and commercial supplies
      Office and commercial supplies
      11356items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      948items
    • Logistics Equipment
      Logistics Equipment
      6748items
    • Energy and Resources
      Energy and Resources
      11533items
  • Search for companies by industry

    • Information and Communications
      7210
    • others
      7011
    • Building materials, supplies and fixtures manufacturers
      6665
    • Service Industry
      4638
    • Trading company/Wholesale
      2998
    • Other construction industries
      2453
    • Electrical equipment construction business
      642
    • Interior Design
      526
    • Facility Design Office
      490
    • Construction Consultant
      464
    • Architectural design office
      361
    • retail
      345
    • Warehousing and transport related industries
      322
    • Electricity, Gas and Water Industry
      290
    • General contractors and subcontractors
      286
    • Interior construction business
      275
    • Medical and Welfare
      274
    • Educational and Research Institutions
      257
    • Building Management
      252
    • Renovation and home construction industry
      223
    • Water supply and drainage construction business
      202
    • Housing manufacturers and construction companies
      186
    • Transportation
      161
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      126
    • Structural Design Office
      66
    • Finance, securities and insurance
      36
    • Restaurants and accommodations
      30
    • self-employed
      29
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Other construction industries
  3. エルニード協会
  4. Product/Service List
Other construction industries
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

エルニード協会

addressKagawa/Takamatsu-shi/2485-21 Nishimachi, Wakayama
phone087-841-0161
  • Special site
  • Official site
last updated:Jun 18, 2025
エルニード協会logo
  • Contact this company

    Contact Us Online
  • Before making an inquiry

    Download PDF
  • Company information
  • Products/Services(56)
  • catalog(14)
  • news(0)

エルニード協会 List of Products and Services

  • category

1~45 item / All 45 items

Displayed results

Filter by category

Super Rappu El Nido Method Super Rappu El Nido Method
Ground improvement work Ground improvement work
Shallow and intermediate layer mixed treatment method Shallow and intermediate layer mixed treatment method
Slurry-type mechanical stirring block ground improvement method Slurry-type mechanical stirring block ground improvement method
Super Rappuru Basic Construction Method Super Rappuru Basic Construction Method
Koshinetsu Area (Elneed Koshinetsu Co., Ltd.) Koshinetsu Area (Elneed Koshinetsu Co., Ltd.)
Chubu Japan Area (Elneed Chubu Co., Ltd.) Chubu Japan Area (Elneed Chubu Co., Ltd.)
Kyushu Okinawa Area (Elneed Kyushu Co., Ltd.) Kyushu Okinawa Area (Elneed Kyushu Co., Ltd.)
Chugoku-Shikoku Area (Elneed Chugoku-Shikoku Co., Ltd.) Chugoku-Shikoku Area (Elneed Chugoku-Shikoku Co., Ltd.)
Tohoku Area (Elneed Tohoku Co., Ltd.) Tohoku Area (Elneed Tohoku Co., Ltd.)
Hokkaido, Kanto region, Kansai region area (Neo Need Co., Ltd.) Hokkaido, Kanto region, Kansai region area (Neo Need Co., Ltd.)
Super

Super Rappuru Basic Construction Method

The Super Rappu L Elniido method is a construction technique that uses stabilized soil created by mixing construction-generated soil with water and cement-based solidifying agents, and it is an improved version of the Rappu concrete method for construction foundations.

Ground improvement work in Aichi Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality earthworks with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation, setting up, and removing formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A must-see for structural design offices! Super Rappuru Elniido method.

【NETIS Registration】High-quality construction materials that consider the environment! Using attachments compatible with various soil types.

We would like to introduce the feature of the "Super Rappuru Erunido Method," which is characterized by the minimal amount of surplus soil generated on site. Since this method involves mixing site-generated soil with solidifying agents, it produces less residual soil compared to conventional methods, making disposal easier. Additionally, by excavating down to the supporting ground, visual confirmation and tactile inspection through the removal of the supporting ground are possible, allowing for direct assessment and increasing reliability. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality embankment ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Hyogo Prefecture! Super Rappu Elneed method.

[NETIS Registration] Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Elniido Method," which include a shortened construction period and high-quality improvement bodies. By using different buckets according to the soil type for mixing, it enables the creation of high-quality improved bodies and also improves efficiency. Additionally, the time from excavation to completion of the improvement is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. [Features] ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Minimal excess soil on site (amount of disposal soil) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rubble Concrete Super Rubble Elneed Method

[NETIS Registration] It is active in a wide range of applications as a fundamental construction method that responds to various situations!

We would like to introduce the feature of the "Super Rappuru Erunido Method," which makes it easy to confirm the supporting layer. By excavating down to the bearing ground, visual confirmation and tactile examination through the removal of the bearing ground can be performed, allowing for direct judgment and increasing reliability. Additionally, by using different devices according to the soil type, high-quality and uniform construction has become possible. 【Features】 ■ Excellent cost-effectiveness ■ Shortened construction period and high-quality fill ■ Minimal excess soil on site (amount of disposal soil) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Achieving low-cost construction! Rappuru concrete foundation ground improvement work.

[NETIS Registration] It is active in a wide range of applications as a fundamental construction method that responds to various situations!

We would like to introduce the feature of the "Super Rappuru Erunido Method," which makes it easy to confirm the supporting layer. By excavating down to the supporting ground, visual confirmation and tactile examination through the removal of the supporting ground are possible, allowing for direct judgment and increasing reliability. Additionally, by using different equipment according to the soil type, it has become possible to achieve high-quality and uniform construction. 【Features】 ■ Excellent cost-effectiveness ■ Shortened construction period and high-quality fill ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Achieving both a reduction in construction days and cost savings! Ground improvement work using the Rapple foundation method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality land development that considers the environment.

We would like to introduce the excellent economic efficiency of the "Super Lapple Elneed Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation at each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of the support layer ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Environmentally friendly super rubble elnid construction method using fluidized treatment soil.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality, environmentally friendly development bodies.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation, setting up, and removing formwork. The construction can be completed in a short time from excavation to site development for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (remaining disposal soil amount) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Rappu Elniido Method - Shortening Construction Period! Ground Improvement Work

[NETIS Registration] Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Erunido Method," which include shortened construction periods and high-quality embankments. By using different buckets according to soil types for mixing, it enables the creation of high-quality improved materials and also enhances efficiency. Additionally, the time from excavation to completion of embankment is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Minimal excess soil on site (remaining disposal soil volume) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Slurry-type mechanical stirring block ground improvement method - El Nido method

[NETIS Registration] Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Erunido Method," which include shortened construction periods and high-quality embankments. By using different buckets according to the soil type for mixing, it enables the creation of high-quality improved materials and also enhances efficiency. Additionally, the time from excavation to completion of the embankment is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Basic Construction Method: Super Lapel Elneed Method

High-quality construction materials that consider the environment! Using attachments compatible with various soil types.

We would like to introduce the feature of the "Super Rappuru Elniido Method," which is that it generates minimal excess soil on site. Since this method involves mixing site-generated soil with solidifying agents, it produces less residual soil compared to conventional methods, making disposal easier. Additionally, by excavating down to the supporting ground, visual confirmation and tactile inspection through the removal of the supporting ground are possible, allowing for direct judgment and thereby increasing reliability. [Features] ■ Excellent cost-effectiveness ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality embankment ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shallow and Intermediate Layer Mixed Treatment Method - Super Rappelle Erneed Method

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality land development with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality development body ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Ground Improvement Work Super Rappu Elniido Method

Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Elniido Method," which include shortened construction periods and high-quality embankments. By using different buckets according to soil type for mixing, it enables the creation of high-quality improved materials and also enhances efficiency. Additionally, the time from excavation to completion of the embankment is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Minimal excess soil on site (remaining disposal soil volume) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Super Wrap L Elneed Method

Foundation construction method using fluidized treatment soil! Joint research and development with the National Institute for Land and Infrastructure Management.

The "Super Rappuru Erunido Method" is a construction method that realizes "simplicity, clarity, and reliability." Considering soil quality, high quality, and uniformity, various buckets such as cut & mixing buckets, M mixing buckets, and skeleton mixing buckets are used appropriately during construction. Additionally, to achieve high quality, we thoroughly manage quality by addressing changes in soil quality during construction, changes in groundwater levels, and ensuring reliable confirmation of the supporting ground. 【Features】 ■ Minimal leftover soil ■ Easy confirmation of the supporting layer ■ Strength management can be performed as needed ■ Quick response to changes in natural soil moisture content ■ No compaction required ■ Increased adhesion prevents liquefaction *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

<Capable of responding swiftly to various sites> Super Rappuru Erunido Method

[NETIS Registration] Capable of responding to various situations and active in a wide range of applications! A technology that allows for direct confirmation of the quality of the fill material and the supporting ground.

We would like to introduce the "Super Lapple Elneed Method," which can respond swiftly to various job sites. This method allows for excavation and improvement even in ground containing cobbles and boulders, and it enables water volume adjustments according to site conditions in response to changes in soil moisture content and unexpected groundwater. By incorporating an adjusted moisture content into the mix design, the uniformity of the constructed body is enhanced. Please feel free to contact us when you need our services. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Shortened construction period and high-quality constructed body ■ Minimal excess soil on site *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Wakayama Prefecture! Super Rappu Elniido method.

[NETIS Registration] A construction technique has been established that is easy for anyone to understand and directly confirms the reliability of the constructed body!

The "Super Rappuru Basic Construction Method" uses stabilized soil created by mixing construction-generated soil with water and cement-based solidifying agents, and is an improved method of the Rappuru concrete construction method for building foundations. The design utilizes various design standards based on the Japan Architectural Institute's "Construction Structural Design Guidelines," and similarly to the design of Rappuru concrete, it examines the ground bearing capacity and settlement based on boring data, determining the strength of the fill and the mixing plan (estimation). Prior to construction, on-site soil is collected, and soil analysis and indoor mixing tests are conducted to determine the mixing quantities and the effective range of flow values. [Features] ■ Establishment of theoretical framework: Reliable ■ Development and improvement of equipment: Fast ■ Easy-to-understand construction techniques: Certain *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Mie Prefecture! Super Ruple Elneed method.

[NETIS Registration] Explanation of the process for basic patterns, when there is a collapse of the excavation hole, at the neighboring property boundary, and when the supporting layer becomes deeper than a certain depth.

On this page, we introduce the process of the Super Rappel Foundation Method (El Nido Method) through case studies. We explain the processes such as the start of excavation, excavation status, and completion of excavation in conjunction with images. We also include information on mixing conditions and core sampling. For more details, please check the related links. We encourage you to take a look. [Contents] ■ Basic Pattern ■ When Excavation Hole Collapses ■ When at Neighboring Property Boundary ■ When the Support Layer Becomes Deeper than a Certain Depth *For more information, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Rappuru Basic Construction Method (El Nido Method) Technical Documentation

[NETIS Registration] An explanation of design policies, the bearing capacity of the underlying ground, and load levels, extracted from design documents!

On this page, we have published excerpts of technical materials on the Super Rappuru Foundation Method (El Nido Method). We provide detailed explanations on topics such as "the bearing capacity and load degree of the underlying ground for embankment," "immediate settlement amount," and "the calculation formula for the design standard strength Fc of the embankment." For more details, please check the related links. We encourage you to take a look. [Contents] ■ Design Policy ■ Bearing Capacity and Load Degree of the Underlying Ground for Embankment ■ Confirm that the immediate settlement amount SE is less than the allowable total settlement amount Sa ■ Determine the design standard strength FC of the embankment *For more information, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Osaka Prefecture! Super Rappu Elniido method.

[NETIS Registration] An explanation of the design policy and the bearing capacity and load conditions of the underlying ground extracted from the design documents!

On this page, we have published excerpts of technical materials related to the Super Rappuru Foundation Method (El Nido Method). We provide detailed explanations on topics such as "Bearing capacity and load degree of the underlying ground for embankment," "Immediate settlement amount," and "Calculation formula for the design standard strength Fc of the embankment." For more details, please check the related links. We encourage you to take a look. 【Contents】 ■ Design Policy ■ Bearing capacity and load degree of the underlying ground for embankment ■ Confirm that the immediate settlement amount SE is smaller than the allowable total settlement amount Sa ■ Determine the design standard strength FC of the embankment *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Ishikawa Prefecture! Super Rappu El Nido method

[NETIS Registration] An explanation of the design policy and the bearing capacity and load level of the subgrade from the extracted design materials!

On this page, we have published excerpts of technical materials on the Super Rappuru Foundation Method (El Nido Method). We provide detailed explanations on topics such as "the bearing capacity and load degree of the underlying ground for embankment," "immediate settlement amount," and "the calculation formula for the design standard strength Fc of the embankment." For more details, please check the related links. We encourage you to take a look. [Contents] ■ Design Policy ■ Bearing Capacity and Load Degree of the Underlying Ground for Embankment ■ Confirm that the immediate settlement amount SE is less than the allowable total settlement amount Sa ■ Determine the design standard strength FC of the embankment *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Nara Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality, environmentally friendly development bodies.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation, as well as the setting up and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Shiga Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality earthworks with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Lapple Erneed Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mixing plans, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparations ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in the Kansai region! Super Rappu Elniido method.

[NETIS Registration] Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Erunido Method," which include a shortened construction period and high-quality embankments. By using different buckets according to the soil type for mixing, it enables the creation of high-quality improved soil and also improves efficiency. Additionally, the time from excavation to completion of the embankment is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of the support layer ■ Minimal excess soil on site (amount of disposal soil) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Nagano Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality earthworks with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation, as well as the setting up and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix design, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kyoto Prefecture! Super Rappu Elniido method.

[NETIS Registration] An explanation of the design policy, the bearing capacity of the subgrade, and load intensity, extracted from the design documents!

On this page, we have published excerpts of technical materials regarding the Super Rappuru foundation method (El Nido method). We provide detailed explanations on topics such as "the bearing capacity and load degree of the underlying ground," "immediate settlement amount," and "the calculation formula for the design standard strength Fc of the embankment." For more details, please check the related links. We encourage you to take a look. [Contents] ■ Design policy ■ Bearing capacity and load degree of the underlying ground ■ Confirm that the immediate settlement amount SE is less than the allowable total settlement amount Sa ■ Determine the design standard strength FC of the embankment *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Toyama Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality landforms with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Gifu Prefecture! Super Rappu Elniido method.

[NETIS Registration] Explanation of the process in the case of basic patterns, excavation hole collapse, boundary line with neighboring land, and when the support layer becomes deeper than a certain level.

On this page, we introduce the case-by-case processes of the Super Rappuru Basic Construction Method (El Nido Method). We explain the processes such as the start of excavation, excavation status, and completion of excavation in conjunction with images. We also include information on the mixing situation and core sampling. For more details, please check the related links. We encourage you to take a look. [Contents] ■ Basic Pattern ■ When Excavation Hole Collapses ■ When at the Property Boundary ■ When the Support Layer Becomes Deeper Than Certain Depth *For more information, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Fukui Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality, environmentally friendly land development.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in the Tokai region! Super Rappu Elniido method.

[NETIS Registration] Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Elniido Method," which include shortened construction periods and high-quality embankments. By using different buckets according to soil types for mixing, it enables the creation of high-quality improved soil and also enhances efficiency. Additionally, the time from excavation to completion of embankment is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. 【Features】 ■ Excellent cost-effectiveness ■ Easy verification of support layers ■ Minimal excess soil on site (amount of disposal soil) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Rappu El Nido Method

Over 3,000 construction achievements nationwide! Ground improvement that realizes shortened construction periods and cost reduction.

We would like to introduce the excellent economic efficiency of the "Super Lapple Elneed Method." Since it is constructed through direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. The construction can be completed in a short time from excavation to site development for each location, achieving cost reduction. By conducting preliminary test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Hokkaido! Super Rappu Elneed method.

[NETIS Registration] Achieving shortened construction periods and low costs! Super Lapel Elneed method capable of handling groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation, as well as the setting up and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparations ■ Minimal excess soil on site (disposal soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kanagawa Prefecture! Super Rappu El Nido method.

[NETIS Registration] Achieving shortened construction periods and reduced costs! Super Lapel Elneed method capable of handling groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. It allows for quick completion from excavation to site development at each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Saitama Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving shortened construction periods and reduced costs! Super Lapel Elneed method that can also accommodate groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido construction method." Since it is constructed using direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. It allows for quick completion from excavation to site preparation at each location. Through numerous test constructions in various ground conditions, we have established know-how in test systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Chiba Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving shortened construction periods and reduced costs! Super Lapel Elneed method capable of handling groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed by direct excavation, it reduces the processes of over-excavation, setting up, and removing formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix design, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Tokyo! Super Rappu Elniido method.

[NETIS Registration] Achieving shortened construction periods and reduced costs! Super Lapel Elneed method capable of handling groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in the Kanto region! Super Rappu Elniido method.

[NETIS Registration] Achieving shorter construction periods and lower costs! Super Lapel Elneed method that can also accommodate groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation, setting up, and removing formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Yamaguchi Prefecture! Super Rappu El Nido method.

[NETIS Registration] Achieving shortened construction periods and low costs! Capable of handling groundwater and soft ground!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation, as well as the setting up and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix design, construction management, and the development of mixing buckets, enabling us to create high-quality site development with minimal variation in strength. 【Features】 ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality site development ■ Minimal surplus soil (disposal leftover amount) on site ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Fukuoka Prefecture! Super Rappu Elniido method.

【NETIS Registration】 Capable of addressing problematic ground issues such as "cost reduction," "shortened construction period," "groundwater emergence," and "soft ground"!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparation with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Saga Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieving shortened construction periods and low costs! Utilizing the advantages of construction methods to create high-quality development bodies with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Construction Method." Since it is constructed through direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Nagasaki Prefecture! Super Rappu Elniido method.

[NETIS Registration] Nagasaki Prefecture, which is compatible with the construction method! Achieving shortened construction periods and low costs! The Super Rappu El Nido method, which is expected to have particular advantages in remote islands.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Through trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality embankments with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality embankments ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Oita Prefecture! Super Rappu Elneed method.

[NETIS Registration] Capable of handling groundwater, weak ground, and large boulders where piles cannot be installed! The Super Rappu Elneed method achieves shortened construction periods and cost reductions.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each site. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (disposal residual soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kumamoto Prefecture! Super RAPL El Nido method.

[NETIS Registration] Capable of addressing "groundwater" and "soft ground"! A super wrap-around needle method that achieves "shortened construction periods" and "cost reduction."

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in test systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (disposal soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Miyazaki Prefecture! Super RAPL Elneed method.

[NETIS Registration] Capable of addressing "groundwater" and "soft ground"! The Super Lapel Elneed Method achieves "shortened construction periods" and "cost reduction."

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kagoshima Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieve "shortened construction periods" and "cost reduction" for problematic ground such as "groundwater" and "soft ground"!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparation with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal surplus soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Okinawa Prefecture! Super Ruple El Nido method.

[NETIS Registration] Super Rappu El Nido method, which is expected to have significant cost advantages, especially in remote islands such as Okinawa, Ishigaki Island, and Miyako Island!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions on various ground types, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality site preparation with minimal variation in strength. [Features] - Easy confirmation of the support layer - Shortened construction period and high-quality site preparation - Minimal excess soil on site (amount of disposal soil) - Capable of appropriately responding to the unique ground conditions of Okinawa - Can handle sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in the Kyushu and Okinawa regions! Super Ruple El Nido method.

[NETIS Registration] Achieving low cost and shortened construction period! Utilizing the advantages of the construction method to create high-quality development bodies with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappu Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each location. Through numerous test constructions in various ground conditions, we have established know-how in test systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (disposal residual soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 1 Next
  • イプロスがリアル展示会を主催します! AI/DX 営業・マーケティング展 出展社募集中 リード数・商談数が止まらない!新しいリアル展示会を提供 会期 2026年3月24日(火)~25日(水) 会場 東京ビッグサイト東4ホール 出展概要資料を進呈!
    • Contact this company

      Contact Us Online
    • Before making an inquiry

      Download PDF

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.