Over 3,000 construction achievements nationwide! Ground improvement that realizes shortened construction periods and cost reduction.
We would like to introduce the excellent economic efficiency of the "Super Lapple Elneed Method." Since it is constructed through direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. The construction can be completed in a short time from excavation to site development for each location, achieving cost reduction. By conducting preliminary test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
Related Videos
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
The Elneed Association handles the "Super Rappuru Basic Construction Method (Elneed Method)." This method uses stabilized soil created by mixing construction-generated soil with water and cement-based solidifying agents, and it is an improved version of the Rappuru concrete method for construction foundations. Our member companies are located from Tohoku to Kyushu, allowing us to respond to requests from all over the country. Please feel free to contact us when you need our services.