iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35498items
    • Facilities
      Facilities
      55990items
    • Lighting and Interior
      Lighting and Interior
      17329items
    • Common materials
      Common materials
      36691items
    • Civil Engineering Materials
      Civil Engineering Materials
      9528items
    • Construction, work and methods
      Construction, work and methods
      27315items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29373items
    • IT/Software
      IT/Software
      33537items
    • others
      others
      76669items
    • Store and facility supplies
      Store and facility supplies
      4379items
    • Office and commercial supplies
      Office and commercial supplies
      11487items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      972items
    • Logistics Equipment
      Logistics Equipment
      6772items
    • Energy and Resources
      Energy and Resources
      11685items
  • Search for companies by industry

    • Information and Communications
      7218
    • others
      7027
    • Building materials, supplies and fixtures manufacturers
      6649
    • Service Industry
      4655
    • Trading company/Wholesale
      3002
    • Other construction industries
      2448
    • Electrical equipment construction business
      642
    • Interior Design
      526
    • Facility Design Office
      489
    • Construction Consultant
      465
    • Architectural design office
      360
    • retail
      344
    • Warehousing and transport related industries
      321
    • Electricity, Gas and Water Industry
      289
    • General contractors and subcontractors
      283
    • Interior construction business
      278
    • Medical and Welfare
      274
    • Educational and Research Institutions
      258
    • Building Management
      253
    • Renovation and home construction industry
      222
    • Water supply and drainage construction business
      201
    • Housing manufacturers and construction companies
      186
    • Transportation
      160
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      126
    • Structural Design Office
      66
    • Finance, securities and insurance
      38
    • Restaurants and accommodations
      30
    • self-employed
      30
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      7
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Other construction industries
  3. エルニード協会
  4. Product/Service List
Other construction industries
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

エルニード協会

addressKagawa/Takamatsu-shi/2485-21 Nishimachi, Wakayama
phone087-841-0161
  • Special site
  • Official site
last updated:Jun 18, 2025
エルニード協会logo
  • Contact this company

    Contact Us Online
  • Before making an inquiry

    Download PDF
  • Company information
  • Products/Services(59)
  • catalog(14)
  • news(0)

エルニード協会 List of Products and Services

  • category

46~53 item / All 53 items

Displayed results

Filter by category

Super Rappu El Nido Method Super Rappu El Nido Method
Ground improvement work Ground improvement work
Shallow and intermediate layer mixed treatment method Shallow and intermediate layer mixed treatment method
Slurry-type mechanical stirring block ground improvement method Slurry-type mechanical stirring block ground improvement method
Super Rappuru Basic Construction Method Super Rappuru Basic Construction Method
Koshinetsu Area (Elneed Koshinetsu Co., Ltd.) Koshinetsu Area (Elneed Koshinetsu Co., Ltd.)
Chubu Japan Area (Elneed Chubu Co., Ltd.) Chubu Japan Area (Elneed Chubu Co., Ltd.)
Kyushu Okinawa Area (Elneed Kyushu Co., Ltd.) Kyushu Okinawa Area (Elneed Kyushu Co., Ltd.)
Chugoku-Shikoku Area (Elneed Chugoku-Shikoku Co., Ltd.) Chugoku-Shikoku Area (Elneed Chugoku-Shikoku Co., Ltd.)
Tohoku Area (Elneed Tohoku Co., Ltd.) Tohoku Area (Elneed Tohoku Co., Ltd.)
Hokkaido, Kanto region, Kansai region area (Neo Need Co., Ltd.) Hokkaido, Kanto region, Kansai region area (Neo Need Co., Ltd.)
Super

Super Rappu El Nido Method

This construction method uses stabilized soil created by mixing construction excavated soil with water and cement-based solidifying agents, and it is an improved version of the rubble concrete method for building foundations.

Ground improvement work in Kumamoto Prefecture! Super RAPL El Nido method.

[NETIS Registration] Capable of addressing "groundwater" and "soft ground"! A super wrap-around needle method that achieves "shortened construction periods" and "cost reduction."

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in test systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (disposal soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Miyazaki Prefecture! Super RAPL Elneed method.

[NETIS Registration] Capable of addressing "groundwater" and "soft ground"! The Super Lapel Elneed Method achieves "shortened construction periods" and "cost reduction."

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kagoshima Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieve "shortened construction periods" and "cost reduction" for problematic ground such as "groundwater" and "soft ground"!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparation with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal surplus soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Okinawa Prefecture! Super Ruple El Nido method.

[NETIS Registration] Super Rappu El Nido method, which is expected to have significant cost advantages, especially in remote islands such as Okinawa, Ishigaki Island, and Miyako Island!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions on various ground types, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality site preparation with minimal variation in strength. [Features] - Easy confirmation of the support layer - Shortened construction period and high-quality site preparation - Minimal excess soil on site (amount of disposal soil) - Capable of appropriately responding to the unique ground conditions of Okinawa - Can handle sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in the Kyushu and Okinawa regions! Super Ruple El Nido method.

[NETIS Registration] Achieving low cost and shortened construction period! Utilizing the advantages of the construction method to create high-quality development bodies with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappu Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each location. Through numerous test constructions in various ground conditions, we have established know-how in test systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (disposal residual soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Column] Solving transportation challenges for heavy machinery and materials to enable construction in remote islands and mountainous areas.

Solving transportation challenges for heavy machinery and materials to enable construction in remote islands and mountainous areas.

Ground improvement work in remote islands and mountainous areas. The biggest factor driving up costs is "transportation costs for equipment and materials." Our Elneed method (Super Laple method) solves this issue, which can sometimes amount to tens of millions of yen. The key is "overwhelmingly low equipment requirements." Since no special machinery or large-scale equipment is needed, transportation costs are dramatically reduced, making it possible to carry out projects that were previously abandoned due to unsuitable conditions. ⬛︎ Why is it "possible to construct anywhere"? 1. Only "backhoe" is needed. We do not use specialized heavy machinery like ground improvement dedicated machines. As long as a backhoe, which can be arranged anywhere, is available, construction can proceed. 2. Materials can be transported as "powder." Since we do not use ready-mixed concrete, there are no time constraints like the 90-minute rule to maintain quality. Cement-based materials can be transported in powder form and simply mixed with water on-site. This poses no problem even in remote islands or mountainous areas without ready-mix concrete plants. Thanks to this simplicity, we have successfully completed projects in more than three remote islands without regular shipping routes. Compared to other methods, we significantly reduce transportation costs and effort, contributing to the realization of projects.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Column] Visible Support Layers! What Excavation Methods Enhance Ground Reliability?

Visible support layers! What excavation methods enhance the reliability of the ground?

I am anxious about whether we are truly reaching the "support layer" that serves as the foundation of the building. In other methods, the conditions underground can only be estimated from machine readings, making it difficult to determine their accuracy. The Super Rappu Elneed method allows us to "directly see and touch" the most important part of ground improvement. ⬛︎ The challenge of "invisibility" faced by other methods While other methods use specialized large machines to dig underground, the Super Rappu Elneed method employs the most common equipment on site, the "backhoe." Instead of estimating "numbers" like torque values or ammeter readings, we verify with the technician's "eyes." This simple and direct approach creates an overwhelming "certainty" that other methods lack. ⬛︎ "Visible reassurance" achieves optimization of quality and cost The advantage of being able to "visualize" the support layer goes beyond mere peace of mind. - Proof of overwhelming quality - Cost optimization - Prevention of troubles before they occur Because the work underground is invisible, we ensure reliable construction.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Column] Comparison of Other Construction Methods and Processes / The Reason for the Significantly Faster Construction Time

Comparison of construction methods and processes / The reason why the construction time is overwhelmingly fast.

Can we achieve an overwhelming reduction in construction time? ⬛︎Explanation 1: No "slurry production" (compared to cement milk/pile improvement) In the cement milk method and pile improvement, the process begins with "slurry production," where cement and water are mixed at a batch plant. In fact, this preparation alone takes about 90 minutes for a site using 30 tons of cement. The Super Rappu Elneed method eliminates this entire preparation process. Since the solidifying agent is directly inserted in its package, there is no need for a plant or slurry production. The insertion work that took 90 minutes is completed in just 5 minutes. ⬛︎Explanation 2: No "formwork assembly and dismantling" (compared to the Rappu method) In the Rappu method, after "excavation," "formwork assembly" is performed, and after the concrete hardens, "formwork dismantling" occurs. These tasks require specialized craftsmen and are time-consuming processes. The Super Rappu Elneed method utilizes the sides of the excavation hole as a substitute for formwork (earthen formwork), eliminating the entire series of tasks related to "formwork." This allows for reductions in work time, labor costs, and material costs.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 12 Next
  • 自社にあったITツール・システムがあっという間に見つかった! 完全無料 最短1日 IT製品選定支援サービス
  • 共感を生むカラープランニングへ ロジカルにご提案いたします プロが導くカラー戦略
    • Contact this company

      Contact Us Online
    • Before making an inquiry

      Download PDF

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.