iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35431items
    • Facilities
      Facilities
      55925items
    • Lighting and Interior
      Lighting and Interior
      17177items
    • Common materials
      Common materials
      36599items
    • Civil Engineering Materials
      Civil Engineering Materials
      9520items
    • Construction, work and methods
      Construction, work and methods
      27262items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29207items
    • IT/Software
      IT/Software
      32217items
    • others
      others
      76382items
    • Store and facility supplies
      Store and facility supplies
      4334items
    • Office and commercial supplies
      Office and commercial supplies
      11356items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      949items
    • Logistics Equipment
      Logistics Equipment
      6747items
    • Energy and Resources
      Energy and Resources
      11524items
  • Search for companies by industry

    • Information and Communications
      7209
    • others
      7010
    • Building materials, supplies and fixtures manufacturers
      6670
    • Service Industry
      4635
    • Trading company/Wholesale
      2997
    • Other construction industries
      2453
    • Electrical equipment construction business
      641
    • Interior Design
      526
    • Facility Design Office
      490
    • Construction Consultant
      464
    • Architectural design office
      361
    • retail
      345
    • Warehousing and transport related industries
      322
    • Electricity, Gas and Water Industry
      290
    • General contractors and subcontractors
      286
    • Interior construction business
      275
    • Medical and Welfare
      274
    • Educational and Research Institutions
      257
    • Building Management
      252
    • Renovation and home construction industry
      224
    • Water supply and drainage construction business
      202
    • Housing manufacturers and construction companies
      186
    • Transportation
      161
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      125
    • Structural Design Office
      66
    • Finance, securities and insurance
      36
    • Restaurants and accommodations
      30
    • self-employed
      29
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Construction Consultant
  3. アザイ技術コンサルタント
  4. Product/Service List
Construction Consultant
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

アザイ技術コンサルタント

addressOsaka/Sakai-shi Naka-ku/343-29 Shin'ei Higashimachi
phone072-370-5290
  • Special site
  • Official site
last updated:Dec 05, 2022
アザイ技術コンサルタントlogo
  • Contact this company

    Contact Us Online
  • Company information
  • Products/Services(7)
  • catalog(4)
  • news(1)

アザイ技術コンサルタント List of Products and Services

  • category

1~7 item / All 7 items

Displayed results

Filter by category

Temporary deadline waterproof sheet method Temporary deadline waterproof sheet method
Modular portable barge Modular portable barge
Surveying and Measurement Business Surveying and Measurement Business
class="retina-image"

How to choose a liner plate construction method? *Reference materials for method comparison are currently being provided.

Introducing methods suitable for repairing upstream bridges where large heavy machinery access is difficult, including ways to reuse liner plates! What construction methods are suitable for shortening construction time and reducing labor?

This document explains the construction method using retaining materials widely known as the liner plate method. Various methods are considered mainly for bridge pier repairs, and it is widely examined as a suitable foundation and retaining method in areas such as upstream rivers where heavy machinery cannot access. [Document Introduction *Excerpt] ■ Methods suitable for the removal of accumulated sediment around bridge piers ■ Methods that have achieved the reuse of liner plates ■ Comparison materials for various liner plate methods *Overview, features, water-stopping methods, advantages, disadvantages, etc. are introduced. Our company handles methods suitable for temporary closures (using liner plates) for bridge piers, sluices, etc. *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

No need for a water-stopping packing! The 'Temporary Closure Waterproof Sheet Method' allows for water stopping with a waterproof sheet.

Developed for the reuse of liner plates! The sheets use YKK waterproof zippers! It is a construction method that reduces costs, minimizes labor, and considers the environment!

We offer three optimal construction methods for temporary closures (using liner plates) for bridge piers, sluice gates, and more. 【Temporary Closure Waterproof Sheet Method】 In existing methods, liner plates are discarded after one use, but we developed this method to allow for reuse based on requests from clients. "Waterproof sheet + Floating platform" 【Temporary Closure FPS Method】 In existing methods (using water-stopping packing), if the shape of bridge piers and the closure frame become large, assembly work on bracket-type scaffolding may not be feasible. We developed this method to accommodate all conditions by using lightweight floating barges. "Water-stopping packing + Floating platform" 【Pump Dredging Method (Obstacle Avoidance Type)】 By installing a long nozzle at the bottom of the dredging frame, which houses underwater sand pumps, air pumps, and high-pressure pumps, we made it possible to dredge only sediment from sediment layers mixed with obstacles such as driftwood and boulders. *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Cost reduction and environmental consideration with the "Temporary Closure Waterproof Sheet Method"

This is a construction method suitable for temporary closures associated with the reinforcement of movable weirs that can adjust water levels and flow rates!

Our company offers a temporary closure method using a "floating platform/waterproof sheet with waterproof fasteners." The "floating platform" is designed with a sliding function to allow the installation of a platform necessary for assembly work around bridge piers in minimal space. Additionally, by adopting a waterproof sheet, we have eliminated the need for water-stopping packing that was previously used during the assembly of temporary closure materials, enabling water-stopping through the waterproof sheet. 【Features】 ■ No welding or other fixation is required when attaching the temporary closure frame to the door body. ■ The load acting on the door body can be minimized. ■ The edges of the waterproof sheet are installed outside the temporary closure frame. ■ The waterproof sheet and temporary closure frame are independent, ensuring that any movement of the temporary closure frame does not affect water-stopping performance. *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Comparison with General Construction Methods: "Temporary Closure FPS Method"

The temporary waterproof sheet method is characterized by its ability to significantly reduce underwater construction by divers. We will cooperate in the design!

The temporary deadline FPS method has many advantages compared to conventional methods, including construction costs and timelines. Lifting fixtures and floating work platforms are installed, and the liner plates are assembled in the air before being lowered and installed underwater. 【Advantages】 ■ Manual construction is possible ■ Large-scale temporary structures are not required ■ Simple construction and processes, etc. 【Evaluation】 ■ Improved safety due to reduced underwater construction ■ Cost reduction For more details, please download the materials or contact us directly.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Patent Construction Method] "Temporary Closure FPS Method" to reduce underwater construction by divers.

The patented method, the temporary closure FPS method, is a construction technique that minimizes underwater work performed by divers.

The temporary deadline FPS method is a construction technique that minimizes underwater work performed by divers. It involves installing lifting fixtures and a floating work platform, assembling liner plates above water, and then lowering and installing them underwater. 【Features】 ■ Minimizes underwater construction. ■ Manual construction is possible. ■ Large-scale temporary structures are not required. ■ Construction and processes are reliable. For more details, please download the materials or contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Excavation Method for Deposited Soil Suitable for the Removal of Accumulated Soil Around Bridge Piers

The patented excavation method for accumulated soil and sand is suitable for removing the accumulated soil and sand around bridge piers.

The sediment excavation method is suitable for the removal of accumulated sediment around bridge piers. 【Features】 ■ Can be implemented in confined spaces with a headroom restriction of 2.0m. ■ Capable of suctioning mud, sand, gravel, and cobblestones. (Grain size up to 15mm, transport distance of approximately 200m possible) ■ Structure designed to avoid obstacles such as driftwood and boulders. ■ Minimizes turbid water as much as possible. ■ Easy management of excavation depth. ■ Size of the dredging equipment can be adjusted according to site conditions. For more details, please download the materials or contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Modular Portable Platform "SD (Super Deck)"

No special precautions are needed for loading materials! We offer a lineup of "Standard Type (SD-N)" and "Slim Type (SD-H)."

The "SD (Super Deck)" is a modular floating platform that can be transported by land and is widely used for construction and survey work in enclosed water areas such as dams, rivers, lakes, and marshes. It can be transported on a low-floor truck with a capacity of 15 tons, allowing for the loading of 4 units (SD-N) or 6 units (SD-H). (When loading 4 units, the vehicle height will be 4.0m, so prior confirmation of the passage route is required.) Additionally, the connection of the floats is integrated using a wedge lock system. It has sufficient strength to accommodate cranes, pile drivers, and backhoes. (The joints can be easily made from the deck while floating on the water.) 【Features】 ■ The connection of the floats is integrated using a wedge lock system. ■ It has sufficient strength to accommodate cranes, pile drivers, and backhoes. ■ The deck is flat after assembly, with a gap of 40mm at the connection points. ■ No special protection is required for loading materials. *For more details, please refer to the PDF document or feel free to contact us.

  • Work boats, research vessels, underwater work machines

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 1 Next
  • イプロスがリアル展示会を主催します! AI/DX 営業・マーケティング展 出展社募集中 リード数・商談数が止まらない!新しいリアル展示会を提供 会期 2026年3月24日(火)~25日(水) 会場 東京ビッグサイト東4ホール 出展概要資料を進呈!
    • Contact this company

      Contact Us Online

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.