[Patent Construction Method] "Temporary Closure FPS Method" to reduce underwater construction by divers.
The patented method, the temporary closure FPS method, is a construction technique that minimizes underwater work performed by divers.
The temporary deadline FPS method is a construction technique that minimizes underwater work performed by divers. It involves installing lifting fixtures and a floating work platform, assembling liner plates above water, and then lowering and installing them underwater. 【Features】 ■ Minimizes underwater construction. ■ Manual construction is possible. ■ Large-scale temporary structures are not required. ■ Construction and processes are reliable. For more details, please download the materials or contact us.
Inquire About This Product
basic information
For more details, please download the materials or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the materials or contact us.
catalog(1)
Download All CatalogsCompany information
Our company is engaged in construction consulting and general civil engineering. We handle temporary cutoff waterproof sheet methods, temporary cutoff FPS methods, special excavation pump dredging methods, and underwater surveys and measurements. Please feel free to contact us if you have any inquiries.