iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35537items
    • Facilities
      Facilities
      56659items
    • Lighting and Interior
      Lighting and Interior
      17273items
    • Common materials
      Common materials
      37011items
    • Civil Engineering Materials
      Civil Engineering Materials
      9533items
    • Construction, work and methods
      Construction, work and methods
      27653items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      30352items
    • IT/Software
      IT/Software
      31845items
    • others
      others
      84511items
    • Store and facility supplies
      Store and facility supplies
      4358items
    • Office and commercial supplies
      Office and commercial supplies
      11463items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      952items
    • Logistics Equipment
      Logistics Equipment
      7378items
    • Energy and Resources
      Energy and Resources
      11606items
  • Search for companies by industry

    • Information and Communications
      7198
    • others
      6980
    • Building materials, supplies and fixtures manufacturers
      6683
    • Service Industry
      4607
    • Trading company/Wholesale
      2996
    • Other construction industries
      2455
    • Electrical equipment construction business
      642
    • Interior Design
      528
    • Facility Design Office
      492
    • Construction Consultant
      464
    • Architectural design office
      361
    • retail
      345
    • Warehousing and transport related industries
      321
    • Electricity, Gas and Water Industry
      290
    • General contractors and subcontractors
      288
    • Interior construction business
      274
    • Medical and Welfare
      272
    • Educational and Research Institutions
      258
    • Building Management
      253
    • Renovation and home construction industry
      224
    • Water supply and drainage construction business
      204
    • Housing manufacturers and construction companies
      187
    • Transportation
      160
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      124
    • Structural Design Office
      66
    • Finance, securities and insurance
      35
    • Restaurants and accommodations
      29
    • self-employed
      29
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. General contractors and subcontractors
  3. 名西建材
  4. Product/Service List
General contractors and subcontractors
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

名西建材

EstablishmentDecember 1, 1988
capital1000Ten thousand
number of employees19
addressAichi/Nakamura-ku, Nagoya-shi/8-206 Usen Town
phone052-414-4155
  • Official site
last updated:Feb 12, 2021
名西建材logo
  • Contact this company

    Contact Us Online
  • Company information
  • Products/Services(17)
  • catalog(8)
  • news(0)

名西建材 List of Products and Services

  • category

1~17 item / All 17 items

Displayed results

class="retina-image"

[Construction Example] Mountain Retention Work Sloped Beam

Introducing construction examples of "diagonal beams" arranged diagonally within a vertical plane!

A "bracing beam" is a structural member that is arranged diagonally within a vertical plane. It takes reaction forces from the support piles and the framework, and supports the retaining wall through the diagonally placed bracing beam. *For more details, please refer to the related link page or feel free to contact us.*

  • Earth retaining wall/foundation reinforcement
  • Earth retaining support

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Ancillary Work Percussion

For excavating unstable sand layers and gravel layers! It demonstrates its power in places where wall construction has been difficult until now.

"Percussion" is a construction method that involves suspending a heavy drilling bit (one bit) from the end of a wire rope and moving the rope up and down to break through geological layers while drilling. It demonstrates its effectiveness in ground conditions that contain many boulders and cobbles, in harsh environments such as rivers, and in narrow spaces where wall construction has previously been difficult. It is suitable for drilling relatively soft geological layers. [Features] - Demonstrates effectiveness in places where wall construction has previously been difficult - Suitable for drilling relatively soft geological layers - Excels in drilling unstable sand layers and boulder layers that are challenging for other methods *For more details, please refer to the related link page or feel free to contact us.

  • Ground improvement
  • Ground foundation construction method
  • Drilling Machine

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Case: Injection Work

Injecting a solidifying agent into the voids of sandy soil! Introducing a method to improve the stability of the ground.

"Injection grouting" is a method of improving sandy soil by injecting a solidifying agent (chemical solution) into the voids of the soil to stabilize it. First, a survey is conducted to check for any obstacles, and the construction site is marked. A boring machine is set up, and while supplying drilling fluid (Chemical A and B), the drilling rod is used to inject the solution under pressure, drilling to the specified depth. In the first stage, a fast-setting type of chemical is used to fill large voids in loose sand layers and cohesive soil sections, preventing the injected material from diffusing or leaking from the injection site. In the second stage, a medium-setting to slow-setting type of chemical is used to permeate and inject into the smaller voids of sandy soil that contains a significant amount of medium to well-compacted sand layers and cohesive soil, achieving a solid consolidation of the ground. Once the specified injection amount for one stage is reached, the process moves to the next stage, and after all stages are completed, the chemical solution is replaced with water to fill the injection holes while withdrawing the rod. *For more details, please refer to the related link page or feel free to contact us.*

  • Ground improvement
  • Ground foundation construction method
  • Medicines

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Auxiliary Work Deep Well

Install deep wells inside and outside the excavation! A method to pump out groundwater flowing into the well.

The "Deep Well Method" involves installing a deep well inside and outside the excavation trench and using a pump to drain the groundwater that flows into the well. After drilling the ground with excavation machinery, a well casing (screen) is installed, and a submersible pump is inserted into the casing to draw up groundwater. There are several methods for drilling, which are selected based on the depth of the well, the hardness or softness of the ground, and the diameter of the well. 【Features】 ■ Install deep wells inside and outside the excavation trench and pump out the groundwater flowing into the well. ■ After drilling the ground with excavation machinery, install the well casing and insert a submersible pump to draw up groundwater. ■ The drilling method is selected based on the depth of the well, the hardness or softness of the ground, and the diameter of the well. *For more details, please refer to the related link page or feel free to contact us.

  • Drainage and water removal
  • Pipeline Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Case】Accessory Work Well Point

A method used when it is expected that drainage by well pumps alone will be difficult!

The "Well Point Method" involves attaching well points to the ends of pipes, injecting jet water, and driving numerous pipes into the ground around the excavation site. This method uses vacuum power to draw groundwater from the installed pipes, thereby lowering the groundwater level. It is a type of well method used when it is anticipated that drainage by well pumps alone will be difficult. It is widely used for underground pipe installation work, septic tank burial work, ground liquefaction countermeasures, and improvement methods for weak ground. This is a ground improvement work used when conducting excavation work in areas with spring water. 【Features】 - Used when it is anticipated that drainage by well pumps alone will be difficult. - Widely used as an improvement method for underground pipe installation work and septic tank burial work. - Used when conducting excavation work in areas with spring water. *For more details, please refer to the related link page or feel free to contact us.

  • Ground improvement
  • Drainage and water removal
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Retaining Wall Construction Temporary Platform

Distribute the load of heavy machinery using a placement platform and opening cover to reduce the impact on the structure!

The "placement platform" is installed to secure the flow within the site and the working space for heavy machinery. Many of these platforms are intended for the installation of heavy machinery on structures, dispersing the load of the machinery through the placement platform and opening covers to reduce the impact on the structure. They are also referred to as "access platforms" or "protection platforms." 【Features】 ■ Installed to secure the flow within the site and the working space for heavy machinery ■ Disperses the load of heavy machinery through the placement platform and opening covers to reduce the impact on the structure *For more details, please refer to the related link page or feel free to contact us.

  • Earth retaining wall/foundation reinforcement
  • Earth retaining support
  • Temporary Construction Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Mountain Retention Work Cutting Beam

Introducing a construction example of a horizontal member "cut beam" that supports the earth retaining sheet piles to prevent them from collapsing!

A "cut beam" is a horizontal member that supports sheet piles and other structures to suppress soil pressure and prevent soil collapse when performing earth retention work. It is unnecessary when the underground work is shallow, but as the excavation depth increases, the soil pressure becomes stronger, making it necessary because the retaining wall alone does not provide enough support. Excavation is carried out while installing supports for the wall, which is also referred to as shoring. This is a commonly used method, and H-shaped steel is often used for cut beams and struts. 【Features】 ■ A horizontal member that supports the sheet piles to prevent them from collapsing ■ Becomes necessary as the excavation depth increases due to stronger soil pressure *For more details, please refer to the related link page or feel free to contact us.

  • Earth retaining wall/foundation reinforcement
  • Earth retaining support

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Pile Extraction (Multiple Pulleys)

Set a block and tackle on the attachment! A method for pulling out piles, H-beams, and steel sheet piles using reaction force.

The "Multi-Pulley Extraction Method" involves setting a multi-pulley on an attachment, increasing the capacity of the crane's winch wire rope with the multi-pulley, and utilizing reaction force to extract piles, H-beams, and steel sheet piles. In the extraction work, the head of the pile to be extracted is excavated to a depth that the vibrator can grasp, and a leader is installed in a stable location where sufficient reaction force can be obtained. After the head of the pile is grasped by the vibrator, the winch of the extraction machine is wound up to lift the pile while cutting the friction between the pile and the ground, and once it is confirmed that the waist has been cut, the pile is completely lifted using a supplementary winding hook or a corresponding crane. *For more details, please refer to the related link page or feel free to contact us.*

  • Earthworks
  • Civil Engineering Method
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Pile Extraction (All Casing)

Introduction of case studies for all-casing pile extraction, including prefabricated piles and cast-in-place piles!

We would like to introduce a case study of our company's "Pile Extraction (All Casing)" construction method. First, we use an excavator to expose the top of the pile, and then we align the casing screw attached to the heavy machinery with the position of the buried pile and cover it with the casing. While rotating, we excavate down to the tip of the pile, perform the cutting of the pile edge, and confirm that the pile is rotating through the discharge outlet of the casing. Once the edge cutting is completed, the friction is eliminated, and the pile rotation stops. After that, we set a lifting wire at the tip of the buried pile and extract it with a crane. 【Construction Examples】 ■ Extraction of prefabricated piles ■ Extraction of cast-in-place piles (Nagoya City, φ1500 L=47.0m) *For more details, please refer to the related links page or feel free to contact us.

  • Earthworks
  • Civil Engineering Method
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Retaining Wall Work Rock Auger

Active in fields such as the construction of large-diameter foundation piles, underground continuous walls, and pre-boring!

The "Rock Auger Method" is a technique developed to efficiently and economically drill through high N-value gravel layers and hard bedrock. It demonstrates its capabilities in the construction of large-diameter foundation piles, underground continuous walls, and pre-boring, among other fields. By using a double screw method that reverses internally and externally, it allows for high vertical accuracy in construction. Drilling is performed while protecting the hole wall with an outer casing, and during the extraction process, a stabilizing fluid is filled, resulting in minimal impact on the surrounding ground. 【Features】 ■ Efficiently and economically drills through high N-value gravel layers and hard bedrock ■ Demonstrates capabilities in the construction of large-diameter foundation piles and underground continuous walls ■ Achieves high vertical accuracy in construction with the double screw method ■ Minimal impact on the surrounding ground due to the filling of stabilizing fluid during extraction *For more details, please refer to the related link page or feel free to contact us.

  • Earthworks
  • Civil Engineering Method
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Soil Retention Work - Auger Insertion

Introducing the auger-assisted press-in method for embedding sheet piles while excavating with a screw!

The "auger combined pressure insertion method" involves installing sheet piles in the chuck device of the auger machine, rotating the screw inside the casing to excavate while embedding the sheet piles. To embed the next sheet pile, the auger machine is moved, and the next sheet pile is installed in the chuck device. The chuck device is rotated 180° to change the orientation of the sheet pile, and while excavating with the screw, the sheet pile is embedded. This process is repeated for construction. 【Features】 ■ Sheet piles are installed in the chuck device of the auger machine ■ The screw inside the casing is rotated to excavate while embedding the sheet piles *For more details, please refer to the PDF document or feel free to contact us.

  • Earthworks
  • Civil Engineering Method
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Patent Pending] Single-axis Soil Continuous Wall GuisWall Method

A new construction method for building structures underground using a special blade! (Patent Application: 2021-17112)

The "Soil Continuous Wall GuisWall Method" is a new construction method currently under patent application, which uses a special blade to drill overlapping holes for elements and both ends, followed by the insertion of H steel to construct the wall. Using a dedicated drilling machine, the ground is drilled with an auger, and while discharging cement milk from the tip of the auger, the drilling and mixing of the first and second elements is performed. Next, the third element is constructed by overlapping the holes of the first and second elements and performing drilling and mixing. During this process, a special blade is attached and inserted to ensure that the H steel does not sway sideways, allowing for the construction of the structure underground. Additionally, due to the uniaxial construction method, it is also possible to drive long retaining piles and bridge (platform) piles. 【Product Lineup】 ■ Uniaxial Method (Patent Pending Application No.: 2021-17112) ■ SMW Method *For an overview of the method, please refer to the materials available for [PDF Download], and feel free to [Contact Us] for more details.

  • Earthworks
  • Civil Engineering Method
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Retaining Wall Work Cement Milk

A representative vibration-free and noise-free method for driving pre-cast concrete piles and H-shaped steel!

The "Cement Milk Method" is a technique where, after excavation, piles are inserted and integrated with the ground using cement milk as a solidifying agent. Excavation is performed down to the supporting layer using a screw, while injecting cement milk as the screw is withdrawn. After that, piles are inserted, and the hardening of the pile surrounding solidifying liquid integrates the piles with the ground, enhancing the bearing capacity. 【Features】 ■ Vibration-free and noise-free method ■ Integrates piles with the ground to strengthen bearing capacity *For more details, please refer to the PDF document or feel free to contact us.

  • Earthworks
  • Civil Engineering Method
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Soil Retention Work Non-Vibrating Hydraulic Insertion

Smooth construction is possible! Introducing methods for driving and extracting sheet piles.

"Non-vibrating hydraulic pile driving" is a method where several reaction piles (sheet piles) installed underground are clamped and used to provide pull-out resistance, allowing the next pile to be driven in with static load from hydraulic pressure. The pile driving machine, power unit, and crane are set up at the construction site, and the initial reaction piles are installed using a reaction frame. First, the pile driving machine and reaction frame are installed horizontally, using the total weight on the frame as the reaction to drive in the first pile. Then, the pile driving machine is self-propelled to use the driven pile as a reaction pile for the next pile installation. This process is repeated to ensure smooth construction. [Construction Examples] - Silent Piler - Trench Piler - Zero Piler - Zero Crash Piler *For more details, please refer to the PDF document or feel free to contact us.*

  • Earthworks
  • Civil Engineering Method
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Soil Retention Work Vibro

By using auxiliary construction methods, it is possible to respond to various site conditions!

The "Vibro Hammer Method" involves suspending a vibro hammer from a crane and using vibrational force to reduce surrounding friction and tip resistance, allowing for the installation of sheet piles and H-beams underground. The vibrational force of the vibro hammer is transmitted to the sheet piles and H-beams, reducing the surrounding friction and tip resistance, enabling driving and extraction through the weight of the vibro hammer and the piles. In cases where construction with the vibro hammer alone is difficult, auxiliary methods such as water jetting or auger combination can be used to accommodate various site conditions. 【Lineup】 ■THV-35 ■SS20L/SS40L ■SR30/SR45 *For more details, please refer to the PDF document or feel free to contact us.

  • Earthworks
  • Civil Engineering Method
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Retaining Wall Work - Suspended Type

There is almost no vibration or noise during construction! It is possible to perform elevation and lowering work on uneven ground.

The "suspension type" is a machine that can perform work on uneven ground by attaching a dedicated leader to a crane-type base machine. It generates support strength through the integration of piles, enlarged root solidification bulbs, and the ground, with almost no vibration or noise during construction. There are two methods: a one-step method that continuously performs excavation and insertion with tip solidification, and a two-step method where the processes of excavation and insertion with tip solidification are different. The main machine used is the Aboron, among others. 【Features】 ■ Capable of working on uneven ground (lifting and lowering) ■ Almost no vibration or noise during construction ■ Support strength is generated through the integration of piles, enlarged root solidification bulbs, and the ground ■ Available in one-step and two-step methods ■ Main machines include Aboron, etc. *For more details, please refer to the related link page or feel free to contact us.

  • Earthworks
  • Civil Engineering Method
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Retaining Wall Work Leaderless

Due to the absence of a leader, low-altitude operations are possible! It is possible to avoid aerial obstacles.

"Leaderless" is a construction method that utilizes a highly flexible arm based on hydraulic excavators and hydraulic cranes, allowing for auger drilling and pile driving using vibratory methods. Since there is no leader, low-altitude work is possible. By attaching hydraulic augers and hydraulic vibrators to the tip of the arm, work can be performed compactly while avoiding aerial obstacles. 【Features】 ■ Adopts a highly flexible arm ■ Capable of auger drilling and pile driving using vibratory methods ■ Low-altitude work is possible due to the absence of a leader ■ Can perform work compactly ■ Able to avoid aerial obstacles *For more details, please refer to the related link page or feel free to contact us.

  • Earthworks
  • Civil Engineering Method
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 1 Next
  • イプロスがリアル展示会を主催します! AI/DX 営業・マーケティング展 出展社募集中 リード数・商談数が止まらない!新しいリアル展示会を提供 会期 2026年3月24日(火)~25日(水) 会場 東京ビッグサイト東4ホール 出展概要資料を進呈!
    • Contact this company

      Contact Us Online

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.