A "bracing beam" is a structural member that is arranged diagonally within a vertical plane. It takes reaction forces from the support piles and the framework, and supports the retaining wall through the diagonally placed bracing beam. *For more details, please refer to the related link page or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration"Percussion" is a construction method that involves suspending a heavy drilling bit (one bit) from the end of a wire rope and moving the rope up and down to break through geological layers while drilling. It demonstrates its effectiveness in ground conditions that contain many boulders and cobbles, in harsh environments such as rivers, and in narrow spaces where wall construction has previously been difficult. It is suitable for drilling relatively soft geological layers. [Features] - Demonstrates effectiveness in places where wall construction has previously been difficult - Suitable for drilling relatively soft geological layers - Excels in drilling unstable sand layers and boulder layers that are challenging for other methods *For more details, please refer to the related link page or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration"Injection grouting" is a method of improving sandy soil by injecting a solidifying agent (chemical solution) into the voids of the soil to stabilize it. First, a survey is conducted to check for any obstacles, and the construction site is marked. A boring machine is set up, and while supplying drilling fluid (Chemical A and B), the drilling rod is used to inject the solution under pressure, drilling to the specified depth. In the first stage, a fast-setting type of chemical is used to fill large voids in loose sand layers and cohesive soil sections, preventing the injected material from diffusing or leaking from the injection site. In the second stage, a medium-setting to slow-setting type of chemical is used to permeate and inject into the smaller voids of sandy soil that contains a significant amount of medium to well-compacted sand layers and cohesive soil, achieving a solid consolidation of the ground. Once the specified injection amount for one stage is reached, the process moves to the next stage, and after all stages are completed, the chemical solution is replaced with water to fill the injection holes while withdrawing the rod. *For more details, please refer to the related link page or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Deep Well Method" involves installing a deep well inside and outside the excavation trench and using a pump to drain the groundwater that flows into the well. After drilling the ground with excavation machinery, a well casing (screen) is installed, and a submersible pump is inserted into the casing to draw up groundwater. There are several methods for drilling, which are selected based on the depth of the well, the hardness or softness of the ground, and the diameter of the well. 【Features】 ■ Install deep wells inside and outside the excavation trench and pump out the groundwater flowing into the well. ■ After drilling the ground with excavation machinery, install the well casing and insert a submersible pump to draw up groundwater. ■ The drilling method is selected based on the depth of the well, the hardness or softness of the ground, and the diameter of the well. *For more details, please refer to the related link page or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Well Point Method" involves attaching well points to the ends of pipes, injecting jet water, and driving numerous pipes into the ground around the excavation site. This method uses vacuum power to draw groundwater from the installed pipes, thereby lowering the groundwater level. It is a type of well method used when it is anticipated that drainage by well pumps alone will be difficult. It is widely used for underground pipe installation work, septic tank burial work, ground liquefaction countermeasures, and improvement methods for weak ground. This is a ground improvement work used when conducting excavation work in areas with spring water. 【Features】 - Used when it is anticipated that drainage by well pumps alone will be difficult. - Widely used as an improvement method for underground pipe installation work and septic tank burial work. - Used when conducting excavation work in areas with spring water. *For more details, please refer to the related link page or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "placement platform" is installed to secure the flow within the site and the working space for heavy machinery. Many of these platforms are intended for the installation of heavy machinery on structures, dispersing the load of the machinery through the placement platform and opening covers to reduce the impact on the structure. They are also referred to as "access platforms" or "protection platforms." 【Features】 ■ Installed to secure the flow within the site and the working space for heavy machinery ■ Disperses the load of heavy machinery through the placement platform and opening covers to reduce the impact on the structure *For more details, please refer to the related link page or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationA "cut beam" is a horizontal member that supports sheet piles and other structures to suppress soil pressure and prevent soil collapse when performing earth retention work. It is unnecessary when the underground work is shallow, but as the excavation depth increases, the soil pressure becomes stronger, making it necessary because the retaining wall alone does not provide enough support. Excavation is carried out while installing supports for the wall, which is also referred to as shoring. This is a commonly used method, and H-shaped steel is often used for cut beams and struts. 【Features】 ■ A horizontal member that supports the sheet piles to prevent them from collapsing ■ Becomes necessary as the excavation depth increases due to stronger soil pressure *For more details, please refer to the related link page or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Multi-Pulley Extraction Method" involves setting a multi-pulley on an attachment, increasing the capacity of the crane's winch wire rope with the multi-pulley, and utilizing reaction force to extract piles, H-beams, and steel sheet piles. In the extraction work, the head of the pile to be extracted is excavated to a depth that the vibrator can grasp, and a leader is installed in a stable location where sufficient reaction force can be obtained. After the head of the pile is grasped by the vibrator, the winch of the extraction machine is wound up to lift the pile while cutting the friction between the pile and the ground, and once it is confirmed that the waist has been cut, the pile is completely lifted using a supplementary winding hook or a corresponding crane. *For more details, please refer to the related link page or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of our company's "Pile Extraction (All Casing)" construction method. First, we use an excavator to expose the top of the pile, and then we align the casing screw attached to the heavy machinery with the position of the buried pile and cover it with the casing. While rotating, we excavate down to the tip of the pile, perform the cutting of the pile edge, and confirm that the pile is rotating through the discharge outlet of the casing. Once the edge cutting is completed, the friction is eliminated, and the pile rotation stops. After that, we set a lifting wire at the tip of the buried pile and extract it with a crane. 【Construction Examples】 ■ Extraction of prefabricated piles ■ Extraction of cast-in-place piles (Nagoya City, φ1500 L=47.0m) *For more details, please refer to the related links page or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Rock Auger Method" is a technique developed to efficiently and economically drill through high N-value gravel layers and hard bedrock. It demonstrates its capabilities in the construction of large-diameter foundation piles, underground continuous walls, and pre-boring, among other fields. By using a double screw method that reverses internally and externally, it allows for high vertical accuracy in construction. Drilling is performed while protecting the hole wall with an outer casing, and during the extraction process, a stabilizing fluid is filled, resulting in minimal impact on the surrounding ground. 【Features】 ■ Efficiently and economically drills through high N-value gravel layers and hard bedrock ■ Demonstrates capabilities in the construction of large-diameter foundation piles and underground continuous walls ■ Achieves high vertical accuracy in construction with the double screw method ■ Minimal impact on the surrounding ground due to the filling of stabilizing fluid during extraction *For more details, please refer to the related link page or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "auger combined pressure insertion method" involves installing sheet piles in the chuck device of the auger machine, rotating the screw inside the casing to excavate while embedding the sheet piles. To embed the next sheet pile, the auger machine is moved, and the next sheet pile is installed in the chuck device. The chuck device is rotated 180° to change the orientation of the sheet pile, and while excavating with the screw, the sheet pile is embedded. This process is repeated for construction. 【Features】 ■ Sheet piles are installed in the chuck device of the auger machine ■ The screw inside the casing is rotated to excavate while embedding the sheet piles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Soil Continuous Wall GuisWall Method" is a new construction method currently under patent application, which uses a special blade to drill overlapping holes for elements and both ends, followed by the insertion of H steel to construct the wall. Using a dedicated drilling machine, the ground is drilled with an auger, and while discharging cement milk from the tip of the auger, the drilling and mixing of the first and second elements is performed. Next, the third element is constructed by overlapping the holes of the first and second elements and performing drilling and mixing. During this process, a special blade is attached and inserted to ensure that the H steel does not sway sideways, allowing for the construction of the structure underground. Additionally, due to the uniaxial construction method, it is also possible to drive long retaining piles and bridge (platform) piles. 【Product Lineup】 ■ Uniaxial Method (Patent Pending Application No.: 2021-17112) ■ SMW Method *For an overview of the method, please refer to the materials available for [PDF Download], and feel free to [Contact Us] for more details.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Cement Milk Method" is a technique where, after excavation, piles are inserted and integrated with the ground using cement milk as a solidifying agent. Excavation is performed down to the supporting layer using a screw, while injecting cement milk as the screw is withdrawn. After that, piles are inserted, and the hardening of the pile surrounding solidifying liquid integrates the piles with the ground, enhancing the bearing capacity. 【Features】 ■ Vibration-free and noise-free method ■ Integrates piles with the ground to strengthen bearing capacity *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration"Non-vibrating hydraulic pile driving" is a method where several reaction piles (sheet piles) installed underground are clamped and used to provide pull-out resistance, allowing the next pile to be driven in with static load from hydraulic pressure. The pile driving machine, power unit, and crane are set up at the construction site, and the initial reaction piles are installed using a reaction frame. First, the pile driving machine and reaction frame are installed horizontally, using the total weight on the frame as the reaction to drive in the first pile. Then, the pile driving machine is self-propelled to use the driven pile as a reaction pile for the next pile installation. This process is repeated to ensure smooth construction. [Construction Examples] - Silent Piler - Trench Piler - Zero Piler - Zero Crash Piler *For more details, please refer to the PDF document or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Vibro Hammer Method" involves suspending a vibro hammer from a crane and using vibrational force to reduce surrounding friction and tip resistance, allowing for the installation of sheet piles and H-beams underground. The vibrational force of the vibro hammer is transmitted to the sheet piles and H-beams, reducing the surrounding friction and tip resistance, enabling driving and extraction through the weight of the vibro hammer and the piles. In cases where construction with the vibro hammer alone is difficult, auxiliary methods such as water jetting or auger combination can be used to accommodate various site conditions. 【Lineup】 ■THV-35 ■SS20L/SS40L ■SR30/SR45 *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "suspension type" is a machine that can perform work on uneven ground by attaching a dedicated leader to a crane-type base machine. It generates support strength through the integration of piles, enlarged root solidification bulbs, and the ground, with almost no vibration or noise during construction. There are two methods: a one-step method that continuously performs excavation and insertion with tip solidification, and a two-step method where the processes of excavation and insertion with tip solidification are different. The main machine used is the Aboron, among others. 【Features】 ■ Capable of working on uneven ground (lifting and lowering) ■ Almost no vibration or noise during construction ■ Support strength is generated through the integration of piles, enlarged root solidification bulbs, and the ground ■ Available in one-step and two-step methods ■ Main machines include Aboron, etc. *For more details, please refer to the related link page or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration"Leaderless" is a construction method that utilizes a highly flexible arm based on hydraulic excavators and hydraulic cranes, allowing for auger drilling and pile driving using vibratory methods. Since there is no leader, low-altitude work is possible. By attaching hydraulic augers and hydraulic vibrators to the tip of the arm, work can be performed compactly while avoiding aerial obstacles. 【Features】 ■ Adopts a highly flexible arm ■ Capable of auger drilling and pile driving using vibratory methods ■ Low-altitude work is possible due to the absence of a leader ■ Can perform work compactly ■ Able to avoid aerial obstacles *For more details, please refer to the related link page or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration