Introduction of case studies for all-casing pile extraction, including prefabricated piles and cast-in-place piles!
We would like to introduce a case study of our company's "Pile Extraction (All Casing)" construction method. First, we use an excavator to expose the top of the pile, and then we align the casing screw attached to the heavy machinery with the position of the buried pile and cover it with the casing. While rotating, we excavate down to the tip of the pile, perform the cutting of the pile edge, and confirm that the pile is rotating through the discharge outlet of the casing. Once the edge cutting is completed, the friction is eliminated, and the pile rotation stops. After that, we set a lifting wire at the tip of the buried pile and extract it with a crane. 【Construction Examples】 ■ Extraction of prefabricated piles ■ Extraction of cast-in-place piles (Nagoya City, φ1500 L=47.0m) *For more details, please refer to the related links page or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the related link page or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related link page or feel free to contact us.
Company information
Meisei Kenzai Co., Ltd. was established in 1988 and has contributed to community development with the motto of "Technology, Safety, and Trust" as a foundation specialist. As experts in earth retention work, we ensure that our experienced craftsmen accurately understand the site at all times, making improvements and innovations to provide high-quality technology and peace of mind. We propose construction methods that meet high-quality and safety needs through established techniques, and we provide total support from design to construction, regardless of various construction conditions.