iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35428items
    • Facilities
      Facilities
      55901items
    • Lighting and Interior
      Lighting and Interior
      17201items
    • Common materials
      Common materials
      36613items
    • Civil Engineering Materials
      Civil Engineering Materials
      9500items
    • Construction, work and methods
      Construction, work and methods
      27282items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29203items
    • IT/Software
      IT/Software
      32121items
    • others
      others
      76437items
    • Store and facility supplies
      Store and facility supplies
      4333items
    • Office and commercial supplies
      Office and commercial supplies
      11352items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      949items
    • Logistics Equipment
      Logistics Equipment
      6748items
    • Energy and Resources
      Energy and Resources
      11527items
  • Search for companies by industry

    • Information and Communications
      7206
    • others
      6999
    • Building materials, supplies and fixtures manufacturers
      6674
    • Service Industry
      4626
    • Trading company/Wholesale
      2998
    • Other construction industries
      2453
    • Electrical equipment construction business
      641
    • Interior Design
      528
    • Facility Design Office
      489
    • Construction Consultant
      464
    • Architectural design office
      360
    • retail
      344
    • Warehousing and transport related industries
      321
    • Electricity, Gas and Water Industry
      290
    • General contractors and subcontractors
      287
    • Interior construction business
      274
    • Medical and Welfare
      274
    • Educational and Research Institutions
      258
    • Building Management
      252
    • Renovation and home construction industry
      224
    • Water supply and drainage construction business
      203
    • Housing manufacturers and construction companies
      187
    • Transportation
      161
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      124
    • Structural Design Office
      66
    • Finance, securities and insurance
      36
    • Restaurants and accommodations
      29
    • self-employed
      29
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Other construction industries
  3. 一般社団法人 全国落石災害防止協会
  4. Product/Service List
Other construction industries
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

一般社団法人 全国落石災害防止協会

EstablishmentSeptember 1984
addressOkayama/Kita-ku, Okayama-shi/1-1-30 Yamato Town (inside Daini Kensetsu Co., Ltd.)
phone086-222-9210
  • Special site
  • Official site
last updated:Jun 10, 2022
一般社団法人 全国落石災害防止協会logo
  • Contact this company

    Contact Us Online
  • Company information
  • Products/Services(21)
  • catalog(9)
  • news(4)

一般社団法人 全国落石災害防止協会 List of Products and Services

  • category

1~14 item / All 14 items

Displayed results

Filter by category

Rock Adhesive DK Bond Method Rock Adhesive DK Bond Method
Achievement Achievement
Achievement

Achievement

This is an introduction about "achievements."

Construction Achievements: H30 Kyoto City, Kyoto Prefecture

Integrating floating stones with the bedrock to prevent rockfalls in advance! Introducing our achievements in Kyoto City, Kyoto Prefecture.

We would like to introduce the construction achievements of the DK Bond Method. The implementation of this method closes crack openings and prevents loosening of the bedrock due to weathering, while also dispersing concentrated stress in the area. This results in excellent durability against repeated loads such as earthquakes and demonstrates a high effectiveness in preventing falling rocks. 【Construction Achievements】 ■Project Number: 3563 ■Client: Kyoto Prefectural Forestry Office ■Main Contractor: Sanwa Construction Co., Ltd. ■Project Name: FY 2017 Erosion Control Project (Emergency Erosion Prevention) (National Treasury Debt Obligation) ■Prefecture: Kyoto Prefecture ■Construction Location: Kurama Honmachi, Sakyo Ward, Kyoto City ■Construction Start: June 2018 ■Construction End: August 2018 *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Achievements: FY 2018, Fuchu City, Hiroshima Prefecture

Excellent durability against repeated loads such as earthquakes! Introducing our achievements in Fuchu City, Hiroshima Prefecture.

We would like to introduce the construction achievements of the DK Bond Method. The implementation of this method closes crack openings and prevents loosening of the bedrock due to weathering, while also dispersing the concentrated stress in the area. This results in excellent durability against repeated loads such as earthquakes and demonstrates a high effectiveness in preventing falling rocks. 【Construction Achievements】 ■Project Number: 3559 ■Client: Hiroshima Prefectural Eastern Construction Office ■Main Contractor: Amano Kiko Co., Ltd. ■Project Name: Fuchu Up and Down Line Road Disaster Prevention Work (Fuchihara Section) ■Prefecture: Hiroshima ■Construction Location: Kawamachi, Fuchu City ■Start Date: June 2018 ■End Date: September 2018 *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Achievements] H30 Hyogo Prefecture, Kanzaki District

Demonstrating high rockfall prevention effectiveness! Introducing the achievements in Kanzaki County, Hyogo Prefecture.

We would like to introduce the construction results of the DK Bond Method. The implementation of this method closes crack openings and prevents loosening of the bedrock due to weathering, while also dispersing concentrated stress in the area. This results in excellent durability against repeated loads such as earthquakes and demonstrates a high rockfall prevention effect. 【Construction Results】 ■ Client: Hyogo Prefectural Nakaharima Bureau ■ General Contractor: Tateiwa Co., Ltd. ■ Project Name: Landslide Countermeasure Work in the Nagase Area (Part 2) ■ Prefecture: Hyogo ■ Construction Location: Kamikawa Town, Kanzaki County ■ Construction Start: April 2018 ■ Construction End: December 2018 *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Achievements] H30 Izumo City, Shimane Prefecture

It is possible to stabilize natural rock formations in their current state! We will introduce our achievements in Izumo City, Shimane Prefecture.

We would like to introduce the construction achievements of the DK Bond Method. The implementation of this method closes crack openings and prevents loosening of the rock mass due to weathering, while also dispersing the stress concentrated in the area. This results in excellent durability against repeated loads such as earthquakes and demonstrates a high rockfall prevention effect. 【Construction Achievements】 ■Project Number: 3606 ■Client: Izumo City ■Main Contractor: Mihara Corporation ■Project Name: Disaster Prevention Rockfall Prevention Work for Machitakanishi Line ■Prefecture: Shimane ■Construction Location: Sada Town, Izumo City, Hanbe ■Construction Start: December 2018 ■Construction End: February 2019 *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Achievements: H30 Okayama Prefecture Kamisaibara

Applicable to giant rocks and high-altitude rocks! Introducing the achievements in Kamisaibara, Okayama Prefecture.

We would like to introduce the construction achievements of the DK Bond Method. The implementation of this method closes cracks and openings to prevent loosening of the bedrock due to weathering, while also dispersing concentrated stress in the area. This results in excellent durability against repeated loads such as earthquakes and demonstrates a high rockfall prevention effect. 【Construction Achievements】 ■ Project Number: 3579 ■ Client: Okayama Prefectural Mimasaka Bureau of Construction ■ General Contractor: Nakaniishi Kogyo Co., Ltd. ■ Project Name: 52-18-52 2-18-1 Public Road Construction (Slope Work) ■ Prefecture: Okayama ■ Construction Location: Kamisaihara, Kagamino Town, Tomata County ■ Construction Start Date: September 2018 ■ Construction End Date: November 2018 *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Data] DK Bond Method Construction Performance Site Investigation Record (Hanshin-Awaji Earthquake)

Introduction of the site investigation records for the construction results of rockfall prevention works that bond rockfall sources.

The Great Hanshin-Awaji Earthquake, which occurred in the early morning of January 17, 1995, vividly demonstrated the terrifying nature of urban-subduction earthquakes. In the disaster area, there were several locations where rockfall prevention work was carried out using the DK Bond method. Our company conducted a follow-up survey on the impact of the earthquake on these construction sites from mid-February to early March, one month after the disaster. This document includes the survey records of those construction achievements. [Contents] ■ Investigation of the disaster area ■ Overview of the earthquake ■ Conditions of adjacent non-construction areas and rockfall occurrences *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Data] DK Bond Method Construction Performance Site Investigation Record (Western Tottori Prefecture, Geiyo)

Introduction to the report on the follow-up survey of construction achievements near the epicenter zone of the Tottori Prefecture West Earthquake and the Geiyo Earthquake.

This document is a record of construction performance site investigations related to the western Tottori earthquake and the Geiyo earthquake. It includes information on the damage conditions in various areas during the occurrence of the western Tottori earthquake (M7.3, intensity 6 strong) and the Geiyo earthquake (M6.7, intensity 6 weak), as well as the status of rock bonding methods. Additionally, many photographs of construction sites are also presented. [Contents] - Report on the tracking investigation of construction performance sites near the epicenter (western Tottori earthquake) - Report on the tracking investigation of construction performance sites around the epicenter (Geiyo earthquake) - DK Bond method rock bonding rockfall prevention work - Fundamental principles of rock bonding methods - Achievements of the rock bonding DK Bond method *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Data] Rock Bonding DK Bond Method 2010 Follow-up Survey

Rockfall prevention work that aims for harmony with nature! We boast over 2,800 construction achievements.

This document is a collection of follow-up investigation photographs related to the Rock Bond DK construction method. It includes observations from construction sites affected by major earthquakes in Japan, including the 1995 Great Hanshin-Awaji Earthquake, as well as recent large-scale earthquakes. The content presents follow-up investigations conducted over "10 years, 15 years" since those events. [Contents] ■ Greetings ■ Follow-up investigation from 1997 construction ■ Follow-up investigation from 2002 construction ■ Follow-up investigation from 2003 construction ■ List of follow-up investigation sites for DK Bond method in Kochi Prefecture ■ Follow-up investigation after the Geiyo Earthquake *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Data] Comparison photos before and after construction of the Rock Bond DK Method

Please check its performance through the photos before and after construction. (Earthquake resistance that can withstand massive earthquakes!)

This document introduces examples of the rock adhesion "DK Bond Method" through comparison photos before and after construction. [Contents] ■ Rock Adhesion DK Bond Method Construction Achievements ■ Client ■ General Contractor ■ Project Name ■ Prefecture/City/Town/Village *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Data] Two earthquakes, Awaji Island, Sumoto City, Hyogo Prefecture

23 years after construction. Here is the documentation confirming that there are no abnormalities such as cracks or peeling at the site of the subsequent construction work.

On April 13, 2013, a strong earthquake registering a magnitude of 6 occurred in Sumoto City, Hyogo Prefecture, causing significant damage in the local area. This document presents records confirming that there were no abnormalities such as cracks or delamination at the construction site of the adhesive work, which had been completed 23 years prior. [Contents Included] ■ Sumoto City, Kojiya, Hyogo Prefecture - 4 years after construction (photos) ■ Okuyama, Ashiya City (Rock Garden) - 2 years after construction (photos) ■ 23 years after construction (photos) *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction of rockfall prevention construction methods.

We handle not only large rocks and collapsed rocks but also deteriorated dams and cultural properties! Here are various examples of our construction work.

We would like to introduce examples of "rockfall prevention construction methods" by Daini Kensetsu Co., Ltd. Our rockfall prevention methods are applied in various locations. The DK Bond method, which does not require formwork, is effective for stabilizing high places and large boulders, as well as areas with a high risk of collapse. As a result, we have a track record of construction in steep slopes across Japan, as well as in deteriorated embankments, stone walls, artificial structures, and the restoration of cultural properties. If you are facing issues with rockfall prevention methods, please feel free to consult with us. 【Examples of Construction】 ■ Stabilization of large boulders ■ Stabilization of collapsed rocks ■ Fixing of slope cracks ■ Repair of deteriorated embankments and artificial structures ■ Restoration of stone walls and cultural properties *For more details, please refer to the PDF materials or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rockfall prevention construction method seismic performance results

No changes even at seismic intensity 7! We would like to introduce the seismic performance results of our rockfall prevention construction method.

We would like to introduce the "Seismic Performance Achievements" of Daini Kensetsu Co., Ltd. Our rockfall prevention method is designed to withstand massive earthquakes and has proven effective in various locations across Japan. It showed no deformation even during the Great Hanshin-Awaji Earthquake, which registered a magnitude of 7 in 1995, and has successfully withstood numerous earthquakes since then, including the 2000 Tottori Prefecture Western Earthquake and the 2007 Noto Peninsula Earthquake. If you have concerns regarding rockfall prevention methods, please feel free to consult us. 【Seismic Achievements】 ■ Great Hanshin-Awaji Earthquake (Magnitude 7) ■ Tottori Prefecture Western Earthquake (Magnitude 6+) ■ Geiyo Earthquake (Magnitude 6-) ■ Noto Peninsula Earthquake (Magnitude 6+) ■ Great East Japan Earthquake (Magnitude 6-) ■ Kumamoto Earthquake (Magnitude 7) *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rock bonding DK bond method *Presentation of construction performance list!

Over 3,900 construction achievements! Introducing our original rock bonding method that withstands massive earthquakes.

The "Rock Adhesive DK Bond Method" is a rockfall prevention technique that uses adhesive material (DK Bond Mortar) to bond unstable rock masses to solid bedrock, thereby achieving stability through integration. Since the development of this method, it has been implemented on a national scale for over 40 years, with more than 3,900 successful projects. It can be applied to steep slopes, high altitudes, and very unstable boulders, and it possesses seismic performance that can withstand massive earthquakes. We are currently offering a document summarizing our construction achievements. 【Features】 ■ Effective for boulders and high-altitude rocks ■ Easy to combine with other methods ■ Effective for preserving natural landscapes *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Stone masonry (stone wall) repair and restoration using the Rock Bond DK method.

Adhering and integrating unstable rock masses with stable bedrock! Introducing construction procedures and various construction achievements.

This document introduces the construction results of stone masonry repair using the Rock Adhesion DK Bond method. The Rock Adhesion DK Bond method is a technique that stabilizes unstable rock masses by bonding them to stable bedrock using an adhesive material (DK Bond Mortar). We provide information on "stone masonry (stone wall) repair and reinforcement using the Rock Adhesion DK Bond method," "construction procedures," and various construction results. [Contents] ■ Stone masonry (stone wall) repair and reinforcement using the Rock Adhesion DK Bond method ■ Stone masonry (stone wall) repair construction procedures ■ Stone masonry (stone wall) repair construction results *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 1 Next
  • イプロスがリアル展示会を主催します! AI/DX 営業・マーケティング展 出展社募集中 リード数・商談数が止まらない!新しいリアル展示会を提供 会期 2026年3月24日(火)~25日(水) 会場 東京ビッグサイト東4ホール 出展概要資料を進呈!
    • Contact this company

      Contact Us Online

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.