1~13 item / All 13 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~13 item / All 13 items
"The puddle in the garden won't dry up..." "The ground is loose, and liquefaction is occurring." Do you have such concerns? The cause may be due to "ground changes" caused by earthquakes and other factors. "Subsidence correction work" is a construction process to fix the subsidence and deformation of buildings caused by ground subsidence, landslides, volume compression of fill, and crustal movements due to earthquakes, in order to restore stability. We propose methods tailored to the current ground conditions, including the "steel pipe pile driving method" to correct tilting and prevent further subsidence, as well as the "pressure-resistant slab method" and the "foundation raising method." We will provide guidance based on your housing concerns and the state of the ground and tilting. Additionally, we have a model of subsidence correction work displayed on our headquarters premises. If you wish to visit, please feel free to contact us. [Types of Methods] ■ Steel Pipe Pile Driving Method ■ Pressure-Resistant Slab Method ■ Combined Steel Pipe Pile Driving and Pressure-Resistant Slab Method ■ Foundation Raising Method *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration"The door doesn't close properly." "There is a half-open gap in the window." Do you have such concerns? The cause may be the "tilting" due to changes in the building's foundation. "Settlement correction work" is a construction process to fix the sinking or deformation of buildings caused by ground subsidence, landslides, volume compression of fill, or crustal movements due to earthquakes, in order to restore stability. If such tilting is left unaddressed, it may lead to extensive repairs later on, or there is a possibility of significant damage during natural disasters such as earthquakes, so early intervention is crucial. We propose methods tailored to the current ground conditions, including the "steel pipe pile driving method," "pressure-resistant slab method," and "foundation raising method," to correct the tilt and prevent re-sinking. Our company, which has numerous construction achievements, will guide you according to your concerns and the state of the ground and tilt. Additionally, we have a model of the settlement correction work on display at our headquarters. If you wish to visit, please feel free to contact us. 【Types of Methods】 ■ Steel pipe pile driving method ■ Pressure-resistant slab method ■ Combined method of steel pipe pile driving and pressure-resistant slab ■ Foundation raising method *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration"The ball rolls on what should be a level floor..." Do you have such concerns? The cause is likely due to the "tilt" of the building caused by ground changes. "Settlement repair work" is the construction to correct the sinking and deformation of buildings caused by ground subsidence, landslides, volume compression of fill, and crustal movements due to earthquakes, in order to restore stability. We propose methods tailored to the current ground conditions, including the "steel pipe pile driving method" to correct the tilt and prevent re-sinking, as well as the "pressure-resistant slab method" and the "foundation raising method." We will guide you according to your housing concerns and the state of the ground and tilt. Additionally, we have a model of settlement repair work on display at our headquarters. If you wish to visit, please feel free to contact us. [Types of Methods] ■ Steel Pipe Pile Driving Method ■ Pressure-Resistant Slab Method ■ Combined Steel Pipe Pile Driving and Pressure-Resistant Slab Method ■ Foundation Raising Method *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration"I feel like my house is leaning..." If that's the case, please consult Apple House. The causes of sinking can vary widely, including earthquakes, ground subsidence, and construction defects. We propose methods tailored to the current ground conditions, including the "Steel Pipe Pile Press-in Method" to correct the tilt and prevent further sinking, as well as the "Pressure-Resistant Slab Method" and the "Foundation Lifting Method." Additionally, we have a model of sinking correction work on display at our headquarters. If you would like to visit, please feel free to contact us. 【Types of Methods】 ■ Steel Pipe Pile Press-in Method ■ Pressure-Resistant Slab Method ■ Combined Method of Steel Pipe Pile Press-in and Pressure-Resistant Slab ■ Foundation Lifting Method *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationIf you leave cracks and fissures in the foundation unattended, the foundation will not be able to bear the load of the building during an earthquake. "Ganko Oyaji" is a subsidence correction method that achieves high-strength reinforcement exceeding that of new construction with seven robust layers, including carbon fiber. It can reinforce even unreinforced foundations to 2 to 4 times stronger than conventional methods. It possesses features such as high strength, high durability, shear strength, improved toughness, short construction periods, and low cost. 【Features】 ■ High strength, high durability, shear strength, improved toughness, short construction periods, low cost ■ Can reinforce even unreinforced foundations to 2 to 4 times stronger than conventional methods ■ Results of full-scale strength performance tests - Achieves 10 times the strength of steel plates and 1.5 times the strength of aramid fibers ■ Seven robust layers protect the foundation of your home *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration"Void Injection Work" is a method used when a void (cavity) is confirmed beneath a building. Cement-based filling material is injected into the void under the foundation. By stabilizing the building on solid ground, it is possible to reduce earthquake damage. This method can prevent the tilting of the building and restore a comfortable and safe living environment. 【Features】 - Suitable when a void (cavity) is confirmed beneath the building - Cement-based filling material is injected into the void under the foundation - Reduces earthquake damage by stabilizing the building on solid ground - Prevents the tilting of the building and restores a comfortable and safe living environment *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Foundation Lifting Method" is a sinking correction method used when the settlement of a building has stabilized. It involves jacking up only the building above the foundation, using the foundation as a reaction force. This method corrects the tilt of the building by jacking it up to restore it to a level position, allowing for a comfortable and safe living environment. 【Features】 ■ Suitable for cases where the building's settlement has stabilized ■ Jacks up only the building above the foundation, using the foundation as a reaction force ■ Corrects the tilt of the building by jacking it up to restore a level position, allowing for a comfortable and safe living environment *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Steel Pipe Pile Driving and Pressure Distribution Slab Method (Combined Method)" is a sinking correction method used in cases of settlement due to volume compression of fill soil. Construction is carried out using a combination of steel pipe piles and pressure distribution slabs. By correcting the building to a solid foundation, it is possible to reduce earthquake damage. The tilt of the building is jacked up and leveled, restoring a comfortable and safe living environment. 【Features】 ■ Suitable for cases of settlement due to volume compression of fill soil ■ Construction using a combination of steel pipe piles and pressure distribution slabs ■ Reduces earthquake damage by correcting the building to a solid foundation ■ Restores a comfortable and safe living environment by jacking up and leveling the building *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Pressure-resistant slab method" is a settlement correction method used when there is a layer of weak ground less than 1.5 meters beneath a building. It creates improved ground from the supporting layer to take reaction force. By correcting the building to a solid ground, it is possible to reduce earthquake damage. The building's tilt is jacked up and leveled, restoring a comfortable and safe living environment. 【Features】 ■ Suitable when there is a layer of weak ground less than 1.5 meters beneath the building ■ Creates improved ground from the supporting layer to take reaction force ■ Reduces earthquake damage by correcting the building to a solid ground ■ Jacks up the building to level it and restores a comfortable and safe living environment *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Steel Pipe Pile Driving Method" is a settlement correction method used when there is a layer of weak ground beneath a building that is more than 1.5 meters deep. The tip of the steel pipe pile is driven into the supporting layer. By correcting the building to a stable foundation, it is possible to reduce earthquake damage. The building's tilt is jacked up and leveled, restoring a comfortable and safe living environment. 【Features】 ■ 10-year warranty ■ Suitable when there is a layer of weak ground beneath the building that is more than 1.5 meters deep ■ The tip of the steel pipe pile is driven into the supporting layer ■ Reduces earthquake damage by correcting the building to a stable foundation ■ Restores a comfortable and safe living environment by jacking up and leveling the building's tilt *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration"Settlement correction work" refers to the construction aimed at correcting the sinking and deformation of buildings caused by changes in the ground due to ground subsidence, landslides, volume compression of fill, and crustal movements due to earthquakes, in order to restore stability. Are there symptoms of sinking or deformation, such as "a ball rolling when placed on the floor" or "cracks in the building foundation"? Apple House can fix it. By correcting the building to a solid foundation, it is possible to reduce earthquake damage. We will jack up the tilt of the building to level it and restore a safe and comfortable living environment. [Features] ■ Reduces earthquake damage by correcting the building to a solid foundation. ■ Levels the tilt of the building by jacking it up, restoring a safe and comfortable living environment. *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe Ministry of Land, Infrastructure, Transport and Tourism has mandated regular inspections of all bridges every five years. Apple House Co., Ltd. offers "Bridge Inspections." Inspections can be conducted using bridge inspection vehicles, aerial work platforms, ladders, and barges. To ensure that existing structures can be used in the long term, we propose and implement better repair methods. Please feel free to contact us when needed. 【Features】 ■ Inspection services by certified road bridge inspectors ■ Preparation of reports in accordance with the regular bridge inspection guidelines for each municipality ■ Proposal and implementation of detailed investigations tailored to each type of damage and condition ■ Proposal and implementation of better repair methods to ensure that existing structures can be used in the long term ■ Two J-BEC certified road bridge inspectors on staff *For more details, please refer to the related link page or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration"Subsidance correction work" refers to construction aimed at correcting the subsidence and deformation of buildings caused by changes in the ground due to ground subsidence, landslides, volume compression of embankments, and crustal movements due to earthquakes, in order to restore stability. By correcting buildings to be on solid ground, it not only helps to regain a comfortable and safe living environment but also contributes to the reduction of earthquake damage. [Types] ■ Steel pipe pile driving method ■ Pressure-resistant slab method ■ Combination of steel pipe pile driving method and pressure-resistant slab method ■ Foundation raising method ■ Void injection work *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration