1~2 item / All 2 items
Displayed results
Filter by category

Bored pile construction method
A low headroom sliding method using an all-casing (full rotary) construction technique that allows work up to a headroom limit of 4.4 meters. For place-driven piles in ground with boulders or bedrock, construction is carried out using the super top method.