1~4 item / All 4 items
Filter by category

Liquefaction countermeasure construction method
We are implementing the simultaneous embedding method "OHO Drain Method," which suppresses the discharge of excavated soil to the surface and allows for the installation of drainage materials at a specified depth simultaneously with the completion of drilling, as well as construction methods for liquefaction countermeasures such as "High Grip Grout Method" and "Ultra-Multi-Point DP Method" using chemical injection.