iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35486items
    • Facilities
      Facilities
      55933items
    • Lighting and Interior
      Lighting and Interior
      17273items
    • Common materials
      Common materials
      36682items
    • Civil Engineering Materials
      Civil Engineering Materials
      9529items
    • Construction, work and methods
      Construction, work and methods
      27314items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29367items
    • IT/Software
      IT/Software
      33464items
    • others
      others
      76595items
    • Store and facility supplies
      Store and facility supplies
      4373items
    • Office and commercial supplies
      Office and commercial supplies
      11477items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      972items
    • Logistics Equipment
      Logistics Equipment
      6773items
    • Energy and Resources
      Energy and Resources
      11673items
  • Search for companies by industry

    • Information and Communications
      7216
    • others
      7026
    • Building materials, supplies and fixtures manufacturers
      6648
    • Service Industry
      4652
    • Trading company/Wholesale
      3002
    • Other construction industries
      2448
    • Electrical equipment construction business
      642
    • Interior Design
      526
    • Facility Design Office
      489
    • Construction Consultant
      465
    • Architectural design office
      360
    • retail
      344
    • Warehousing and transport related industries
      321
    • Electricity, Gas and Water Industry
      289
    • General contractors and subcontractors
      283
    • Interior construction business
      278
    • Medical and Welfare
      274
    • Educational and Research Institutions
      258
    • Building Management
      253
    • Renovation and home construction industry
      222
    • Water supply and drainage construction business
      201
    • Housing manufacturers and construction companies
      186
    • Transportation
      160
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      126
    • Structural Design Office
      66
    • Finance, securities and insurance
      38
    • Restaurants and accommodations
      30
    • self-employed
      30
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      7
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. General contractors and subcontractors
  3. 横山基礎工事
  4. Product/Service List
General contractors and subcontractors
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

横山基礎工事

addressHyogo/Sayo-cho, Sayo-gun/Zhensheng 385-2
phone0790-82-2215
  • Special site
  • Official site
last updated:Mar 11, 2022
横山基礎工事logo
  • Contact this company

    Contact Us Online
  • Company information
  • Products/Services(14)
  • catalog(2)
  • news(0)

横山基礎工事 List of Products and Services

  • category

1~3 item / All 3 items

Displayed results

Filter by category

Down the Hole Hammer Down the Hole Hammer
仮橋仮桟橋工 仮橋仮桟橋工
鋼管杭・鋼管矢板工 鋼管杭・鋼管矢板工
作業台船 作業台船
仮橋仮桟橋工

仮橋仮桟橋工

山間部・河川・ダム湖・災害復旧など、あらゆる現場環境に適応可能な仮橋・仮設構台の急速施工です

Temporary bridge temporary pier cable-stayed construction method "LIBRA Method"

Eliminating the need for high-altitude work while significantly shortening the construction process and improving safety.

The "LIBRA Method" is a temporary bridge and cantilever construction method that simplifies the securing of pile alignment by using upper steel panels as guides for pile driving, eliminating the need for scaffolding until the upper structure is erected, and streamlining the complex reinforcement of bridge piers on sloped terrain. Since high-altitude work is not required, it ensures safety while reducing work time. It is often adopted as part of national resilience initiatives and has a wealth of experience in construction access roads and work platforms for the expansion of highways to four lanes, as well as disaster recovery projects. 【Features】 - Enables parallel work on upper and lower structures, reducing waiting time and shortening processes. - The connection points of the newly installed panels to the pile bridge piers serve as guides for steel pipe installation, eliminating the need for dangerous guide material installation work. This improves safety while also reducing changes to the natural terrain and minimizing deforestation, thereby lessening the impact on the natural environment. - Drilling and installation can proceed simultaneously, allowing for stable construction from soft ground to hard ground. - Adaptable to various site conditions such as steep slopes in mountainous areas, rivers, dams, ports, and urban civil engineering. *For more details, please refer to the materials. Feel free to contact us with any inquiries.*

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Phoenix Stage Method

Achieving rapid construction of temporary piers in low headroom! Suitable for work platforms in low headroom situations such as road construction and railway bridges.

The "Phoenix Stage Construction Method" is a rapid construction method for temporary piers suitable for maintenance and repair work during dry periods. In spaces with a clearance of less than 6 meters, it reduces the number of welding points on support piles using a low-head telescopic crane and the newly developed Phoenix Hammer, enabling high-quality rapid construction. Together with the LIBRA method, it rapidly constructs a working stage for various repair and reinforcement works, as well as disaster recovery works, including low-head spaces within rivers, creating a comfortable construction period. 【Features】 - Rapid construction of piers in working spaces under 6 meters - Pre-construction of superstructures via stay cable equipment - Simultaneous parallel construction of ground assembly and pile driving - Use of steel pipes as support piles *For more details, please refer to the PDF materials or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Temporary bridge and temporary pier construction method with a 20m span integrated installation - L pier construction method.

Reduction of the number of piles due to the long span girder construction! Temporary bridge and temporary pier construction using a 20m span unified erection method.

The "L Pier Construction Method" utilizes high-strength materials for the fabrication of girders and steel pipe piles, allowing for the use of large construction machinery capable of operating in an 8-meter width, achieving a maximum span length of 20 meters through vertical installation. This method can accommodate year-round placement within rivers, eliminating the need for repeated installation and removal during non-flood periods. As a result, it can be utilized for the construction, renewal, and maintenance of large river structures such as long bridges, as well as for wide-ranging disaster recovery and reconstruction projects, including construction piers, detours, and emergency bridges. It is the first long-span compatible LIBRA bridge. By connecting the pile frame with brace pipes and brace materials in a ground assembly and installing them as a unit, the need for lifting operations is eliminated, enhancing safety. **Features** - By pre-installing the assembled upper panels through reaction poles, safety and workability are improved. - The use of high-strength materials for the main frame enhances quality and strength. - Connecting the pile frame with brace pipes and brace materials in a ground assembly and installing them as a unit eliminates the need for lifting operations, improving safety. *For more details, please download the PDF or feel free to contact us.*

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 1 Next
  • 展示会のお礼メールを送り切れない… 名刺交換したすべての人をデジタル名刺で自動フォロー
  • 法人リスト DM・制作・発送 一括ご依頼できます! 特約契約を保持 3億通の実績と安心 DMの事ならメールカスタマーセンター
    • Contact this company

      Contact Us Online

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.