136~180 item / All 204 items
Displayed results
Filter by category
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online136~180 item / All 204 items
Filter by category
We would like to introduce a case where our "Tezak Super Lock (G-spec)" was used in the restoration work of the slope at Kinkai Komyoji Temple. This project was commissioned privately and carried out in Kyoto Prefecture. The soil types included clayey soil, rock masses, and cobblestones, covering an area of 250m2 for the restoration work. This method is designed to suppress the initial movement of scattered boulders and floating stones on the slope by utilizing the flexibility of wire ropes and the restraining and supporting power of anchors. [Case Overview] ■ Project Name: Restoration Work of the Slope at Kinkai Komyoji Temple ■ Location: Kyoto Prefecture ■ Construction Date: May 2022 (Year 4 of Reiwa) ■ Area: 250m2 ■ Soil Types: Clayey soil, rock masses, cobblestones *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where our "Tezak Super Lock (contact type)" was implemented in slope maintenance work near a railroad crossing. This project was commissioned by a private entity and carried out in Hyogo Prefecture. The soil type was gravelly soil, and it involved rockfall countermeasures and preventive work over an area of 1,500 m2. The contact type method involves installing thick wire mesh as auxiliary material to prevent erosion from gravel and other materials while preventing floating and rolling rockfalls. [Case Overview] ■ Project Name: Slope Maintenance Work Near Railroad Crossing ■ Location: Hyogo Prefecture ■ Construction Date: February 2021 (Reiwa 3) ■ Area: 1,500 m2 ■ Soil Type: Gravelly Soil *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where our "Tezak Super Lock (net type)" was installed for the slope protection work on the Major Local Road Nara Kasagi Line. This project was commissioned by the Nara Prefectural Civil Engineering Office and was carried out within Nara Prefecture. The soil type consists of rock blocks and pebbles, and it is a rockfall countermeasure and prevention work over an area of 200m2. The net type method involves installing wire ropes at 50cm intervals as auxiliary components, and it is applicable to rock slopes that are at risk of loose rocks and rolling stones. [Case Overview] ■ Project Name: Slope Protection Work on the Major Local Road Nara Kasagi Line ■ Location: Nara Prefecture ■ Construction Date: February 2022 (Year 4 of Reiwa) ■ Area: 200m2 ■ Soil Type: Rock blocks and pebbles *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an introduction to a case where a wire rope-supported rockfall protection fence called "Rabbit Fence" was constructed as part of the prefectural road improvement project. The project was commissioned by the Takahagi Construction Office in Ibaraki Prefecture and was carried out in Ibaraki Prefecture. The soil type consisted of rock and gravel, with a quantity of 50m². This method allows for the installation of posts directly into the ground by using an anchor foundation for securing the posts. 【Case Overview】 ■ Project Name: Prefectural Road Improvement Project ■ Location: Ibaraki Prefecture ■ Construction Date: February 2013 (Heisei 25) ■ Quantity: 50m² ■ Soil Type: Rock and Gravel *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where we installed the "Tezak Super Lock (contact type)" for rockfall prevention using rope laying work in the slope and flooding countermeasure construction of the town road Shimo-Harayama Kaiku Line. This project was commissioned by the Kawai Town Hall in Iwate Prefecture and was carried out in Iwate Prefecture. The area covered was 3,500 m², aimed at rockfall countermeasures and prevention. This method is designed to suppress the initial movement of scattered loose rocks and boulders on slopes through the flexibility of wire ropes and the restraining and supporting power of anchors. 【Case Overview】 ■ Project Name: Slope and Flooding Countermeasure Construction of the Town Road Shimo-Harayama Kaiku Line ■ Location: Iwate Prefecture ■ Construction Date: June 2021 (Year 3 of Reiwa) ■ Area: 3,500 m² ■ Purpose: Rockfall countermeasures and prevention *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an introduction to a case where the "Tezak Super Lock (G-spec)" was installed for rockfall prevention as part of the municipal land improvement project slope repair work. The project was commissioned by the Chikuma City Hall in Nagano Prefecture and was carried out in Nagano Prefecture. The area covered was 150m², implemented as a rockfall countermeasure and prevention. This method utilizes the flexibility of wire ropes and the restraining and supporting power of anchors to suppress the initial movement of loose stones and boulders scattered on the slope. [Case Overview] ■ Project Name: Municipal Land Improvement Project Slope Repair Work ■ Location: Nagano Prefecture ■ Date of Construction: October 2019 (R1) ■ Area: 150m² ■ Purpose: Rockfall Countermeasure and Prevention *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where the "Tezak Super Lock (G-spec)" was installed as a rockfall prevention rope work in the restoration and mountain conservation project in the Nabewari area. This project was commissioned by the Gunma Forest Management Office of the Kanto Regional Forest Management Bureau and was carried out in Gunma Prefecture. The area covered is 400m², with the soil type being rock and gravel. This method involves the installation of wire mesh and erosion control mats as auxiliary materials to prevent the erosion of accumulated soil while primarily preventing rockfall in the form of rolling stones. 【Case Overview】 ■ Project Name: Nabewari Area Restoration and Mountain Conservation Project ■ Location: Gunma Prefecture ■ Date of Construction: July 2020 (Reiwa 2) ■ Area: 400m² ■ Soil Type: Rock and Gravel *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where "rockfall protection nets (cover type/pocket type)" were installed during the slope repair and maintenance work on the municipal road Wakamikko - Shimokurosawa line. This project was commissioned by the Hokuto City Hall in Yamanashi Prefecture and was carried out in Yamanashi Prefecture. The area covered was 3,500 m², aimed at rockfall countermeasures and prevention. The method used (cover type) involves securing loose stones and rolling stones with wire mesh and wire ropes, thereby preventing rockfall within the mesh in advance. 【Case Overview】 ■ Project Name: Slope Repair and Maintenance Work on Municipal Road Wakamikko - Shimokurosawa Line ■ Location: Yamanashi Prefecture ■ Construction Date: October 2022 (Year 4 of Reiwa) ■ Area: 3,500 m² ■ Purpose: Rockfall countermeasures and prevention *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where "rockfall protection nets (cover type/pocket type)" were installed during the reconstruction work of National Route 136. This project was commissioned by the Shimoda Civil Engineering Office in Shizuoka Prefecture and was carried out in Shizuoka Prefecture. The quantity was 1,150 m², and the purpose was rockfall countermeasures and prevention. The method used (pocket type) involves installing openings with H-shaped supports at the top of the wire mesh to catch falling rocks from the upper source within the mesh. 【Case Overview】 ■ Project Name: Reconstruction Work of National Route 136 ■ Location: Shizuoka Prefecture ■ Construction Date: February 2021 (Year 3 of Reiwa) ■ Quantity: 1,150 m² ■ Purpose: Rockfall countermeasures and prevention *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case of "rockfall protection netting (cover type/pocket type)" installed during the slope work on the Kōbikumi-hama Line. This project was commissioned by the Toyooka Civil Engineering Office in Hyogo Prefecture and was carried out in Hyogo Prefecture. The quantity is 950m², and its purpose is rockfall prevention and mitigation. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Project Name: Slope Work on the Kōbikumi-hama Line ■ Location: Hyogo Prefecture ■ Construction Date: August 2021 (Year 3 of Reiwa) ■ Quantity: 950m² ■ Purpose: Rockfall prevention and mitigation *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an introduction to a case where the rockfall prevention rope installation "Tezak Super Lock (G-spec)" was implemented in restoration and erosion control work. The project was commissioned by the Higashi-yo Regional Bureau of Ehime Prefecture and carried out in Ehime Prefecture. It involved securing scattered rockfall sources and preventing the occurrence of new rolling stones and floating stones due to surface erosion. The accompanying erosion control mat is designed to protect the surface layer over the long term, combining erosion prevention effects with a foundation for plant growth. 【Case Overview】 ■ Project Name: Restoration and Erosion Control Work ■ Location: Ehime Prefecture ■ Date of Construction: 2020 (R2) ■ Area: 700 m² ■ Purpose: Rockfall countermeasures and prevention *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where the rockfall prevention rope installation "Teza Super Lock (G-spec)" was carried out as part of the Hiji River levee maintenance work. This was ordered by the Ozu River National Highway Office of the Shikoku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism. The construction site is in Ehime Prefecture, with a quantity of 150m². In this method, the necessary machinery consists mainly of a hand hammer and an air compressor, allowing for construction even in difficult-to-access areas such as behind private homes or on mountain slopes. 【Case Overview】 ■ Project Name: Hiji River Levee Maintenance Work ■ Construction Location: Ehime Prefecture ■ Construction Date: 2019 (Reiwa 1) ■ Quantity: 150m² ■ Purpose: Rockfall countermeasures and prevention *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is an introduction to a case where the rockfall prevention rope installation "Teza Super Lock (net type)" was implemented as part of the rockfall countermeasure construction at Minoo Park. The project was commissioned by the Ikeda Civil Engineering Office in Osaka Prefecture and carried out in Osaka Prefecture. The purpose is rockfall countermeasures and prevention, with a quantity of 70m². This method suppresses the initial movement of loose stones and floating rocks scattered on the slope through the restraining and supporting power of flexible wire ropes and anchors. 【Case Overview】 ■ Project Name: Minoo Park Rockfall Countermeasure Construction ■ Location: Osaka Prefecture ■ Construction Date: 2023 (R5) ■ Quantity: 70m² ■ Purpose: Rockfall Countermeasures and Prevention *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where the "Tezak Super Lock (net type)" was installed as a rockfall prevention rope work in the emergency response construction for the Wazuka Ide Line disaster prevention and safety grant. This project was commissioned by the Yamashiro North Civil Engineering Office in Kyoto Prefecture and was carried out in Kyoto Prefecture. The area covered is 600m2, and its purpose is rockfall countermeasures and prevention. This method involves installing wire ropes at 50cm intervals as auxiliary materials and is applicable to rock slopes that are at risk of floating stones and rolling stones. 【Case Overview】 ■ Project Name: Wazuka Ide Line Disaster Prevention and Safety Grant Emergency Response Construction ■ Location: Kyoto Prefecture ■ Construction Date: 2021 (Year 3 of Reiwa) ■ Area: 600m2 ■ Purpose: Rockfall countermeasures and prevention *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationIn the fiscal year 2018 (H30), we would like to introduce a case where the "Tafutafu Park 55," a type of green parking method installed on pavement, was implemented in the greening project of a private factory employee parking lot. The existing asphalt was excavated by 55mm, and our product was embedded. Due to the limited number of parking spaces for employees, the project was divided into sections to ensure that employee parking could be maintained during construction. Please feel free to contact us if you have any inquiries. [Case Overview] ■ Project Name: 2018 (H30) Fiscal Year Private Factory Employee Parking Lot Greening Project ■ Location: Hyogo Prefecture ■ Construction Date: March 2019 (R1) ■ Area: 400m2 ■ Purpose: Parking Lot *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationIn the fiscal year 2022 (R4), we would like to introduce a case where the "Tafutafu Park 55" green parking method was implemented in the greening construction of a private factory employee parking lot. This method was adopted because it minimizes the removal of existing asphalt and can be constructed without affecting the operational factory. We excavated 55mm of the existing asphalt and installed our product. This method does not require the stripping of existing pavement such as asphalt or earthworks, allowing for a reduction in removal and disposal costs. 【Case Overview】 ■ Project Name: 2022 (R4) Fiscal Year Private Factory Employee Parking Lot Greening Construction ■ Location: Osaka Prefecture ■ Construction Date: October 2022 (R4) ■ Area: 1330m2 ■ Purpose: Parking Lot *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationIn the 2020 fiscal year, we would like to introduce a case where the integrated base layer parking greening method "Tafutafu Park" was implemented in the greening work of a private factory employee parking lot. Due to the construction of a new building on the site, there was a shortage of green space, so the employee parking lot was greened. With limited yard space on the site, we were able to carry out the work in small batches without affecting the factory's operations. 【Case Overview】 ■ Project Name: 2020 Fiscal Year Private Factory Employee Parking Lot Greening Work ■ Location: Osaka Prefecture ■ Construction Date: December 2020 ■ Area: 2085m2 ■ Purpose: Parking Lot *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is a case study of the installation of the grass-covered geotextile "Grit Saver" at the Hiji River embankment construction in the Suda area. The project was commissioned by the Ozu Civil Engineering Office and carried out in Ehime Prefecture. The product was installed in areas with a flow velocity of 3 to 5 m/s, which were previously unembanked. This method allows for the completion of both bank protection and greening work in a single process, thereby shortening the construction period. [Case Overview] ■ Project Name: Hiji River Embankment Construction, Suda Area ■ Location: Ehime Prefecture ■ Construction Date: July 2023 (Year 5 of Reiwa) ■ Quantity: 4,400 m² ■ Purpose: Other *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationIn the fiscal year 2017 (H29), we would like to introduce a case where the durable pressure-resistant turf protection mat "Tough Tough Guard" was installed at Yokomichi Park. This project was commissioned by the Nagakute City Hall and carried out in Aichi Prefecture. Turf protection material was installed simultaneously with the turf construction around the playground equipment. Please feel free to contact us when you need our services. 【Case Overview】 ■ Project Name: Yokomichi Park in the fiscal year 2017 (H29) ■ Location: Aichi Prefecture ■ Construction Date: March 2018 (H30) ■ Area: 340m2 ■ Purpose: Turf plaza *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationIn the 2020 fiscal year, we would like to introduce a case where "Tafutafu Park" was constructed at the parking lot of the Kusatsu City No. 2 School Lunch Center. This project was commissioned by the Kusatsu City Hall and carried out in Shiga Prefecture. The area covered was 415 m². This method allows grass roots to extend into the sub-base layer (crushed stone layer), enabling recovery even if the surface of the grass is damaged. 【Case Overview】 ■ Project Name: 2020 Fiscal Year Kusatsu City No. 2 School Lunch Center Parking Lot ■ Location: Shiga Prefecture ■ Construction Date: February 2021 ■ Area: 415 m² ■ Purpose: Parking Lot *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationIn the 2022 (R4) fiscal year, we would like to introduce a case where the integrated pavement layer parking lot greening method "Tafutafu Park" was implemented at the Gifu Prefectural Office parking lot construction project. This was developed in conjunction with the new main building. Due to the high frequency of use, we are maintaining the grass by avoiding construction under the engine area. In this method, the pavement layer (crushed stone layer) temporarily stores rainwater and allows it to slowly permeate into the ground. 【Case Overview】 ■ Project Name: 2022 (R4) Gifu Prefectural Office Parking Lot Construction Project ■ Location: Gifu Prefecture ■ Construction Date: March 2022 (R4) ■ Area: 1,040 m² ■ Purpose: Parking lot *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationIn the 2014 fiscal year, we would like to introduce a case where the pressure-resistant green space greening method "Grass Strong" was implemented at the Andersen Park dog run. This product was chosen because it is resilient to stress from urine and feces, as well as foot traffic. Its safety due to the absence of protrusions on the surface and the ability to prevent excavation with the GS net also make it suitable for dog runs. 【Case Overview】 ■ Project Name: 2014 Andersen Park Dog Run ■ Location: Chiba Prefecture ■ Construction Date: February 2014 ■ Area: 3,100 m² ■ Purpose: Park *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the pressure-resistant green space construction method "Grass Strong" implemented at the Chiba Park Interaction Square. This project was commissioned by the Mito City Hall and carried out in Ibaraki Prefecture. The area covered was 2110 m², aimed at creating a grass square. This method features a structure that secures the root growth layer, preventing compaction due to foot traffic, and allows for a grass square that is free of protrusions, making it accessible for both people and vehicles. 【Case Overview】 ■ Project Name: 2019 (R1) Year Chiba Park Interaction Square ■ Location: Ibaraki Prefecture ■ Construction Date: December 2019 (R1) ■ Area: 2110 m² ■ Purpose: Grass Square *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case of the pressure-resistant green space greening method "Grass Strong" implemented at the Tondabayashi Park lawn area, which also serves as a temporary parking lot. This project was commissioned by the Kishiwada Civil Engineering Office and carried out in Osaka Prefecture. During events, white lines are drawn to designate parking spaces. This method allows the lawn area to be used as a space accessible to people and vehicles, with no protrusions on the surface. 【Case Overview】 ■ Project Name: 2018 (H30) Tondabayashi Park Lawn Area and Temporary Parking Lot ■ Location: Osaka Prefecture ■ Construction Date: March 2018 (H30) ■ Area: 5,100 m² ■ Purpose: Lawn Area *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where stress-resistant large-net natural grass "Kyoriyokker 21" was installed at the Kochi New Port elevated green space development. This site was chosen for its good scenery and resistance to salt damage, as it is a port where passenger ships dock. It was developed as a tsunami evacuation elevated area for those working nearby. This construction method is strong against stress such as salt damage and dryness, and the large shape improves workability. 【Case Overview】 ■ Project Name: Kochi New Port Elevated Green Space Development ■ Location: Kochi Prefecture ■ Construction Date: November 2016 (H28) ■ Area: 20,000 m² ■ Purpose: Disaster prevention facility *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where the large netted lawn "Kyoriyokker 21" with stress resistance was installed at Kogota Park. This project was commissioned by the Okazaki City Hall and carried out in Aichi Prefecture. The park is frequently used, hosting events every weekend. This construction method improves workability with its large shape and is resistant to stress from salt damage, dryness, and other factors. Please feel free to contact us if you need our services. 【Case Overview】 ■ Project Name: Kogota Park 2019 (R1) Fiscal Year ■ Location: Aichi Prefecture ■ Construction Date: June 2019 (R1) ■ Area: 2800 m² ■ Purpose: Lawn Plaza *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where we installed a large stress-resistant net with natural grass, 'Kyoryokka 21', as part of the development of parks related to Ghibli Park. We constructed a lawn area in front of the Ghibli Warehouse using Tifton grass. During events, many people set up tents and enjoy the space, making it a place of relaxation. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Project Name: 2022 (R4) Ghibli Park Related Park Development ■ Location: Aichi Prefecture ■ Construction Date: September 2022 (R4) ■ Area: 1675 m2 ■ Purpose: Lawn area *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Ring Unit Type Rockfall Prevention Method" is a technique that processes wire ropes into a ring shape and connects multiple units to prevent rockfalls. We offer a lineup of "Ring Rope" for rope laying works and "Ring Cover" for rope covering works. During the sliding of rockfalls, the unit with a connected ring structure disperses stress, preventing excessive load from concentrating on a single wire rope. 【Features】 ■ Excellent transportability of materials ■ Stress is distributed throughout ■ Reduces dangerous work on site *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Slope Failure Countermeasure Ground Reinforcement Soil Method" is a technique that primarily reinforces slopes through tensile force by inserting numerous rock bolts into the ground. Field tests were conducted under conditions where ground collapse did not precede. Bolt loads in the range of 150 to 155 kN were observed, and pull-out of the reinforcement bolts was noted; however, no deformation such as destruction or breakage of the hold plates and wire ropes was confirmed. 【Design Considerations】 ■ Stability calculations for the slope ■ Calculation of necessary restraining forces ■ Assumptions for reinforcement material placement ■ Design of slope construction ■ Examination of stability ■ Completion of structural calculations *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce the "Rockfall Disaster Prevention and Mitigation Method" handled by Nippon Vegetation Co., Ltd. The initial movement of floating and rolling stones is suppressed by the restraining and supporting force of the grid-like wire rope and anchors. The design of the Eagle Hold divides the ground into areas requiring soil reinforcement and areas requiring rockfall prevention, and structural calculations are performed for each section according to conventional standards. 【Design Considerations】 ■ Determination of rockfall load ■ Design of materials used ■ Calculation of allowable load for materials ■ Calculation of acting loads ■ Examination of stability ■ Completion of structural calculations *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration"Log Work" is a frame that can be easily constructed by connecting thinned wood round bars with +・T・L type joints. Frames can be constructed at 1-meter intervals with 900mm round bars and at 2-meter intervals with 1,900mm round bars. By adopting joints that maintain strength while providing flexibility, it can easily accommodate construction sites with curves. 【Specifications】 ■ Material: Thinned wood (preservative treatment) ■ Diameter: 80mm ■ Length - 900mm (1m interval frame) - 1,900mm (2m interval frame) *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Ring Cover Method" involves covering a ring unit with rock mass and connecting it to fixed anchors around it, thereby restraining rocks that have lost their connection to the ground through the intersection strength of the ring unit and the support capacity of the anchors. Anchors can be installed at any position and in any number. Since anchors or pins are not driven into unstable rock masses, there is no risk of crack formation, deformation, or movement, allowing for safe construction. 【Features】 ■ Allows for the collective covering of overlapping rock masses ■ Does not depend on the shape of the rock mass ■ The allowable load increases as the rock mass becomes elongated ■ Does not depend on the angle with the installation ground ■ Excellent transportability of materials *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce the "Follow-Up Sheet 2 <Weed Control and Planting>" handled by Nippon Vegetation Co., Ltd. This is a weed control and planting sheet that shuts out light and suppresses the growth of weeds, made from polypropylene woven fabric and polyester non-woven fabric. By using it in conjunction with planting, you can also introduce the desired plants. Please feel free to consult us when you need assistance. 【Specifications】 ■ Thickness: 1.0mm ■ Width: 1m, 2m ■ Length: 25m *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration"Nipura" features a mesh-like water absorption structure, allowing not only rainwater on the surface but also infiltrated water and spring water to be collected through the absorption holes and quickly drained away at the bottom of the frame. To prevent deterioration from direct sunlight and ultraviolet rays, it uses high-density black polyethylene with excellent weather resistance. It has a robust hollow square design with thick walls. Additionally, the use of flexible joints maintains strength while allowing easy adaptation to curved construction sites. 【Features】 ■ Excellent collection and drainage capacity ■ Outstanding weather resistance ■ High adaptability for construction ■ Achieves landscape greening simultaneously when used in conjunction with vegetation work *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce "Bank Master," handled by Nippon Shokusei Co., Ltd. The specifications are as follows: height (width) of 10 cm, length of one side 20 cm, and dimensions after expansion of 12 m in height and 12.5 m in width. Made from semi-rigid material, it offers excellent flexibility and can be installed according to the site conditions. Additionally, it prevents the movement of surface soil on slopes and improves water retention. 【Specifications】 ■ Height (width): 10 cm ■ Length of one side: 20 cm ■ Dimensions after expansion: 12 m in height × 12.5 m in width *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce the "Nazim Bag" handled by Nippon Vegetation Co., Ltd. It is a sandbag made of palm fibers that blends well with the landscape and can also be used for vegetation works utilizing forest topsoil, etc. Please feel free to consult us when you need assistance. 【Specifications】 ■ Standards - Width: 40cm - Length: 60cm ■ Quantity: 50 pieces per package *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce the "Follow-Up Sheet 1 <For Strong Weed Control>" handled by Nippon Vegetation Co., Ltd. The material is polyester non-woven fabric + high-density polyester long fiber non-woven fabric, available in green color, with quantities of 25m² and 50m² per roll. The high-density sheet effectively suppresses the growth of vigorous and stubborn weeds. Please feel free to consult us when you need assistance. 【Specifications】 ■ Thickness: 1.8mm ■ Width: 1m, 2m ■ Length: 25m *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce the "Grigen Rod" handled by Nippon Shokusei Co., Ltd. This material is made from coconut fibers and can be used for various purposes, including preventing soil erosion, providing a growth foundation for plants, and as a drainage material. We offer two different specifications: "GR700-100" and "GR700-150." Please feel free to consult with us when you need them. 【GR700-100 Specifications】 ■ Shape: Roll ■ Specifications ・ Diameter: Approximately φ100–120mm ・ Length: 1m ■ Packaging: 25 pieces *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce the "Gengoro Net" handled by Nippon Shokusei Co., Ltd. This is a net woven from palm fibers, which can be used for preventing erosion on slopes and other applications. The width is 1m, length is 15m, and the quantity is 15m² per roll. Please feel free to consult with us when you need it. 【Specifications】 ■ Standards - Width: 1m - Length: 15m ■ Quantity: 15m² per roll *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce the bagged soil material "Naekichi," handled by Nippon Shokusei Co., Ltd. It allows for planting seedlings and ground cover in areas where planting is difficult, such as cut slopes, within retaining walls, and rocky fill areas. Additionally, it enables natural restoration greening using local seed varieties. Please feel free to consult with us when you need assistance. 【Construction Steps】 ■1. Installation ■2. Planting (Tear off the protective paper from the central opening and plant the seedlings) ■3. Watering ■4. Finishing ■5. Completion *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce the "Grigen Sheet" handled by Nippon Shokusei Co., Ltd. It is a sheet made of palm fibers, used for erosion prevention on adhesive surfaces and as a measure for spring water treatment, available in two variations: "HP-300" and "HP-650," differing in length and weight. Since it is made from natural materials, it will return to nature. Please feel free to consult us when you need it. 【HP-300 Specifications】 ■ Color: Green ■ Length: 1×20m/roll ■ Weight: 300g/m2 ■ Remarks: For general civil engineering use *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce the slope support material "Ring Anchor" handled by Nippon Vegetation Co., Ltd. This anchor is lightweight, has a ring-shaped processing on the body, and is strong against pulling out. It offers excellent workability. You can install vegetation mats and vegetation substrate mats without needing to differentiate between anchors. Since you can use one type of anchor for both vegetation mats and vegetation substrate mats, it makes: - Calculating the required quantity easy - Arranging materials easy - The only anchor to carry in your waist pouch is the ring anchor - Installation easy The specifications are φ7×200mm, with a quantity of 200 pieces per box, and each box weighs approximately 12kg. Please feel free to consult us when you need assistance. 【Specifications】 ■ Size: φ7×200mm ■ Quantity: 200 pieces/box ■ Remarks: Approximately 12kg/box *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce "Bioroll," a product handled by Nippon Shokusei Co., Ltd. It is a material made from coconut fibers processed into a roll shape. It creates a water-side environment in harmony with nature and blends well with the surrounding environment. We offer diameters of 30 cm and 50 cm (made to order). Please feel free to consult us when you need to place an order. 【Product Lineup】 ■φ30 ■φ50 *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Tezak Super Lock Close-Type" is a construction method applicable to complex slopes where there is a risk of floating and rolling rockfalls, and where soil and gravel are interposed in the bedrock. By having a flexible thick wire mesh closely adhere to the ground, it suppresses the erosion of gravel and soil. As erosion is reduced by the thick wire mesh, an environment is created that allows seeds from surrounding vegetation to take root, promoting the restoration of the landscape in line with the surrounding vegetation conditions. 【Features】 ■ Prevention of erosion of accumulated soil ■ Promotion of natural invasion effects *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce the slope support material "E-Pin" handled by Nippon Vegetation Co., Ltd. It is a biodegradable pin made from a mixture of natural materials, with polylactic acid as the main component. It is suitable for securing biodegradable vegetation mats and similar products. We offer lengths of 15 cm and 20 cm. Please feel free to consult us when you need to place an order. 【Product Lineup】 ■ Length 15 cm (1000 pieces per box) ■ Length 20 cm (200 pieces per box) *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration