Connection Method
Connecting buildings that were separated! You can make effective use of dead space within the site.
The "Connection Construction Method" involves constructing a new building (or an extension) that aligns with the floor level of two existing buildings that are separated by a gap, thereby integrating (linking) the previously disconnected structures. This method allows for the effective use of dead space within the site, enabling operations to continue without being affected by weather conditions when moving between factories. Furthermore, the creation of new pathways in what were originally separate buildings can lead to improvements in productivity and smoother production lines. 【Features】 ■ Integration (linking) of previously disconnected buildings ■ Effective use of dead space within the site ■ Operations can continue without being affected by weather conditions when moving between factories ■ Potential for improvements in productivity and smoother production lines *For more details, please refer to the PDF document or feel free to contact us.
- Company:ヨシザワ建築構造設計
- Price:Other