[Construction Case] Packaging Material Factory: Floor Slab Settlement Correction Work

To a factory producing packaging materials such as cardboard! Introducing examples of subsidence correction work.

Here is a case study of "floor sinking correction work" conducted at a packaging material factory in South Korea. With ground subsidence, the concrete floor also sank, causing the stacked cardboard and other materials in the factory to tilt, which hindered operations. We performed polyurethane resin injection work, continuously checking the level while correcting the subsidence. The correction was completed in 4 days using one construction plant vehicle. 【Case Overview】 ■ Construction Area: Approximately 360m2 ■ Location: Incheon, South Korea ■ Construction Period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] New Factory Established on Warehouse Site: Floor Slab Settlement Correction Work and Step Level Correction Work

Improving the causes of the step and puddles at the entrance of the old warehouse! Correcting without replacing the floor.

We would like to introduce a case of "floor sinking correction work and step correction work" conducted at the site of a warehouse in a factory located in Chiba Prefecture. We considered using it as a new factory. Without replacing the floor, we adopted the Upcon method, which allows for quick corrections, and carried out the construction. Before the construction, there was a step of about 80mm at the factory entrance, but it was resolved after the work. If you have any issues with the concrete floor in your factory, please feel free to contact us. 【Case Overview】 ■ Construction Area: 660m2 ■ Maximum Sinking Amount: Approximately 110mm ■ Area: Chiba Prefecture ■ Construction Period: 5 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Precision Machinery Factory: Floor Slab Settlement Correction Work

A case of correcting the subsidence, gaps, and voids under the factory's earthen floor in just two days during the factory's holiday!

We would like to introduce a case of "floor slab settlement correction work" and "floor slab void filling work" carried out at a precision machinery factory in Kagoshima Prefecture. There were voids and cavities of about 30 to 40 mm beneath the factory's floor slab, and due to the settlement of the floor along with the columnar improvement, a request for correction was made to Upcon. The construction was completed over two days during the factory's weekend break. After the work was finished, we received a thank-you email from the customer stating, "It was successfully lifted, and I was moved." 【Case Overview】 ■ Construction Area: Approximately 480 m2 ■ Maximum Settlement Amount: 41 mm ■ Maximum Void Amount: 35 mm ■ Area: Kagoshima Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Precision Parts Factory: Floor Slab Settlement Correction Work

Settlement of up to 50mm in the concrete floor! A case where the existing concrete floor was corrected in one day without breaking it.

Here is a case study of "floor slab subsidence correction work" conducted at a precision parts factory in Shizuoka Prefecture. The factory's floor slab had subsided by a maximum of 50mm, with a correction area of approximately 81m2. The construction period was one day. The injection work was carried out while checking the height with a laser level, and after the resin injection, the filling confirmation was performed using a CCD camera. 【Case Overview】 ■ Construction Area: Approximately 81m2 ■ Maximum Subsidence: 50mm ■ Area: Shizuoka Prefecture ■ Construction Period: 1 day *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Parts Assembly Factory: Floor Slab Settlement Correction Work

Due to the sinking of the floor, work was hindered! Here is an example of a case where corrections were made in a short period without stopping operations.

Here is an example of "floor sinking correction work" carried out at a parts assembly factory in Fukuoka Prefecture. Due to the sinking, the floor was slanted, making it difficult to adjust the jacks during conveyor assembly. As a result of the construction, we were able to improve the situation to the point where assembly work could be carried out smoothly. 【Case Overview】 ■Issue - The floor was slanted due to sinking, making jack adjustments during conveyor assembly cumbersome. ■Result - The situation was improved to the point where assembly work could be carried out smoothly. *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Food Factory Second Floor: Settlement Correction Work and Unevenness Correction Work

Correction of unevenness and settlement on a floor with a special structure! Resolving issues with cart operations caused by unevenness.

We would like to introduce a case of "settlement correction work and unevenness correction work" carried out on the second-floor floor of a food factory located in Kanagawa Prefecture. Unevenness occurred in the floor panels of the refrigerated room, hindering the movement of carts transporting goods, and the floor panels were being held down with anchors to suppress the unevenness. After the construction, the settlement in front of the entrance was resolved, and the floor panels' floating issue was also eliminated by filling the urethane layer with new urethane. 【Case Overview】 ■ Construction Area: 46.17m² ■ Maximum Settlement Amount: 42mm ■ Void Amount: 46.17 ■ Area: Kanagawa Prefecture ■ Construction Period: 4 days (including ancillary work) *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Logistics Center: Outdoor Concrete Floor Settlement Correction / Underfloor Void Filling Work

Correction of the deflection in the slope section! A case where it was possible to adjust to a straight slope without any discomfort.

We would like to introduce a case of "outdoor concrete floor settlement correction" and "underfloor void filling work" carried out at a logistics center in Okayama Prefecture. The sloped area at the building entrance was sagging due to ground subsidence, so we adopted the Upcon method, which allows for quick correction of the sagging to avoid disrupting normal operations. After construction, we were able to almost eliminate the sagging in the center and correct it to a straight slope that feels natural. 【Case Overview】 ■ Construction Area: Approximately 410m2 ■ Maximum Settlement: 93mm ■ Maximum Void: 150mm ■ Area: Logistics center located in Okayama Prefecture ■ Construction Period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Distribution Station: Floor Slab Settlement Correction / Underfloor Void Filling Work

Due to the extensive area of the repairs, the construction was carried out in several phases!

We would like to introduce a case of "floor sinking correction" and "underfloor void filling work" carried out at a distribution station of a product manufacturer located in Niigata Prefecture. Due to consolidation settlement, various areas within the station exhibited sinking and sagging, prompting the adoption of the Upcon method, which allows for quick corrections. Since the area requiring correction was extensive, we utilized weekends during business shutdowns to divide the construction period and carry out the work. 【Case Overview】 ■ Construction Area: Approximately 1,460m2 ■ Maximum Settlement Amount: 103mm ■ Maximum Void Amount: 90mm ■ Area: Distribution station of a product manufacturer located in Niigata Prefecture ■ Construction Period: 8 working days (Note: The construction was carried out in several phases) *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Large Product Storage Warehouse: Floor Slab Settlement Correction Work / Construction in 2010

Adopting the up-con method for short-term intensive repairs! Construction carried out with compatibility for multiple plant vehicles.

We would like to introduce a case of "floor sinking correction work" conducted at a large product storage warehouse in Ibaraki Prefecture. Due to the effects of ground subsidence, the stacked cardboard boxes were leaning. For concentrated repairs over a short period, the Upcon method was adopted, and our company carried out the work with multiple plant vehicles. 【Case Overview】 ■ Construction Area: Approximately 2,000m2 ■ Maximum Subsidence: 110mm ■ Location: Large product storage warehouse in Ibaraki Prefecture ■ Construction Period: 6 days (Day 1: 4 vehicles, Days 2-6: 2 vehicles for construction) *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Supermarket: Floor Deflection Correction / Settlement Correction Work

Correction during nighttime while business is suspended! A case of correcting floor sag due to ground subsidence in a short construction period.

We would like to introduce a case of "floor deflection correction" and "subsidence correction work" carried out at a certain supermarket in Ibaraki Prefecture. In this case, the customer was troubled by the floor inside the store being deflected due to subsidence. Using the Upcon method, the work was conducted only at night, with minimal impact on business. The construction was completed in a short period of 2 days without any store closure. 【Case Overview】 ■ Construction Area: Approximately 450m2 ■ Maximum Subsidence: Approximately 83mm ■ Area: Ibaraki Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Game Center: Earthquake Recovery Work / Floor Slab Settlement Correction Work

Due to the impact of the China-Vietnam earthquake, part of the floor inside the store has sunk! Case study of subsidence correction work at the game center.

We would like to introduce a case where "disaster recovery work" and "floor sinking correction work" were carried out at a game center located along a national highway in Niigata Prefecture. In this case, part of the floor inside the store sank due to the impact of the Chuetsu earthquake. Therefore, the company was requested to correct the sinking because it could be done in a short period of time. The sinking correction was performed using the Upcon method with rigid polyurethane foam. The work was completed in one day. 【Case Overview】 ■ Area of sinking correction: Approximately 83m2 ■ Maximum sinking amount: -77mm ■ Planned correction value: Within 16mm ■ Area: Niigata Prefecture ■ Construction period: 1 day *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Drugstore: Settlement Repair Work (Niigata Prefecture)

Floor sagging due to ground subsidence! A case of straightening the floor before store renovation.

Here is an example of "settlement correction work" carried out at a drugstore in Niigata Prefecture. In this case, the store's floor had sagged due to settlement. At the time of the store renovation, they wanted to correct the floor to be level, so they chose our Upcon method. The construction area was approximately 1500m2. Using the concrete replacement method, a project that typically takes one month was completed in just four days. (Settlement amount approximately 100mm) 【Case Summary】 ■ Construction Area: Approximately 1500m2 ■ Maximum Settlement Amount: Approximately 100mm ■ Area: Drugstore in Niigata Prefecture ■ Construction Period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Toy Retail Store / Electronics Retail Store: Earthquake Recovery / Floor Slab Settlement Correction Work

Due to the impact of the Great East Japan Earthquake, the floor inside the store has significantly sunk! There have been cases where gaps have formed between the floor and the walls, as well as between the walls and the ceiling.

This is a case study of "disaster recovery construction" and "floor sinking correction work" conducted at a toy retail store and an electronics retail store in Fukushima Prefecture. Due to the impact of the Great East Japan Earthquake, the floor inside the toy retail store sank significantly. As a result of the floor sinking, gaps were observed between the floor and walls, as well as between the walls and ceiling. To address this, an up-con method that could be implemented during nighttime while the store was closed was adopted, and our company carried out the correction work. Additionally, since voids were also observed beneath the floor, void filling work was conducted by injecting polyurethane resin into the gaps. [Case Overview] ■ Construction Area: Approximately 2,300m2 ■ Maximum Sinking Amount: 144mm ■ Area: Fukushima Prefecture ■ Construction Period: Continuous 11 nights (2012) *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Shopping Center: Subfloor Settlement Correction Work

Due to consolidation settlement, the floor has sunk extensively within the store! A gap has occurred between the floor and the wall.

We would like to introduce a case of "subfloor sinking correction work" and "subfloor void filling work" carried out at a shopping center in Iwate Prefecture. Due to consolidation settlement, sinking was observed over a wide area of the floor. As a result of the floor sinking, gaps appeared between the floor and walls, causing various issues throughout the store. An Upcon method that could be corrected during nighttime while the store was closed was adopted, and our company carried out the corrections. Additionally, as voids and cavities were also observed under the floor, void filling work using urethane was conducted. [Case Overview] ■ Construction Area: Approximately 540m2 ■ Maximum Settlement Amount: 71mm ■ Maximum Void Amount: 190mm ■ Area: Iwate Prefecture ■ Construction Period: Continuous 7 nights *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Supermarket: Subfloor Settlement Correction Work (Gifu Prefecture)

Floor subsidence due to weak ground! Introducing a case where repairs were made during nighttime while the business was closed.

We would like to introduce a case of "subfloor sinking correction work" carried out at a large supermarket located in Gifu Prefecture. Most of the backroom and store area had sunk, causing gaps between the floor and walls due to the floor sinking, resulting in various issues throughout the store. An Upcon method that can be corrected during nighttime while the store is closed was adopted, and the correction was carried out by our company. 【Case Overview】 ■ Construction Area: Approximately 700m2 ■ Maximum Sinking Amount: 85mm ■ Area: Gifu Prefecture ■ Construction Period: Continuous 5 nights (2013) *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration