Water treatment equipment Product List and Ranking from 43 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 24, 2025~Oct 21, 2025
This ranking is based on the number of page views on our site.

Water treatment equipment Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 24, 2025~Oct 21, 2025
This ranking is based on the number of page views on our site.

  1. サンエー工業 Tokyo//Facility Design Office
  2. 富士計器 本社 Hokkaido//Electricity, Gas and Water Industry
  3. ヴァンテック Tokyo//Building materials, supplies and fixtures manufacturers
  4. 流機エンジニアリング 本社 Tokyo//Building Management
  5. 5 エコサイクル Tokyo//Building Management

Water treatment equipment Product ranking

Last Updated: Aggregation Period:Sep 24, 2025~Oct 21, 2025
This ranking is based on the number of page views on our site.

  1. Vantech Pipe Comprehensive Catalog ヴァンテック
  2. Multi-pole magnetic field far-infrared water treatment device "Thunder System" 富士計器 本社
  3. Coagulation Aid "Aqua Lite" エコサイクル
  4. 4 High-precision adsorption water treatment device effective against PFAS: ECO Clean LFP 流機エンジニアリング 本社
  5. 5 Reference material on the relationship between surface area load and thickener capacity in wastewater treatment. サンエー工業

Water treatment equipment Product List

241~255 item / All 438 items

Displayed results

Red water countermeasures (18 years after construction, 85 households) [Magnetic water treatment device Vol. 5]

A Polar model PI-50CF is installed with a complete set of dedicated pump for independent circulation in a 40m3 water receiving tank!

The S.S. Heights in Shimizu, Shizuoka City, has reached nearly 20 years since its construction, so we installed a polarizer for the purpose of countering red water (protecting the water supply pipes). One month after installation, there was a slight outflow of rust (rust leaching action) within the pipes, causing the iron content to rise from 0.04 to 0.16. Three months later, it decreased to 0.13, and after six months, it returned to 0.04, demonstrating an exceptionally long-lasting rust prevention effect. 【Case Study】 ■ Installation Date: October 16, 2002 ■ Installation Location: S.S. Heights in Shimizu, Shizuoka City (85 households) ■ Model: Polarizer Magnetic Water Treatment Device PI-50CF (Connection Diameter 50A) ■ Installation Method: Installed in an independent circulation system with a dedicated circulation pump in the water storage tank ■ Installation Details: 85 households, 18 years since construction, water storage tank (effective 40m3) ■ Purpose: Corrosion prevention to suppress aging of the water supply pipes *For more details, please refer to the PDF document or feel free to contact us.

  • Housing structure technology/long-term superior housing technology

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Corrosion prevention effect of newly built air conditioning chilled and hot water【Magnetic Water Treatment Device Vol.5】

The iron content of the treated hot and cold water has decreased from 0.15 to below 0.05, which is a reduction of one third!

At the headers of the cooling and heating water system of Fukui Prefectural Hospital, a polar magnetic water treatment device was installed along with a dedicated circulation pump, and the circulating water was treated using a partial draw-off method. As a result, significant improvements in water quality were achieved for the hot water system, with pH and silica levels showing marked enhancement, and the Langelier index rising from -1.9 (highly corrosive) to +0.9 (non-corrosive). The cold water system also showed significant improvements in water quality, with the Langelier index changing from -1.9 (highly corrosive) to -0.2 (very slight corrosion). However, the iron content in both the treated hot and cold water decreased from 0.15 to below 0.05, a reduction of one-third, indicating that the risk of corrosion is negligible. [Case Study] ■ Installation Location: Headers of the cooling and heating water system of Fukui Prefectural Hospital ■ Polar Model - For cold water system: Model PI-50CF × 1 set (Trial operation on November 1, 2003) - For hot water system: Model PI-50CF × 1 set (Trial operation on November 1, 2003) (Size selection was carried out by our company) *For more details, please refer to the PDF document or feel free to contact us.

  • Housing structure technology/long-term superior housing technology

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Polar Technology Case Study] Confirmation of anti-corrosion effect on air conditioning chilled and hot water pipes after 17 years and 5 months.

The remaining lifespan of the cold and warm water pipes is estimated to be over 20 years! Thanks to Polar's rust prevention, there are no rust lumps on the inner surface of the pipes.

We would like to introduce a case where the anti-corrosion effect was confirmed on air conditioning chilled and hot water pipes 17 years and 5 months after polar treatment. Due to the anti-corrosion action of the polar treatment, there are no rust lumps on the inner surface of the pipes, which are covered by an extremely thin, dense, and uniform anti-corrosion film that has absorbed minerals. This film prevents the reaction (corrosion) between oxygen in the water and iron, thus providing corrosion protection. [Case Study] ■ Location: A certain major home improvement center ■ Installation Date: October 2002 (17 years and 5 months have passed since installation at the time of new construction) ■ Purpose: Anti-corrosion measures for newly installed air conditioning chilled and hot water equipment *For more details, please refer to the PDF document or feel free to contact us.

  • Water Treatment Plant

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sterilization Effect Test Report

Each bacterium was tested three times, and the average value was calculated for the bacterial count! The test results are clearly presented in a table.

This document introduces the antibacterial effects of using polarizers. A mixed solution of Staphylococcus aureus, Escherichia coli, and Legionella adjusted to approximately 1.0×10^5 CFU/ml was flowed into the polarizer, and the viable bacterial counts before and after were confirmed using culture methods. Each bacterium was tested three times, and the average value was taken as the bacterial count. The test results are presented in a table for clarity, so please take a look. [Contents] ■ Test Request Form ■ Test Sample Name ■ Test Purpose ■ Test Method ■ Test Results *For more details, please refer to the PDF document or feel free to contact us.

  • Housing structure technology/long-term superior housing technology

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Scale prevention and corrosion protection for cooling water systems [Magnetic Water Treatment Device Vol. 12]

Scale prevention and corrosion protection for cooling water systems! Installation of open cooling tower PI-150F (1 set) (1215 m3/h).

We would like to introduce a case of scale prevention and corrosion protection for cooling water systems at S Lightweight Metal Industry Co., Ltd. in Aichi Prefecture. On April 18, 1999, we installed a PI-150F (1 unit) open cooling tower (1215 m³/h). Photos of the installation are included in the PDF document. Please take a look. 【Case Details】 ■ User: S Lightweight Metal Industry Co., Ltd. (Aichi Prefecture) ■ Purpose: Scale prevention and corrosion protection for cooling water systems ■ Installation Date: April 18, 1999 ■ Model: PI-150F (1 unit) open cooling tower (1215 m³/h) *For more details, please refer to the PDF document or feel free to contact us.

  • Housing structure technology/long-term superior housing technology

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Red Water Countermeasures (27 years after construction, 271 households) [Magnetic Water Treatment Device Vol. 4]

Everyone is surprised by the speed of the results! Here’s an example where the red water stopped within about a week of installation.

The Nagoya City M Century Mansion has been in existence for 27 years, and red water started coming out of the taps. Therefore, the board of directors considered various methods for one year and decided to adopt the Polar system. Water was sampled and analyzed from the room next to the manager's office. The red water stopped within about a week of installation. Everyone was surprised by the quick results. 【Features】 ■ User Name: Nagoya City M Century Mansion (27 years old, 271 households) ■ Purpose: Red water countermeasures (2 tanks of 60t water storage + 1 tank of 30t elevated water storage) ■ Installation Date: January 25, 2001 ■ Polar Model: 2 units of PI-65 installed in an independent circulation system for each 60t water storage tank *For more details, please refer to the PDF document or feel free to contact us.

  • Housing structure technology/long-term superior housing technology

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Measures Against Red Water (2.5 Years After Construction) [Magnetic Water Treatment Device Vol. 8]

All analysis items are within drinking water quality standards! Cases demonstrating effects equivalent to those of chemical additives.

Tokyo Max Beauty College did not have red water at that time, but it was treated with chemicals as a future measure against red water. They discontinued that and installed a Polar system, which had been confirmed effective in other buildings, for the purpose of preventing red water. The water quality analysis report one month after installation showed that all analysis items were within drinking water quality standards. The iron content was also low, and the treatment by the Polar system demonstrated effects equivalent to the chemical treatment before the installation of this system. Future expectations include prevention of skin irritation. [Case Study] - Installation Location: Tokyo Max Gakuen Tokyo Max Beauty College (2.5 years after construction) - Installation Date: August 29, 2001 - Polar Model: PI-32CF (3-point set) complete set *For more details, please refer to the PDF document or feel free to contact us.

  • Housing structure technology/long-term superior housing technology

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Prevention Measures for Red Water (13 Years After Construction) [Magnetic Water Treatment Device Vol. 7]

Confirmed that the chromaticity has greatly improved! A case of installing the Polar model PI-25CF in a water storage tank.

The owner of the Sendai TM Building has experience spending tens of millions of yen on lining methods for red water measures in other buildings. Since this building has also been in use for 13 years, a cost-effective and reliable technology polarizer was installed as a red water measure. Water quality analysis after installation confirmed a significant improvement in color. [Case Study] ■ Installation Location: Tokyo Max Co., Ltd. Sendai TM Building [13 years after construction] ■ Installation Date: September 22, 2001 (Saturday) ■ Polarizer Model: PI-25CF (3-point set) *For more details, please refer to the PDF document or feel free to contact us.

  • Housing structure technology/long-term superior housing technology

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Red water countermeasures (13 years after construction, 30 households) [Magnetic water treatment device Vol. 6]

Adopting an independent circulation system! Installing PI-25CF (3-piece set) in a 13-year-old, 30-unit apartment building.

We would like to introduce a case of red water countermeasures implemented at East Side Palace T&T (a 30-unit condominium built 13 years ago) by Testa Corporation. We installed the PI-25CF (3-point set). We adopted an independent circulation method that extracts water from the suction side of the pump, processes it with a polarizer, and then feeds it into the water tank through a blow pipe. 【Case Details】 ■ Installation Location: East Side Palace T&T, Testa Corporation ■ Installation Date: August 26, 2002 ■ Installation Time: Approximately 5 hours; no water outage due to the presence of an elevated water tank ■ Polarizer Model: PI-25CF (3-point set) *For more details, please refer to the PDF document or feel free to contact us.

  • Housing structure technology/long-term superior housing technology

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Measures against scale and corrosion in newly constructed cooling water systems [Magnetic Water Treatment Device Vol. 13]

Installed using a pump intake method! It processes 10% to 15% of the cooling circulating water volume.

We will introduce measures against scale in newly constructed cooling water systems. In 2001, JUS Citizen Hospital (Osaka City) was completed. At that time, our Polar system was introduced for air conditioning. For two absorption chiller/heaters of 300RT each, "PI-100F" was installed with a pump, processing 10% of the circulating water volume of 10m3/min as standard. Additionally, "PI-32CF" was installed with a pump for the cooling water of the cogeneration self-generating system (CT-100RT). Due to the high temperature of the water, 15% of the circulating water volume of 1035L/min is processed as standard. [Overview] ■ Installation Location: JUS Citizen Hospital (Osaka City) ■ Installation Date: June 16, 2001 ■ Installation Method: Pump intake method ■ Installation Details: Processing 10% to 15% of cooling circulating water volume ■ Installation Purpose: Prevention of scale, corrosion, and water quality purification in the cooling water system *For more details, please refer to the PDF document or feel free to contact us.

  • Housing structure technology/long-term superior housing technology

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Red Water Prevention Measures [Magnetic Water Treatment Device Vol. 1]

Four large polar units installed using the independent circulation method! Introduced for corrosion protection of the water supply piping and the entire facility.

Introducing measures against red water. At MH Techno Garden, which consists of two 24-story buildings and four 6-story buildings, four units of "PI-125F" (2 units) and "PI-100F" (2 units) were installed using an independent circulation method for the purpose of corrosion prevention of the entire water supply piping and equipment. A diagram of the installation of the large polar units is included in the catalog. Please feel free to download and take a look. [Case Overview] ■ Installation Location: MH Techno Garden (Chiba Prefecture), completed in April 1990 (An office building composed of two 24-story buildings and four 6-story buildings) ■ Installation Date: February 6-8, 2003 ■ Model: PI-125F x 2 units, PI-100F x 2 units (total of 4 units installed) ■ Installation Method: Independent circulation method for each water tank ■ Equipment Details: Upper water tank 240m3 x 2 tanks, middle water tank 175m3 x 2 tanks ■ Purpose: Corrosion prevention of the entire water supply piping and equipment *For more details, please refer to the PDF document or feel free to contact us.

  • Housing structure technology/long-term superior housing technology

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Akashui Countermeasures (86 households, 17 years after construction) [Magnetic Water Treatment Device Vol. 3]

A measure to prolong the lifespan by suppressing the deterioration of water supply pipes and preventing scale! Installed in a 17-year-old apartment building with 86 households.

Introducing measures against red water. A "Polar Magnetic Water Treatment Device PI-40CF (connection diameter 40A)" has been installed in the S.T Shin-Koiwa Mansion's underground water tank of 24m3 using an independent circulation method. This was introduced as a longevity measure to suppress the deterioration of the water supply pipes and prevent scale. The Polar Magnetic Water Treatment Device suppresses corrosion progression, gradually removes old rust, and forms a strong magnetite (black rust) anti-corrosion coating inside the pipes. 【Overview】 ■ Installation Date: December 6, 2002 (Friday) ■ Installation Location: S.T Shin-Koiwa Mansion ■ Model: Polar Magnetic Water Treatment Device PI-40CF (connection diameter 40A) ■ Installation Method: Installed in an independent circulation method with a dedicated circulation pump in the water tank ■ Equipment Details: 86 households, 17 years since construction, water tank (effective 24m3) ■ Purpose: Longevity measure to suppress the deterioration of the water supply pipes and prevent scale *For more details, please refer to the PDF document or feel free to contact us.

  • Housing structure technology/long-term superior housing technology

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hydroflow Electromagnetic Water Treatment Device [Overview Video]

Generate an electromagnetic field in water to achieve scale prevention, rust prevention, and slime suppression!

The radio frequency signal transmitted from the transmitter is used to create an electromagnetic field for water treatment inside the pipe, using an electromagnetic field generation device and a ferrite ring fixed around the piping. The magnetic field is formed in a ring shape inside the pipe, perpendicular to the flow of water, while the electric field is formed radially from the center of the pipe towards the inner surface. The effective range extends 5,000 meters upstream and downstream from the installation location of the device.

  • Water Treatment Plant

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wet-type dust collection device for the pharmaceutical and food industry 'RCW type/RCWN type'

High-efficiency dust collection without the need for a pump. Types that are less prone to clogging, etc. A wide variety of capacities available.

The "RCW type/RCWN type" is a stainless steel wet dust collection device that achieves high-efficiency dust collection work without using power sources like pumps. It enables efficient dust collection even for dust with odors, heat, and humidity, as well as combustible hazardous materials. It offers a "scraper type" with a low risk of clogging and a "fan-equipped type" that does not require the installation of a blower. Additionally, there is a wide range of capacities available, allowing for implementation tailored to specific applications and scales. 【Features】 ■ No power source required, such as pumps ■ High dust collection efficiency ■ Low pressure loss (around 130mmH2O under standard conditions, below 100mmH2O is also possible) ■ The discharge slurry concentration is maintained at around 2-3% due to supplementary water ■ Stainless steel scrubber (FRP lining is also available) *For more details, please refer to the materials or feel free to contact us.

  • Garbage disposal, central dust collection, laundry, compressor

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Safe and non-polluting "Polar Magnetic Water Treatment Device"

Norwegian magnetic water treatment device with an effective magnetic force of 6000 gauss.

The safe and eco-friendly "Polar Magnetic Water Treatment Device" is an ideal magnetic water treatment system for preventing the occurrence of scale, rust, and slime. The powerful magnetic field allows water to pass directly through, resulting in high effectiveness, and by treating just a small portion of the main pipe flow, it treats the entire water supply. For more details, please download the catalog.

  • Water Treatment
  • Water Treatment Plant

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Search Keywords Related to Water treatment equipment