Four large polar units installed using the independent circulation method! Introduced for corrosion protection of the water supply piping and the entire facility.
Introducing measures against red water. At MH Techno Garden, which consists of two 24-story buildings and four 6-story buildings, four units of "PI-125F" (2 units) and "PI-100F" (2 units) were installed using an independent circulation method for the purpose of corrosion prevention of the entire water supply piping and equipment. A diagram of the installation of the large polar units is included in the catalog. Please feel free to download and take a look. [Case Overview] ■ Installation Location: MH Techno Garden (Chiba Prefecture), completed in April 1990 (An office building composed of two 24-story buildings and four 6-story buildings) ■ Installation Date: February 6-8, 2003 ■ Model: PI-125F x 2 units, PI-100F x 2 units (total of 4 units installed) ■ Installation Method: Independent circulation method for each water tank ■ Equipment Details: Upper water tank 240m3 x 2 tanks, middle water tank 175m3 x 2 tanks ■ Purpose: Corrosion prevention of the entire water supply piping and equipment *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Company information
Sales through a unique nationwide agency network ≪Polar Magnetic Water Treatment Device≫ ≪Hydroflow Electromagnetic Water Treatment Device≫