Wall Construction Method Product List and Ranking from 33 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

Wall Construction Method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. 太洋基礎工業 Aichi//General contractors and subcontractors
  2. 山一ピーエスコンクリート Hokkaido//Building materials, supplies and fixtures manufacturers
  3. 日本カイザー Tokyo//Other construction industries
  4. 4 アグロジャパン Gifu//Other construction industries
  5. 5 ケアンズ・イノベーション Tokyo//Housing manufacturers and construction companies

Wall Construction Method Product ranking

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. Mini wall construction method 太洋基礎工業
  2. EPS Lightweight Embankment Method - Quilless Wall Method 山一ピーエスコンクリート
  3. Double wall construction method 日本カイザー
  4. 4 External Reinforced Wall Construction Method "e-Power Wall" ケアンズ・イノベーション
  5. 5 RBP wall construction method 太洋基礎工業

Wall Construction Method Product List

46~52 item / All 52 items

Displayed results

Concrete Structure Anti-Corrosion Method "GF Protect Method"

It demonstrates its power in places where a shortened construction period is required and long-term maintenance-free operation is demanded.

The "GF Protect Method" is a groundbreaking technique aimed at preventing corrosion in concrete structures by combining the excellent durability of glass fibers with high-flow, non-shrink filling materials, enhancing safety and cost-effectiveness. It improves "corrosion resistance" and "durability," is lightweight and easy to handle, and does not allow water penetration or reactions, thus preventing freezing and thawing or deterioration of the substrate. 【Features】 ■ No formwork required ■ Workability - Lightweight, making it easy to work without heavy machinery, etc. ■ Shortened construction period ■ Freeze-thaw resistance *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Simple earth retention method for excavation.

The relocation of the excavation area due to construction is quick, so the construction period in residential areas is shorter.

We would like to introduce the "Simple Earth Retention Method for Excavation." In this method, we carry out the work while confirming the excavation in areas that have traditionally been extremely difficult, such as gravel layers. Therefore, when there are boulders, cobbles, or obstacles, it becomes easy to either remove them or proceed with the excavation while embedding them. Additionally, the machinery used consists only of an excavator and a crane truck, with no other heavy equipment or materials required. 【Features】 ■ Each component is designed with safety calculations and a soft composite structure. ■ The interior of the excavation allows for wider and safer work. ■ The movement of the excavation area due to construction is quick. ■ The construction period in residential areas is shorter. ■ Each component can be disassembled and transported by a regular truck. *For more details, please refer to the PDF document or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the Soil Retention Method "KR Method"

Eliminate all waste for a safer construction environment! This is a new concept in earth retention methods.

At Kurahara Co., Ltd., we offer the soil retention method "KR Method," which combines "affordability" and "safety." Using only ground improvement materials and general heavy machinery such as backhoes and power shovels, we can construct soil retention walls. 【Features】 ■ Achieves significantly lower costs compared to conventional sheet pile methods ■ Reduces waste in the construction process, shortening construction time ■ Creates a safe construction environment for both the environment and workers, as large machinery is not required ■ Proven track record with approvals from numerous organizations *For more details, please download the PDF or contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

PC curtain wall construction method

On the exterior walls of office buildings! A variety of finishes such as stone, tile, and paint are possible.

The "PC Curtain Wall Method" is used for facades that adorn the exterior walls of office buildings and similar structures. It allows for a variety of finishes such as stone, tile, and paint. It consists of several components, which not only ensure performance but also contribute to aesthetic features, with various forms of components and interlayer displacement tracking methods during earthquakes being adopted according to the characteristics of the building. [Features] ■ Used for facades that adorn the exterior walls of office buildings and similar structures ■ Offers a variety of finishes ■ Accommodates free shapes ■ Three support methods *For more details, please refer to the PDF materials or feel free to contact us.

  • Housing structure technology/long-term superior housing technology
  • Wood panel and frame wall construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic isolation method

Make your home safe and secure with earthquake-resistant construction!

At S Structural Planning Workshop, we support the creation of homes with high safety through "base isolation construction methods." "Base isolation construction" can be simply described as a system that insulates the ground from the building to prevent ground vibrations from being transmitted to the structure. However, insulating large buildings from the ground is not easy. Therefore, methods such as "sliding base isolation," "rolling base isolation," and "spherical sliding base isolation" are employed, which insert sliding devices between the building and the foundation to reduce the transmission of lateral ground movements. 【Mechanism】 ■ Sliding base isolation - Attach slippery metal plates on both sides of the foundation and the building to allow sliding. ■ Rolling base isolation - Insert ball bearings between the foundation and the building to allow sliding. ■ Spherical sliding base isolation - Insert a device that combines a spherical sliding plate and sliding balls between the foundation and the building. *For more details, please download the PDF or contact us.

  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Wall-type × thin-walled single reinforcement" high durability low-cost smart wall construction method

Wall thickness 150mm, wall-type reinforced concrete construction.

The Smart Wall construction method is... With numerous massive earthquakes of seismic intensity 7 observed across the country, it has become difficult to balance "cost" and "earthquake resistance" amid rising construction costs, causing significant challenges for both builders and operators. The Smart Wall construction method is a wall-type reinforced concrete structure that is highly earthquake-resistant and durable, yet low-cost, capable of withstanding earthquakes of seismic intensity 7, similar to the Great Hanshin-Awaji Earthquake.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Disaster Prevention Wall Construction Method

A groundbreaking cantilever retaining wall that withstands sudden heavy rain has been completed.

The "Disaster Prevention Wall Method" is a hybrid retaining wall with a tandem structure. To effectively utilize 100% of the backfill gravel as self-weight, the thickness of the retaining wall is reduced, significantly decreasing the excavation width and volume of excavated soil. Additionally, each tier of the back blocks has drainage and collection functions, allowing any groundwater that emerges from any part of the slope to be drained to the front of the wall, making it a "groundwater discharge type retaining wall." It has also been developed to meet other criteria such as integration through cast-in-place concrete and safe emergency construction responses. 【Features】 ■ Cost-reducing method ■ Groundwater discharge type retaining wall with high drainage functionality ■ Strongly integrated retaining wall ■ Enables safe emergency construction ■ Reduces complaints about backfill gravel settling *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration