Total Cost Reduction Method "Sun K Clear Method"
Labor-saving, effort-saving, shortened construction period, and easy installation! Ideal for improving the work environment on-site.
The total cost reduction method "Sun K Clear Method" allows for the installation of precast products by adjusting the height with a jack and then floating the main body above the foundation using pre-installed "Raku Pita (height-fixing bolts)." Concrete is then filled into the gap, integrating the retaining wall with the base. This method enables the construction of a robust retaining wall while improving the working environment on-site, reducing installation time, and achieving labor and effort savings, resulting in a total cost reduction. 【Features】 ○ Easy installation ○ Safe construction ○ Complete integration ○ Reduced installation time, labor, and effort ○ Improved installation accuracy For more details, please contact us or download the catalog.
- Company:丸治コンクリート工業所
- Price:Other