Treatment method Product List and Ranking from 42 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

Treatment method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. 麻生フオームクリート Kanagawa//Other construction industries
  2. エステック Osaka//Other construction industries
  3. キクテック 東京本社 Tokyo//Other construction industries
  4. 4 秩父石灰工業 本社 Tokyo//Building materials, supplies and fixtures manufacturers
  5. 5 東京ベルト Tokyo//Trading company/Wholesale

Treatment method Product ranking

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. Slurry-type mechanical stirring deep mixing treatment method "Ascolam TYPE II" 麻生フオームクリート
  2. Deep Mixing Method (Mechanical Stirring Method) "Esmi Column Method" エステック
  3. Ground improvement work using large-diameter mechanical mixing deep mixing method "RAS Column Method" 麻生フオームクリート
  4. 4 Ground improvement work Deep mixing method "Ascolam method" 麻生フオームクリート
  5. 4 Surface Mixing Treatment Method "Esmic Method" エステック

Treatment method Product List

61~64 item / All 64 items

Displayed results

Non-explosive demolition method for pile head treatment

Aiming to eliminate excessive labor accompanied by noise and vibration, non-explosive demolition agents are applied to pile head treatment.

The non-explosive demolition agent method for pile head treatment involves loading a non-explosive demolition agent into holes drilled from the outer surface of the pile towards its center, and igniting it to instantaneously crush the concrete, forming a horizontal fracture surface, thereby separating the main body of the pile from the excess portion. The excess portion can be removed as consolidated fragments using a crane or similar equipment. The chipping work involved in pile head treatment is an extremely demanding task for workers, as they are subjected to strong noise, vibration, and dust at close range. In the construction sector, where there is a shortage of workers, the non-explosive demolition agent method for pile head treatment is a technology that contributes to the preservation of the surrounding environment as well as the improvement of the working conditions. The non-explosive demolition agent undergoes a redox reaction known as the thermite reaction, which crushes the material through instantaneous steam expansion pressure. The reaction rate is about 1/25 that of explosives, and since it does not generate shock waves, it can separate the excess portion without damaging the main body of the pile. Tests on the concrete compressive strength of the main body of the pile and tensile tests on the rebar have confirmed that there is no reduction in strength, and that both the concrete and rebar are intact.

  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the Bulk Spray Method "Hias Method"

Short construction period, low cost, safe asbestos bulk spray containment method.

At Life Protect Co., Ltd., we offer the "Hias Method," which was developed after a detailed examination of the issues related to removal, containment, and enclosure. We use a council-certified "Air Fog Atomizer" that generates a mist with a consistent particle size, and we spray the minister-certified agent "Hias Gripper" automatically without human intervention. By spraying a mist-like agent with uniform particle size, it is possible to capture dust in areas that are difficult to access, such as gaps where human hands cannot reach, places where asbestos dust is not visible, and airborne dust. 【Features】 ■ Registered in the Ministry of Land, Infrastructure, Transport and Tourism's New Technology Information Provision System KT-100050-A ■ Construction can be carried out without the need for tenant or resident relocation ■ No asbestos dispersion ■ Maintains fire resistance, thermal insulation, and condensation prevention performance *For more details, please download the PDF or contact us.

  • Renovation and repair methods
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Deep Mixing Method "S-Max Column Method"

Construction possible up to 1,300m! Slurry-type mechanical mixing method for deep mixing treatment using vertical repeated stirring.

The "S-Max Column Method" is a deep mixing treatment method that removes poor soil using the newly developed TS head, achieving the construction of a homogeneous improved body with minimal strength variation. By vertically mixing the entire length, it enables the integration of the strength of the improved body. Furthermore, visual confirmation of the head of the improved body allows for early detection of issues. 【Features】 ■ Significant improvement in mixing performance through vertical stirring using the TS head ■ Visual confirmation of the mixing condition of the improved body and the solidification status after construction allows for early detection of issues ■ Uniformity of the strength of the improved body is possible even in interlayer ground ■ The use of the TS head allows for the prior removal of poor soil (such as highly organic soil), achieving an economical mix design ■ Early confirmation of the mixing condition is possible *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Information] Substrate treatment methods such as floor leveling and coating removal.

Rotate the diamond disc! Perform removal of various coatings and surface treatment.

We would like to introduce our surface preparation method "Grinding." This method involves surface treatment using a horizontally rotating diamond disc, allowing us to select and utilize various machines and diamonds from a diverse lineup to remove different coatings and perform surface treatments. By combining this with cutting methods and peeling methods, it is possible to finish rough surfaces smoothly. 【Features】 ■ Dust is collected with a vacuum ■ Surface polishing and thin film removal are achieved by rotating the diamond disc ■ Removal of epoxy coatings is possible using special chip blades *For more details, please download the PDF or feel free to contact us.

  • Pavement construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration