[Heat Stroke Prevention Case Study] Meiji Jingu Gaien Tennis Club
Highly rated by our members! We have introduced an air conditioning unit that excels not only in cooling but also in dehumidifying.
This is an introduction to the case of implementing the "Spot Bazooka" at the Meiji Jingu Gaien Tennis Club. Due to the steel frame membrane roof structure, it was difficult to add air conditioning units, and despite various efforts, the indoor temperature reached nearly 40°C on extremely hot days, leading to ongoing struggles with safety management and labor management. After introducing our product, we have achieved the expected cooling effect, and we have received high praise from our members. In fact, on September 23 at 1:00 PM, the outdoor temperature was 32.2°C while the indoor temperature was 24.8°C, showing a drop of about 7°C compared to the outside air. [Implementation Overview] ■ Location: Indoor court of Meiji Jingu Gaien Tennis Club - Area: 4,531 m² - Ceiling height: 10.6 m ■ Product implemented: Gup Pi Bazooka Single Type, 10 units (rated 4 horsepower, maximum 7 horsepower) *For more details, please refer to the PDF document or feel free to contact us.
- 企業:イーズ 本社
- 価格:Other