Spot Cooler Product List and Ranking from 28 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 24, 2025~Oct 21, 2025
This ranking is based on the number of page views on our site.

Spot Cooler Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 24, 2025~Oct 21, 2025
This ranking is based on the number of page views on our site.

  1. null/null
  2. 三協エアテック Osaka//Building materials, supplies and fixtures manufacturers
  3. イマギイレ Saitama//Service Industry
  4. 4 シロ産業 Osaka//others
  5. 5 イーズ 本社 Tokyo//Construction Consultant

Spot Cooler Product ranking

Last Updated: Aggregation Period:Sep 24, 2025~Oct 21, 2025
This ranking is based on the number of page views on our site.

  1. Spot Cooler "PureDrive"
  2. Vapor-type spot cooler "Pure Drive" *Live demonstration available at Tokyo SR!
  3. [Heat Stroke Prevention] Single-Phase 200V Spot Cooler 三協エアテック
  4. 4 Local cooling device "spot cooler" イマギイレ
  5. 5 Heat-free & fluorine-free spot cooler "PureDrive"

Spot Cooler Product List

46~60 item / All 74 items

Displayed results

Spot cooler "Ryo-Dan Biento"

Strong cold wind from room temperature to -13°C! You can choose between a combo type or a separate type depending on your usage environment!

The "Ryoan Biento" is a spot cooler that circulates wind over a large space with a maximum reach of about 50 meters. Unlike regular air conditioners, it sends cool air directly to people, maximizing its effectiveness even while ventilating or with windows and shutters open. We offer a "Combo Type" that can be freely moved anywhere with casters, and a "Separate Type" that is placed separately indoors and outdoors, similar to a regular air conditioner. 【Features】 ■ Large airflow of 4340m3/h ■ Reaches far and minimizes temperature unevenness, also functioning as a circulation fan ■ While also serving as a circulation fan, heating costs are about 1/3 ■ Operates at a standard of 6 horsepower, with a maximum of 9 horsepower *For more details, please refer to the PDF document or feel free to contact us.

  • Cooling system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Complete Factory Cool Down" Implementation Results and Customer Feedback "Heat Stroke Prevention

Introducing the implementation results and customer feedback of "Complete Factory Cool Down" for heatstroke prevention, and it's energy-saving too!

Introducing the implementation results and customer feedback for "Complete Factory Cool Down." At a certain linen factory that had been using spot coolers but found them ineffective, improving the working environment was a challenge. The temperature inside the factory, which was 31.4 degrees without steam circulation, was reduced to 28.5 degrees after implementing the Cool Breeze Plan. Additionally, we have received feedback from other clients, including a ribbon factory and Kamagaya Kougyou Co., Ltd., as well as numerous implementation results from the Japan Ground Self-Defense Force base and Indoor Tennis Beautec. 【Implementation Results】 ■ Japan Ground Self-Defense Force Base ■ Indoor Tennis Beautec ■ Okayama Kindergarten ■ Municipal Elementary School Gymnasium ■ Osaka Monorail *For more details, please refer to the external site or PDF materials, or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heatstroke Prevention Case] Cooling Down the Gymnasium

Up to 8 hours of continuous operation possible! Case study of the special specification Strong Cool for educational facilities.

We would like to introduce the case of implementing "Strong Cool (special specifications for educational facilities)" in 56 elementary and junior high schools and 6 community centers in Ichikawa City, Chiba Prefecture. The special specifications for educational facilities include features to prevent finger pinching at the air outlet and enhanced durability against impacts from balls and other objects. It can be used immediately with a 100V power supply and water. It is easy to move with casters. With a large water storage tank, it can operate continuously for up to 8 hours, and the wind reach distance is approximately 20 meters, providing powerful airflow. We also offer a demonstration (free of charge) where you can experience the actual unit. 【Case Study】 ■Location - 56 elementary and junior high schools in the city - 6 community centers ■Product Introduced: Strong Cool (special specifications for educational facilities) *For more details, please refer to the external link or PDF materials, or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Measures] Introduction of Hyper Strong Cool to Alloy Steel Factory

It can be moved according to the work location! You no longer have to worry about decreased work efficiency due to heat.

We have introduced one unit of the "Hyper Strong Cool (Combo Type)" to the alloy iron factory in Anan City, Tokushima Prefecture. The "Combo Type" features both the indoor and outdoor units installed on a caster-equipped frame, making it easy to move. It can be relocated according to the work area, allowing for targeted cool air delivery to workers, eliminating concerns about decreased work efficiency due to heat. We offer rental and sales. Please feel free to contact us. *The airflow and other numerical values or comparison values are based on measurements conducted according to our company's measurement standards and may vary depending on voltage and other conditions. *For more details, please refer to the PDF document or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Cool Revolution: Heat Measures for Large Spaces and Facilities

Targeting various on-site heat spots! A mobile high-capacity spot cooler that reduces running costs, requires no installation work, and can be easily introduced.

In recent years, during the summer, there have been consecutive days of extreme heat, making heatstroke prevention a priority. However, in large spaces such as factories and warehouses, there are concerns about the labor and costs associated with air conditioning installation, making it difficult to take action. That's where the YAMAZEN large spot cooler "Cool Revolution" comes in to solve the problem! With Cool Revolution, you can cool a wide area with strong cold air. It works effectively even in high-ceilinged large warehouses. No extensive installation work is required. Although it appears large, it only occupies the space of a single pallet. With casters, it can be moved to the necessary location, allowing for partial cooling of only the areas where people are present, significantly reducing running costs! We offer three types: one with auto louvers, one that can have ducts attached, and an economy type limited to minimal functions. You can choose according to the environment of your site. For more details, please download the catalog and manga for confirmation. *Cool Revolution is a registered trademark of YAMAZEN Co., Ltd.

  • Cooling system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[FEB-DD Series Case Study] Vaccination Site

Since it's a rental, installation takes little time and costs can be kept low! Examples of adoption at three venues.

From July to August, we would like to introduce a case where "D.D-Spot" and "FEB-HP Spot" were rented at vaccination sites. Since the gymnasium was used as the vaccination site, it took time and cost to set up air conditioning, and we received inquiries as they wanted to prevent heatstroke for the visitors. During discussions with the customer, we decided to install the equipment outdoors. We connected ducts to send air into the venue. By sending air from above the venue, the wind reached areas separated by partitions, which seemed to be effective in preventing heatstroke. 【Case Overview】 ■ Installation Locations: 3 Vaccination Sites ■ Equipment Installed - D.D-Spot Type J (3 units) - D.D-Spot Type R (3 units) - FEB-HP Spot Type R (1 unit) ■ Venue Size: 3,285 m² *For more details, please refer to the related links or feel free to contact us.

  • Air conditioning equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Spot Cooler "MSC25"

Heat countermeasures for work sites and exhibition venues! The air outlet can swivel up to 210 degrees left and right.

The MSC25 is a spot cooler that combines ease of use and robustness. With a simple switch for off/low/high, it allows for direct and easy operation, and the tank is compactly designed for easy transport and maintenance. It is effective in various locations such as factories, work sites, construction sites, outdoor tents, kiosks, stores, and kitchens. 【Features】 ■ Easy-to-remove front air filter ■ Equipped with hanging hooks ■ Low-drain design with minimal drainage (tank capacity: 5L) ■ Durable all-metal casing ■ Equipped with a heat exhaust duct to expel heat outside *For more details, please refer to the PDF document or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to Technical Services and Melting Equipment

It is possible to turn powders into liquid products! We meet diverse needs.

Our company employs technical service staff for coagulant selection in total support for wastewater treatment, providing coagulant proposals to business locations in Kyushu, Yamaguchi, and Hiroshima. To date, we have a track record of conducting analyses and tests for over 700 facilities, including government agencies and private companies, and more than 4,000 test specimens. The accumulation of this extensive data from demonstration tests is our strength and leads to proposals for everyone. 【Proposal Method】 ■ Current Situation Analysis ■ Beaker Test and Chemical Selection ■ Proposal ■ On-site Testing and Adoption *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Vehicle Maintenance Facility

The key point is that the air conditioning's cooling airflow reaches far with a large volume of air! Introduction of case studies from vehicle maintenance facilities.

This is an introduction to a case study implemented at a vehicle maintenance facility. The work inside the vehicle maintenance facility was conducted without air conditioning, but due to the increasingly severe heat during summer years, we were considering measures against heatstroke. As a solution, we installed one integrated spot bazooka in the vehicle maintenance lane, which is the main work flow, and two additional integrated spot bazookas on the opposite side. We considered various products, but after experiencing the actual machine at an exhibition, we decided on the spot bazooka from Ease. The deciding factor was its high air volume, which allowed the air conditioning's cooling breeze to reach far away. After installation, the dehumidified dry air reached us, drying our sweat and creating a comfortable environment. [Implementation Overview] ■ Installation Location: Koto Ward, Tokyo, Vehicle Maintenance Facility ■ Number of Units Installed: 7 Integrated Spot Bazookas ■ Installation Date: July 2020 *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Shinkokugyo Co., Ltd.

Cooling only the workspace! Introduction of a case study that significantly reduced air conditioning installation costs.

Shinchu Kogyo has been considering measures against heatstroke at their automobile maintenance facility for some time. During their consideration of air conditioning systems due to the relocation of their headquarters, they learned about the existence of the Spot Bazooka at an exhibition. They found that the Spot Bazooka blows cool air only to the work area (where needed), significantly reducing initial costs compared to installing a conventional air conditioner. Furthermore, due to the nature of the maintenance facility, dust is stirred up. The Spot Bazooka's environmental resistance, allowing it to be used outdoors while being easy to maintain, was a decisive factor in its adoption. [After Implementation] - Initial costs significantly reduced - Environmental resistance for outdoor use - Easy maintenance - The cooling air reached over 10 meters even in the semi-open maintenance facility where outside air enters, allowing workers to perform maintenance comfortably - Work efficiency also improved *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Chikushi Jogakuen University

For gymnasiums where regular air conditioning installation is not possible, "Spot Bazooka" is the solution! Introduction of case studies.

Here is an introduction to the case of Chikushi Jogakuen University, which implemented measures against heatstroke for classes and club activities. Due to the aging of the gymnasium, the university had previously been unable to install conventional air conditioning. However, with the installation of "Spot Bazooka," students can now participate in physical education classes and club activities without worrying about heatstroke, creating a comfortable environment. Additionally, a safety net has been installed as a precaution, ensuring safe use by preventing fingers from getting caught. The drainage of condensate water is managed with a tank. 【Overview of Implementation】 ■ Location: Chikushi Jogakuen University, Fukuoka Prefecture ■ Number of Units Installed: 4 integrated units ■ Installation Date: July 2020 *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning
  • Air conditioning equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heatstroke Prevention Measures Case Study] Vaccination Concentration Site

A pleasant space with cool air flowing! A case study introducing the integrated "Spot Bazooka" that requires almost no construction.

This is an introduction to the case of introducing "Spot Bazooka" at the concentrated vaccination site in Ayagawa Town, Kagawa Prefecture. The gymnasium was suddenly designated as a vaccination site, but since air conditioning was not installed, measures against heatstroke and high temperatures were necessary during vaccinations in the summer. Therefore, eight integrated "Spot Bazooka" units, which require almost no construction, were introduced. They were delivered in June during the rainy season, and during the trial operation, a refreshing cool breeze with reduced humidity was emitted, which seemed to satisfy the town mayor and the townspeople. 【Overview】 ■ Installation location: Concentrated vaccination site in Ayagawa Town, Kagawa Prefecture ■ Installed product: Eight integrated "Spot Bazooka" units *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning
  • Air conditioning equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Meiji Jingu Gaien Tennis Club

Highly rated by our members! We have introduced an air conditioning unit that excels not only in cooling but also in dehumidifying.

This is an introduction to the case of implementing the "Spot Bazooka" at the Meiji Jingu Gaien Tennis Club. Due to the steel frame membrane roof structure, it was difficult to add air conditioning units, and despite various efforts, the indoor temperature reached nearly 40°C on extremely hot days, leading to ongoing struggles with safety management and labor management. After introducing our product, we have achieved the expected cooling effect, and we have received high praise from our members. In fact, on September 23 at 1:00 PM, the outdoor temperature was 32.2°C while the indoor temperature was 24.8°C, showing a drop of about 7°C compared to the outside air. [Implementation Overview] ■ Location: Indoor court of Meiji Jingu Gaien Tennis Club - Area: 4,531 m² - Ceiling height: 10.6 m ■ Product implemented: Gup Pi Bazooka Single Type, 10 units (rated 4 horsepower, maximum 7 horsepower) *For more details, please refer to the PDF document or feel free to contact us.

  • Cooling system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration