Ground reinforcement work | The necessity to prevent building settlement and ensure a high level of structural safety.
The necessity of ground reinforcement work to prevent building settlement and collapse risks. A composite structure of stepped steel pipes and soil cement achieves strong support and high seismic resistance.
In construction planning, it is extremely important to confirm and ensure the structural safety of the ground that safely supports the building's load. If appropriate measures are not taken for weak ground, it can lead to uneven settlement, tilting of the building, and cracks in the exterior walls, significantly reducing the durability of the home and its asset value. The Tiger Pile Method is an innovative hybrid ground reinforcement technique that places a high-strength stepped steel pipe as the core material at the center of a soil-cement column. By integrating the large surface friction of the column with the excellent material strength and seismic resistance of the stepped steel pipe produced through hot manufacturing, it demonstrates high bearing capacity even under harsh load conditions and in narrow spaces, which are difficult to address with conventional column improvements. The synergistic effect of both components maintains excellent resistance to shaking and uneven loading during earthquakes, ensuring the structural safety of the building over the long term. GeoTech Co., Ltd. utilizes a strict quality control system and advanced technical capabilities to provide reliable ground reinforcement work, supporting the creation of safe homes.
- Company:ジオテック
- Price:Other