Attack-type production management system 'TPiCS-X' [Solving 5 difficult problems!]
Resolving five challenges: poor inventory, design changes, delays in drawings, delays in shipments, achieving visibility on the production floor, and production that responds to short lead times and changes.
We will solve the five challenges faced by the manufacturing industry with "TPiCS-X." It is not surprising to think, "Can such a system really do that for just 1 or 2 million yen?" Of course, simply purchasing TPiCS-X will not resolve these "challenges." It is essential to understand the production management concepts we propose and to put them into practice. The path is not an easy one. However, it is a path that will surely lead to true solutions. 【Five Challenges】 1. Short lead-time production and production that responds to changes 2. Realizing visibility on the shop floor 3. Eliminating shipment delays 4. Reducing inventory 5. Responding to design changes and delays in drawing issuance *For more details, please download the PDF or contact us.
- Company:ティーピクス研究所
- Price:Other