Ground improvement work Product List and Ranking from 36 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

Ground improvement work Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. 太洋基礎工業 Aichi//General contractors and subcontractors
  2. HOKOKU ENGINEERING CO.,LTD. Osaka//Other construction industries
  3. 山下工業 Kyoto//Other construction industries
  4. 4 熊野組 Hiroshima//Other construction industries
  5. 4 エルニード協会 Kagawa//Other construction industries

Ground improvement work Product ranking

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. TRD method 太洋基礎工業
  2. HiroWork Kmighty Method 太洋基礎工業
  3. Groundwater Level Measurement Method (Chikachan) HOKOKU ENGINEERING CO.,LTD.
  4. 4 For deep excavation work and cutting/removal of underground obstacles! Super Top Method. 太洋基礎工業
  5. 5 Bauer method 太洋基礎工業

Ground improvement work Product List

61~75 item / All 87 items

Displayed results

Ground Improvement Work "Screw Press Liquefaction Mitigation Method"

Eliminate liquefaction damage from residential land in Japan! Ultra-low-cost liquefaction countermeasure methods.

The "Screw Press Liquefaction Mitigation Method" is a construction method suitable for residential areas, characterized by being vibration-free, low-noise, and having a short construction period. It is a hybrid method that simultaneously compresses sandy ground and dissipates pore water pressure, addressing liquefaction issues while also improving ground stability (increasing bearing capacity). Effectiveness tests were conducted over two years in collaboration with Nagaoka University of Technology at the prefectural land "Manyo Wharf" in Takaoka City, Toyama Prefecture, confirming its significant effectiveness. 【Features】 ■ An environmentally friendly method that does not use cement ■ Also improves ground stability (increases bearing capacity) ■ Vibration-free, low-noise, short construction period ■ Extremely low cost compared to existing methods ■ Generates very little drilling waste *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Risks of ground improvement

There are many pitfalls in easy ground improvement and reinforcement work.

Did you know that in cases of weak ground, despite the ground reinforcement work being done, ground accidents actually occur more frequently than fires? Even if you go through the trouble of ground improvement and reinforcement work, if your house tilts due to differential settlement, it is the same as having a defective house. Because the ground, which cannot be seen, is what truly supports your home, it is essential to choose ground improvement and reinforcement work that genuinely provides support. [Examples of Ground Accidents] - Accidents with slab foundations and surface improvement - Cases where cement does not set properly - Piles not reaching the hard ground - If the thickness of soft ground and hard ground differs, the friction will also differ *For more details, please refer to the PDF materials or external links, or feel free to contact us.

  • Ground foundation construction method
  • Special Construction Method
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Limited Company Hiraoi Construction - Business Introduction

We respond to needs with reliable technical skills, from general civil engineering to specialized construction.

Heiei Construction Co., Ltd. is committed to solving various issues in urban civil engineering by adopting methods such as shaft construction and steel casing techniques, prioritizing safety, compliance with regulations, and enhancing the development of technology and machinery. We leverage the knowledge and extensive experience gained from our technical capabilities, maintaining a proactive attitude to meet needs and dedicating ourselves sincerely to our work. Our company focuses all its efforts on thrust construction and steel casing methods, striving daily to improve and advance. 【Business Activities】 - Casing shaft construction - Small-diameter pipe thrust construction - Ground improvement work - Screw press liquefaction mitigation method - Solar power foundation work, etc. For more details, please contact us or download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

CMT method

From soft soil to boulders and bedrock! Achieved the world's longest thrust distance of 1,447.6 meters (1 span)! A composite thrust construction method that accommodates various construction conditions.

The "CMT (Compound Mini Tunnel) method" is not a single system method, but a general term for a system that responds to various construction conditions. There are "CMT ultra-long-distance propulsion system," "CMT floating system," "CMT rock propulsion system," "CMT cobble and gravel ground propulsion system," "CMT face obstruction removal propulsion system," and "CMT ultra-soft and quicksand ground propulsion system." *For more details, please refer to the catalog or feel free to contact us.*

  • Civil Engineering Method
  • Water Supply Facilities
  • Sewerage facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Multi-Point DP Construction Method

Various liquid injections are possible! A method that allows simultaneous injection at 16 points with one unit.

The "Super Multi-Point DP Method" enables injection at 16 points with a single unit and allows for approximately 100,000 liters of injection per day with two units (32 points), making it a soil purification method. It employs construction management technology using computers and has developed compact, low-noise, and low-vibration construction equipment, making it versatile for various applications. It is capable of injecting various liquids, including solution types, suspension types, bio (nutrients), and Fenton (catalysts and oxidants). 【Features】 - Variable discharge of 1 to 10 liters per minute per point - Injection management system that monitors and controls flow rate and injection pressure - Usable in narrow spaces around existing residential land and structures - Extremely low-noise equipment (except for the generator) For more details, please feel free to contact us.

  • Ground improvement
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

CCC method

Soil-cement diaphragm wall method applicable to hard ground with N value of 100 or more.

The "CCC Method" is an abbreviation for the Chain Conveyor Cutter method, which uses CCC to construct ground improvement bodies. By mixing and blending the excavated ground with solidifying materials into soil cement, it enables the construction of underground continuous waterproof walls, temporary earth retaining walls, building foundations, grid-like improvements, and full improvements, among other applications, including soil contamination countermeasures. 【Features】 ■ The quality of the improved body is uniform in the vertical direction. ■ Capable of constructing gravel layers with an N value of 50 or more. ■ Immediate response is possible even if the depths differ within the same site. ■ Quick changeover of construction progress direction. ■ NETIS registration number QSK-12005-V. *For more details, please refer to the catalog or feel free to contact us.

  • RIMG0931.JPG
  • RIMG0930.JPG
  • PC050239.JPG
  • PC050241.JPG
  • Ground foundation construction method
  • Ground improvement
  • Earth retaining wall/foundation reinforcement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

CDM-Land4 Method

Significant shortening of construction time is possible! A new ground improvement method that contributes to cost reduction.

The "CDM-Land4 Method" is a construction method that utilizes a set of four axes, allowing for simultaneous construction with four axes. This results in reduced construction time, lower costs, and excellent mixing performance, enabling the creation of high-quality improved ground. With the development of the extension rod, deep construction has become possible, achieving a construction height approximately 10 meters lower than conventional construction machinery and realizing a more efficient construction cycle compared to traditional extension methods. 【Features】 ■ Significant reduction in construction time ■ Contribution to cost savings ■ Creation of high-quality improved ground with minimal variation due to simultaneous four-axis mixing ■ High construction precision ■ Compatibility with a wide range of improvement methods For more details, please refer to the catalog or feel free to contact us.

  • Ground foundation construction method
  • Ground improvement
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

NSPC W method

NETIS registration! A lightweight embankment construction method that allows for shortening construction time and reducing costs by making panel materials self-supporting!

In developing a construction method utilizing lightweight embankment techniques, one of the issues identified is that the air-entrained lightweight embankment materials (air mortar, air milk) generate significant soil pressure due to fluidity and expansion pressure during curing. In conventional formwork methods, some form of reinforcement is typically implemented to resist and maintain these pressures. However, when using H-beams as reinforcement on the back of precast panels, the need for large machinery becomes a hindrance during the placement of lightweight mortar, compromising both workability and cost-effectiveness. Therefore, by applying tension to the NSC panels using rods and supporting the lower edge of the panels in a cantilever beam configuration, it has become possible to construct vertical walls, sloped walls, and curved walls. This achievement has led to significant reductions in construction time and costs, resulting in the completion of a technology capable of building exceptionally robust structures that have not been possible before. *For more details, please contact us or download the PDF.*

  • Retaining wall
  • Civil Engineering Method
  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shallow and Deep 4-Axis Method

A shallow to medium-depth ground improvement method that can enhance a wide area using small machinery. *Transportation costs are minimized with small machinery! [NETIS: KT-170044-A]

The "Shallow-Deep 4-Axis Method" is a mechanical mixing ground improvement method that discharges cement slurry from a dedicated rod tip and mixes it during excavation. A technical management system for large cross-section construction (φ700mm×4 axes = 1.46m²) has been established using compact construction machinery. With an automatic posture control system mounted on a backhoe, a maximum improvement depth of 6m is possible, while a leader method allows for construction up to 15m deep. This method provides flexible ground improvement solutions, even in narrow construction sites, as well as large-scale ground improvement projects. 【Features】 ■ The Shallow-Deep 4-Axis processing machine can be mounted on general-purpose backhoes or self-propelled small cranes. ■ By following the operation manual for settings, stable ground improvement work can be achieved. ■ Two types of construction machines are available: one using an automatic posture control backhoe and another using a telescopic crawler crane in a guide leader method. ■ Patent No. 4920116 ■ NETIS Registration No.: KT-170044-A For more details, please refer to the catalog or feel free to contact us.

  • 0.jpg
  • 1.jpg
  • 2.jpg
  • 3.jpg
  • Ground foundation construction method
  • Ground improvement
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rotary crushing and mixing method

Realizing the effective use of all construction-generated soil! Applicable to the separation and improvement of debris-mixed soil generated by disasters!

1. The impact force of the rotating chain can crush and mix from viscous soil to soft rock. 2. The mixing of high water content viscous soil and sandy soil, as well as the crushing of gravel, can be improved to a high quality. 3. Viscous soil and soft rock, which were traditionally disposed of as waste, can now be improved and reused. 4. Soil containing plants and debris can be neatly screened, improving the recycling rate.

  • Road construction
  • River construction
  • Harbor Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Bauer method

Excavation of underground obstacles and all-casing foundation pile work can be carried out close to the boundaries even in sites where buildings and structures are densely packed!

Taiyo Kiso Kogyo Co., Ltd. has introduced the "Hydraulic Universal Large-Diameter Excavator BG-20," making it possible to work close to boundaries even in sites where buildings and structures are densely packed. 【Suitable for the following construction!】 ■ Underground obstacle removal work ■ All-casing foundation pile work *For details on construction and the excavator, please refer to the PDF available for download.

  • Foundation construction
  • Ground foundation construction method
  • Wood panel and frame wall construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TRD method

Continuous underground wall construction possible at a height of 10m and maximum depth of 60m with machinery!

The "TRD method" is a construction technique that involves moving a cutter post installed underground horizontally while excavating the ground with cutter bits attached to a cutter chain, mixing and stirring the solidifying liquid with in-situ soil in a vertical direction, and creating a solidified body in the ground. 【Features】 1. Outstanding stability 2. High-precision construction possible 3. Cost reduction achieved through excellent excavation capability 4. Homogeneous wall quality in the depth direction 5. Continuous construction without misalignment 6. Flexible setting of core material spacing Outstanding stability, high-precision construction, and excavation capability! A ground continuous wall method adaptable to various applications! *For more details, please feel free to contact us.*

  • Foundation construction
  • Temporary Construction
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TRD-wide method

The "TRD-wide method" is a wide-type "TRD method." The use of large core materials allows for a reduction in support materials!

The "TRD Method" is a construction technique that involves moving a cutter post installed underground horizontally while excavating the ground with cutter bits attached to a cutter chain, mixing and stirring a solidifying liquid with in-situ soil in a vertical direction, and creating a solidified body in the ground. 【Features】 1. Outstanding stability 2. High precision construction possible 3. Cost reduction achieved through excellent excavation capability 4. Homogeneous wall quality in the depth direction 5. Continuous without discrepancies 6. Arbitrary setting of core material spacing possible Outstanding stability, high precision construction, and excavation capability! A ground continuous wall method adaptable to various applications! *For more details, please feel free to contact us.*

  • 長野.png
  • 市川.jpeg
  • 札幌.jpeg
  • Foundation construction
  • Temporary Construction
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Electric discharge crushing method

Breaks hard and solid bedrock and concrete using electric power. It produces low noise and can be used in urban areas and indoors. The breaking device can be mounted on a one-box vehicle.

Features 1. A crushing method that does not use explosives. ■ Not subject to the regulations of the Explosives Control Law. 2. Controllable crushing force, noise, and vibration. ■ Low vibration... at 30m away, it is at the same level as a favorable environment. ■ Low noise... at 30m away, it decreases to about 70 dB. ■ Low dust... almost no dust generated during crushing.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Large-scale high-speed ground improvement "SUPERJET"

Achieve high-efficiency construction with a minimal amount of cement slurry! Significantly reduce the amount of slime.

The "SUPERJET" method is a large-scale high-speed ground improvement technique that creates massive piles with a maximum diameter of 6 meters underground. This method consists of a plant system that uses a horizontally opposed jet monitor equipped with a special rectifying device and a super high-pressure slurry pump. It drills a hole approximately 20 cm in diameter into the ground, installs the monitor to the specified depth, and injects super high-pressure, high-flow slurry from the nozzle, simultaneously cutting and mixing the surrounding soil to rapidly create high-quality large piles. 【Features】 ■ Capable of creating ultra-large diameter piles ■ Reduction of industrial waste ■ Achieves high-speed and high-quality construction ■ Excellent economic efficiency *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration