Ground improvement work Product List and Ranking from 36 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

Ground improvement work Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. 太洋基礎工業 Aichi//General contractors and subcontractors
  2. HOKOKU ENGINEERING CO.,LTD. Osaka//Other construction industries
  3. 山下工業 Kyoto//Other construction industries
  4. 4 熊野組 Hiroshima//Other construction industries
  5. 4 エルニード協会 Kagawa//Other construction industries

Ground improvement work Product ranking

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. TRD method 太洋基礎工業
  2. HiroWork Kmighty Method 太洋基礎工業
  3. Groundwater Level Measurement Method (Chikachan) HOKOKU ENGINEERING CO.,LTD.
  4. 4 For deep excavation work and cutting/removal of underground obstacles! Super Top Method. 太洋基礎工業
  5. 5 Bauer method 太洋基礎工業

Ground improvement work Product List

16~30 item / All 87 items

Displayed results

Ground Improvement Method "Rising W" Construction Procedure

A detailed introduction to the construction process from preparation work to completion for "Rising W"!

Here are the construction procedures for "Rising W." In the preparation work, to ensure stability during the operation and movement of the construction machinery, we will carry out measures such as laying steel plates, surface ground improvement, curing, alignment and marking, inspection and calibration of measuring devices, and checking the condition of the solidifying agents. 【Construction Procedures】 ■1. Preparation Work ■2. Positioning ■3. Start Excavation ■4. Confirm Excavation Depth ■5. Introduce Improved Soil and Solidifying Agent Slurry ■6. Mixing ■7. Repeat ■8. End of Mixing and Construction *For more details, please refer to the PDF document or feel free to contact us.

  • Earthworks
  • Ground improvement
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Understanding Ground Investigation Processes and Knowledge through Manga!

[Free Manga] Explaining the risks of vibration, the risk of tilting, and the construction work for removing existing improved piles through manga!

This booklet provides a clear explanation of the process of ground investigation. It includes risks such as vibration risk, tilting risk, repair cost risk, and various ground improvement methods. We are currently offering a free manga booklet. If you are interested, please view the PDF from "PDF Download." [Contents (excerpt)] ■ Vibration risk ■ Tilting risk ■ Repair cost risk ■ Columnar ground improvement work ■ Surface ground improvement work *For more details, please refer to the PDF document or feel free to contact us.

  • Earthworks
  • Pile and foundation work
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Shiga Prefecture Ground Improvement" Ground Reinforcement Method 'Woody Force Method'

Applicable to sandy and clayey soil in Shiga Prefecture! This is an ecological and environmentally friendly method that utilizes small-diameter thinned wood as ground reinforcement material for housing!

The Woody Force method is a ground reinforcement technique aimed at small-scale buildings, utilizing unused thinned timber. This method uses thin-diameter thinned timber of "sugi" (Japanese cedar) or "hinoki" (Japanese cypress), which is somewhat too slender for use as house pillars and has been largely underutilized, as ground reinforcement material for houses, making it eco-friendly. By applying anti-corrosion and anti-termite treatment that complies with AQ certification (certification for quality wood building materials, etc.) B-3 (outdoor product components) to the wood used as ground reinforcement material, we aim to further enhance durability. 【Features】 ■ CO2 Reduction - Does not use cement or steel, which emit large amounts of CO2 during the manufacturing process - Contributes to energy conservation and reduction of greenhouse gases ■ Durability - By applying anti-corrosion and anti-termite treatment that complies with AQ certification B-3 to the wood used as ground reinforcement material, we aim to further enhance durability. *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground Improvement in Mie Prefecture: Ground Reinforcement Method 'Woody Force Method'

Applicable to sandy and clayey ground in Mie Prefecture! This is an ecological and environmentally friendly method that utilizes small-diameter thinned wood as ground reinforcement material for houses!

The Woody Force method is a ground reinforcement technique aimed at small-scale buildings, utilizing unused thinned timber. This method uses thin-diameter thinned timber of "sugi" (cedar) or "hinoki" (cypress), which is somewhat too slender for use as house pillars and has been largely underutilized, as ground reinforcement material for houses, making it eco-friendly. By applying anti-corrosion and anti-termite treatment that complies with AQ certification (certification for quality wood building materials, etc.) B-3 (outdoor product components) to the wood used as ground reinforcement material, we aim to further enhance durability. 【Features】 ■ CO2 Reduction - Does not use cement or steel, which emit large amounts of CO2 during the manufacturing process - Contributes to energy conservation and reduction of greenhouse gases ■ Durability - By applying anti-corrosion and anti-termite treatment that complies with AQ certification B-3 to the wood used as ground reinforcement material, we aim to further enhance durability. *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

If you're looking for ground improvement in Hyogo Prefecture! Ground reinforcement method 'Woody Force Method'

Applicable to sandy and clayey soil in Hyogo Prefecture! This is an ecological construction method that utilizes small-diameter thinned timber as ground reinforcement material for housing, taking the environment into consideration!

The Woody Force method is a ground reinforcement technique aimed at small-scale buildings, utilizing unused thinned timber. This method uses thin-diameter thinned timber of "sugi" (Japanese cedar) or "hinoki" (Japanese cypress), which is somewhat too slender for use as house pillars and has been largely underutilized, as ground reinforcement material for houses, making it eco-friendly. By applying anti-corrosion and anti-termite treatment that complies with AQ certification (certification for quality wood building materials, etc.) B-3 (outdoor product components) to the wood used as ground reinforcement material, we aim to further enhance durability. 【Features】 ■ CO2 Reduction - Does not use cement or steel, which emit large amounts of CO2 during the manufacturing process - Contributes to energy conservation and reduction of greenhouse gases ■ Durability - By applying anti-corrosion and anti-termite treatment that complies with AQ certification B-3 to the wood used as ground reinforcement material, we aim to further enhance durability. *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Free Diagnosis] Ground Investigation Data Diagnosis and Analysis Service

Diagnosis is free! We will analyze your company's ground survey data from JHS's multifaceted perspective.

In the "Ground Investigation Data Diagnosis and Analysis Service," we utilize the "Residential Ground Information System," which has accumulated over 20 years of experience and know-how from JHS across the country, to diagnose not only the investigation data but also the appropriate ground from multiple perspectives. A quality guarantee certificate can be issued even for direct foundations and ground requiring countermeasures. The warranty period is up to 20 years from the construction period plus the handover date. The diagnosis is free, so why not try our high-precision analysis? 【Features】 ■ Diagnosis from JHS's multifaceted perspective ■ Diagnosis of appropriate ground from multiple perspectives, not just investigation data ■ Free diagnosis can be determined with investigation data only ■ A quality guarantee certificate can be issued even for direct foundations and ground requiring countermeasures ■ Warranty period is up to 20 years from the construction period plus the handover date *For more details, please refer to the PDF materials or feel free to contact us.

  • Site and ground investigation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

先端翼を有する小口径柱状地盤補強「SSW-Pile」

直径350mmの先端翼が、安心のくらしをささえます!

「SSW-Pile工法」は、直径216.3mmのケーシングの先端に独自に開発した直径350mmの先端翼を取り付け、生コンなどを打設します。 使用する軸部材は生コンなどを打設するため、ローコストで品質が安定しています。 また、残土排出はほとんどなく、施工による土圧は鋼管杭と同程度で、まわりの建物への悪影響は少なくて済みます。 施工時に粉じんが舞うこともありません。 もちろん、低騒音・低振動です。 【特長】 ○証明された信頼性:GBRC建築技術性能証明取得 第12-28号(改) ○ローコスト・安定した品質 ○より環境へやさしく 詳しくはお問い合わせ、またはカタログをダウンロードしてください。

  • Aggregates and crushed stone
  • Earth retaining wall/foundation reinforcement
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Civil engineering and architecture longevity technology solutions

Introducing aluminum steel structure truss-type sluice gate roofs and the Cabocon method!

Preserving a rich environment through repair, maintenance, recycling, and renovation. We introduce our longevity technology solutions for civil engineering and construction. We offer aluminum steel structure truss-type sluice gates, paper sludge soil improvement solidifying agent "Harden," and the Epoguard system, among others. Our company adopts many construction methods registered in the Ministry of Land, Infrastructure, Transport and Tourism's New Technology Utilization System (NETIS). 【Handled Systems/Methods (Excerpt)】 ■ CCFP-CABOCON Method (Cabocon Method) ■ AT-P Method ■ CSC System ■ Epoguard System ■ S-1 Method *For more details, please refer to the PDF materials or feel free to contact us.

  • Other civil engineering works
  • Coating film waterproofing material/permeable waterproofing material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Bell method

"PVC Pipe Long-Distance Curved Pushing Method" - The world's first pushing technology that contributes to reducing life cycle costs.

The Bell method is a "world-first system" that significantly reduces maintenance costs for sewer pipes and contributes to their longevity. 【Features】 1. Long-distance thrust Unlike conventional methods, the allowable thrust length is not limited by the pipe's allowable load capacity, allowing for long-distance thrust of up to 250 meters even with low-load capacity pipes. 2. Curved thrust The tunneling machine is equipped with two directional correction devices, enabling multiple curved thrusts of up to 60R. 3. Response to obstacles If unexpected obstacles are encountered during tunneling, it is possible to retreat and proceed with a detour alignment. 4. Shortened construction period By adopting an autonomous measurement robot for in-pipe surveying, there is no decrease in daily progress due to the number of curves or curvature radius. Additionally, using the Bell method thrust pipe (1.33m pipe) reduces setup changes by 33% compared to 1m pipes, enhancing work efficiency. 5. Longevity Long-distance and curved thrust is achieved with durable and earthquake-resistant PVC pipes, contributing to the longevity of sewer pipes. 6. Earthquake resistance High earthquake-resistant SUS color is used. The joint section of the thrust pipe maintains water tightness up to an angle of 3 degrees, preventing water and soil from entering. For more details, please feel free to contact us.

  • Civil Engineering Method
  • Water Supply Facilities
  • Sewerage facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Cobra method

Next-generation excavation work: mud-water and mud-soil pressure single-process small-diameter thrusting.

Full soil type compatibility from ordinary soil to bedrock! Economical due to starting from a small shaft! Achieves speedy advancement with a single process! Rolling stop with joint pipes!! That's why it's fast!! That's why the straightness accuracy is good!! 【Features】 1. Wide range of soil type adaptability 2. Realization of smaller shafts 3. Increased convenience for retrieval 4. Advancement of 200m per span 5. Compact in all aspects 6. Addresses ground issues 7. Construction can be performed by selecting the excavation method according to soil type 8. Not only single-component lubricants, but also two-component lubricants can be injected according to soil type For more details, please feel free to contact us.

  • Civil Engineering Method
  • Water Supply Facilities
  • Sewerage facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil bag method

NETIS registration! An environmentally friendly construction method that does not use any solidifying agents.

The "Soil Bag Method" is an environmentally friendly foundation reinforcement technique that does not use any solidifying materials, including cement, by utilizing the "D·Box." The "D·Box" generates significant friction between soil particles, providing various effects such as ground reinforcement, vibration reduction, and liquefaction countermeasures. In particular, it can compact itself regardless of ground reaction, allowing for reinforcement effects even in extremely soft ground such as marshes, which are typically considered difficult. 【Features】 ■ The D·Box is completely permeable to water, so it does not affect the underground environment when installed in the soil. ■ Since the D·Box essentially just encapsulates soil particles, it can reduce CO2 emissions. ■ It has effects equivalent to surface improvement, allowing for efficient ground reinforcement construction. ■ It simultaneously achieves ground reinforcement and vibration reduction, offering excellent cost-effectiveness. ■ It can increase the strength of the surrounding ground where the D·Box is installed. For more details, please feel free to contact us.

  • Ground foundation construction method
  • Residential foundations
  • Earth retaining wall/foundation reinforcement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

HiroWork Kmighty Method

NETIS registration! The "full-length extraction method" pulls out existing piles with ultra-low vibration and ultra-low noise.

By combining a specially developed flexible casing and an auger drilling motor to generate rotational force with a high-pressure water jet, this "full-length extraction method" releases the friction between existing piles and the ground, allowing for the extraction of existing piles with ultra-low vibration and ultra-low noise. 【Features】 1. NETIS registration No. KT-120066-A 2. Ultra-low vibration and ultra-low noise 3. Compatible with inclined piles 4. Suitable for close proximity and narrow space construction 5. High work efficiency for various pile types with high-pressure water jet 6. Step construction is possible 7. Reduction of work time 8. Safety during operation For more details, please refer to the catalog or feel free to contact us.

  • Civil Engineering Method
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Case Study: "Building Construction"

"Total support from the ground to the building" We are showcasing examples of construction work.

In recent years, Japan has experienced natural disasters that can destroy everyday life, starting with the Great East Japan Earthquake. Each time a disaster occurs, it has become an era where everyone feels anxious, wondering, "Is my home okay?" or "Is my workplace okay?" In light of this, our company has seriously discussed how we can contribute to society with technology specialized in ground stability. We have established a new "Construction Department" and are launching a new business that leverages our experience and achievements in specialized civil engineering work. We will create a safer and more secure living environment for our customers, not only through new construction, renovations, repairs, and maintenance, but also by implementing energy-saving measures and addressing foundation and underground issues.

  • Renovation and repair methods
  • Roof and gutter construction
  • Waterproofing work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude slide construction method

It is a full casing (full rotary) method that enables work up to a depth of 4.4 meters.

We have made it possible to carry out construction that was previously impossible. - Foundation work inside the gymnasium: Previously, part of the wall had to be demolished to bring in machinery, but it is now possible to bring in equipment without altering the current state. - Foundation work along the railway: Work that requires crane booms to extend higher than the tracks is typically done at night, but since we do not use cranes, daytime work is possible. - Bridge widening and under-beam work: Heavy machinery can access the existing under-beam area, allowing vehicles to continue using the existing bridge during construction. - Work under high-voltage power lines: Construction under high-voltage power lines is also feasible.

  • Foundation construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shinbee method

Ground improvement method using soil-cement columns with thin-walled steel pipes.

■ Performance-Proven Construction Method Building Technology Performance Certification GBRC Performance Certification No. 13-04 Rev. 2 This method has been reviewed by a third-party organization, which certifies the performance of the technology. ■ High Load-Bearing Capacity and High Strength This method combines the benefits of steel pipes with stable quality and strength of columnar improvement bodies. ■ High-Quality Mixing The specialized mixer, equipped with a comb section and eight blades, provides high-quality mixing. ■ Wide Range of Soil Types This method can accommodate a wider range of soil types than typical columnar improvement methods, as the steel pipes can complement quality and strength to mitigate variations in strength due to soil type. ■ Short Construction Period Due to high surface friction and quality, it is possible to shorten the pile length compared to conventional columnar improvement methods, leading to a reduction in construction time. ■ Suitable for Narrow Sites Heavy machinery is selected based on site conditions to advance the project more efficiently.

  • Pile and foundation work
  • Ground foundation construction method
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration