Next-generation floor-first construction method "DFP Method"
A new concept that enables the movement of flexible partition walls! Introducing the next-generation floor-first construction method.
The "DFP Method" is a next-generation floor-first construction method that employs a newly developed "removable support base" for reinforcement adjusters. It allows for the installation of reinforcement adjusters under the floor without removing the pace panels, as well as the removal of panels from below. By using this method, there is no need to break the pre-floor when moving partition walls, making it easier to relocate walls and extending the period for plan changes during new construction, as well as reducing flooring costs and shortening construction time during renovations. 【Features】 ■ A new concept that enables flexible movement of partition walls ■ Adoption of reinforcement adjusters using the newly developed "removable support base" ■ No need to break the pre-floor when moving partition walls ■ Reduction of flooring costs and shortening of construction time during renovations *For more details, please refer to the PDF document or feel free to contact us.
- Company:淡路技建
- Price:Other