Construction method Product List and Ranking from 43 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Aug 27, 2025~Sep 23, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Aug 27, 2025~Sep 23, 2025
This ranking is based on the number of page views on our site.

  1. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  2. 東網工業 Niigata//Building materials, supplies and fixtures manufacturers
  3. 太洋基礎工業 Aichi//General contractors and subcontractors
  4. 4 桐井製作所 Tokyo//Building materials, supplies and fixtures manufacturers
  5. 5 ASAHI KASEI ADVANCE CORPORATION 環境資材事業部 Tokyo//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Aug 27, 2025~Sep 23, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. SQ method 桐井製作所
  3. Crushed Stone Utilization Basket Method "Crushed Stone Box - saisekibako -" 東網工業
  4. 4 Coating material, coating agent "Friction Cutter" ASAHI KASEI ADVANCE CORPORATION 環境資材事業部
  5. 5 Construction method "Two-Line Welding Method (Two-Line Mesh Method)" ワイビーテクノ 東京事務所

Construction method Product List

571~576 item / All 576 items

Displayed results

[Concrete Product Example] Mie Prefecture: Flagpole Base with a Bucket Foundation

I made a base for raising a flag! A request from a local gas station.

Here is a product example of the "Flag Stand Pail Can Foundation" in Mie Prefecture. This was requested by a local gas station. A foundation was made for the flag stand using a common pail can and PVC pipe that they provided. Please feel free to contact us if you have any requests. 【Case Overview】 ■Product Dimensions: Flag Stand Pail Can Foundation ■Construction Location: Watarai District, Mie Prefecture ■Construction Period: January 2021 *For more details, please refer to the related links or feel free to contact us.

  • Other civil engineering services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude double-R construction method LH-RR method

By using a low-head type pile driver and a low-head type special auger in this construction method, it is possible to perform construction with a low head!

The "Low Headroom Double R Method LH-RR Method" enables construction in high N-value layers such as soft rock and gravel with low vibration and low noise using small foundation machinery. Traditionally, ground that required large foundation machinery can now be constructed using a leaderless pile driving machine weighing between 20t and 40t, equipped with a high torque auger ranging from 70.7 to 98kNm, utilizing main body pressure input and a special auger head for hard ground. Additionally, the removal of obstacles and crushing methods underground can also be performed by changing attachments. 【Low Headroom Special Auger Performance (Partial)】 ■ Auger Type: AGD7000 ■ Weight (kg): 1,720 ■ Operating Pressure/Flow Rate: 27.4Mpa・220l/min ■ Base Machine Used: Hitachi Construction Machinery RX2300・SRX2700・RX3300 Low Headroom Dedicated Machines *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude head-down-the-hole hammer method LH-DH method

Down-the-hole hammer method under low ceilings, under bridges for railways and roads, and under power lines!

We would like to introduce our "Low-Headroom Down-the-Hole Hammer Method LH-DH Method." Using a driving device to rotate the down-the-hole hammer and bit, the piston inside the hammer cylinder is moved back and forth by air supplied from a high-pressure compressor. This movement causes the bit tip to strike and break stones and rock formations, while the excavated soil is removed using a screw and air lift method. To prevent wear and seizure inside the cylinder due to piston movement, it is necessary to spray oil into the air using a line oiler. 【Construction Examples (Partial)】 ■ LH-DH Method ・Height restriction: 4.55m (under special high-voltage lines) ・Steel material: H250 L=7.5 to 9.5m joint pile construction ・Construction machinery: RX2300 low-headroom construction machine, special auger for low headroom AGD7000 *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Kanto's pest control specialists! Trusted service.

Due to global warming and the increase in solitary living, the problem of mites is increasing in Tokyo, Kanagawa, Saitama, and Chiba.

In Tokyo's apartments and steel-framed buildings, damage from wood-boring beetles and longhorn beetles is increasing. Our company is well-versed in the characteristics of the Tokyo area and specializes in pest control for wood-boring beetles, longhorn beetles, and other wood pests in wooden structures. We also implement measures starting from the first year of construction, making early consultations effective. In Tokyo and Kanagawa Prefecture, there is a wide variety of ant species. Our company provides extermination methods suitable for the unique environment of Tokyo and Kanagawa. We strive for prompt responses, especially during the active months of July, September, and October. *For detailed information, please refer to the related links. For more details, you can download the PDF or feel free to contact us.

  • 関東の害虫駆除専門2.PNG
  • 関東の害虫駆除専門3.PNG
  • 関東の害虫駆除専門4.PNG
  • Pest and insect control products

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

RAKUYU-Z Method

Water replacement measures for the maintenance management era! Please feel free to consult us regarding any water replacement matters.

We would like to introduce the "RAKUYU-Z Method," which is promoted and advertised by our association. By using this method for water replacement, we can create an environment where the construction site remains completely dry (or at a water level suitable for construction) for a certain period without implementing drainage restrictions for local residents. This ensures safety and hygiene on-site, enhances the efficiency of the main construction work, and makes it easier to secure construction quality. Additionally, our association holds technical guidance, training sessions, and workshops related to the method. 【Features】 ■ Resolves interruptions in construction due to clogging ■ Numerous suction vehicles are deployed, moving away from piston transport ■ Suitable even in locations where submersible pumps cannot be installed inside manholes ■ Minimal impact on surrounding traffic for water replacement ■ Labor-saving through automatic pump control and patrol monitoring, with rapid response in case of accidents ■ Smooth installation and removal even for large-capacity water replacements *For more details, please download the PDF or feel free to contact us.

  • Sewerage facilities
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

ARUR (Asbestos Roof Urethane Renewal) method

Recommended as a construction method with excellent cost performance that can be implemented relatively inexpensively!

The "ARUR (Asbestos Roof Urea Renewal) Method" is a system that achieves long-term protection and maintenance-free longevity for asbestos-containing slate roofs over a period of 30 years. To realize this, we used advanced one-component reaction-curing urethane resin paint. Additionally, it is an environmentally considerate system that prevents the release of asbestos into the environment during the process. 【Features】 ■ Maintenance-free for 30 years, allowing for the longevity of the factory ■ A cost-effective method with waterproofing and heat insulation functions ■ Conducts asbestos treatment with environmental considerations, preventing troubles with neighboring residents *For more details, please download the PDF or feel free to contact us.

  • Roof and gutter construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration