[Construction Example] Shin-Omura Station
Introducing examples where the Hyperbolard HYP-01A (underground type) is widely adopted!
Here is a case study of the construction at Shin-Oomura Station. A large number of Hyper Bollards HYP-01A (underground type) have been adopted in the station's front square. High corrosion-resistant steel pipes (ZAM steel pipes) have been used for the post covers and sleeve piles, ensuring not only aesthetic appeal but also long-lasting impact resistance. 【Case Overview】 ■ Product: HYP-01A (underground type) ■ Construction Location: Shin-Oomura Station *For more details, please refer to the PDF document or feel free to contact us.
- Company:帝金
- Price:Other