[Construction Case] Hakata Connector
Introducing a case where a bollard treated with zinc phosphate (color tone N4) was adopted!
Here is an introduction to a construction case study at the Hakata Connector. For the boundary between the pedestrian walkway and the roadway, we adopted bollards treated with zinc phosphate (color tone N4). Additionally, our signature vertical barrier was also treated with zinc phosphate and adopted. 【Case Overview】 ■ Treatment: Zinc phosphate treatment (color tone N4) ■ Construction Facility: Hakata Connector *For more details, please refer to the PDF document or feel free to contact us.
- Company:帝金
- Price:Other